926 resultados para model complexity
Resumo:
Two distinct maintenance-data-models are studied: a government Enterprise Resource Planning (ERP) maintenance-data-model, and the Software Engineering Industries (SEI) maintenance-data-model. The objective is to: (i) determine whether the SEI maintenance-data-model is sufficient in the context of ERP (by comparing with an ERP case), (ii) identify whether the ERP maintenance-data-model in this study has adequately captured the essential and common maintenance attributes (by comparing with the SEI), and (iii) proposed a new ERP maintenance-data-model as necessary. Our findings suggest that: (i) there are variations to the SEI model in an ERP-context, and (ii) there are rooms for improvements in our ERP case’s maintenance-data-model. Thus, a new ERP maintenance-data-model capturing the fundamental ERP maintenance attributes is proposed. This model is imperative for: (i) enhancing the reporting and visibility of maintenance activities, (ii) monitoring of the maintenance problems, resolutions and performance, and (iii) helping maintenance manager to better manage maintenance activities and make well-informed maintenance decisions.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
Despite the best intentions of service providers and organisations, service delivery is rarely error-free. While numerous studies have investigated specific cognitive, emotional or behavioural responses to service failure and recovery, these studies do not fully capture the complexity of the services encounter. Consequently, this research develops a more holistic understanding of how specific service recovery strategies affect the responses of customers by combining two existing models—Smith & Bolton’s (2002) model of emotional responses to service performance and Fullerton and Punj’s (1993) structural model of aberrant consumer behaviour—into a conceptual framework. Specific service recovery strategies are proposed to influence consumer cognition, emotion and behaviour. This research was conducted using a 2x2 between-subjects quasi-experimental design that was administered via written survey. The experimental design manipulated two levels of two specific service recovery strategies: compensation and apology. The effect of the four recovery strategies were investigated by collecting data from 18-25 year olds and were analysed using multivariate analysis of covariance and multiple regression analysis. The results suggest that different service recovery strategies are associated with varying scores of satisfaction, perceived distributive justice, positive emotions, negative emotions and negative functional behaviour, but not dysfunctional behaviour. These finding have significant implications for the theory and practice of managing service recovery.
Resumo:
A mathematical model for the galvanostatic discharge and recovery of porous, electrolytic manganese dioxide cathodes, similar to those found within primary alkaline batteries is presented. The phenomena associated with discharge are modeled over three distinct size scales, a cathodic (or macroscopic) scale, a porous manganese oxide particle (or microscopic) scale, and a manganese oxide crystal (or submicroscopic) scale. The physical and chemical coupling between these size scales is included in the model. In addition, the model explicitly accounts for the graphite phase within the cathode. The effects that manganese oxide particle size and proton diffusion have on cathodic discharge and the effects of intraparticle voids and microporous electrode structure are predicted using the model.