898 resultados para international construction
Resumo:
A new sparse kernel density estimator is introduced. Our main contribution is to develop a recursive algorithm for the selection of significant kernels one at time using the minimum integrated square error (MISE) criterion for both kernel selection. The proposed approach is simple to implement and the associated computational cost is very low. Numerical examples are employed to demonstrate that the proposed approach is effective in constructing sparse kernel density estimators with competitive accuracy to existing kernel density estimators.
Resumo:
We propose a new sparse model construction method aimed at maximizing a model’s generalisation capability for a large class of linear-in-the-parameters models. The coordinate descent optimization algorithm is employed with a modified l1- penalized least squares cost function in order to estimate a single parameter and its regularization parameter simultaneously based on the leave one out mean square error (LOOMSE). Our original contribution is to derive a closed form of optimal LOOMSE regularization parameter for a single term model, for which we show that the LOOMSE can be analytically computed without actually splitting the data set leading to a very simple parameter estimation method. We then integrate the new results within the coordinate descent optimization algorithm to update model parameters one at the time for linear-in-the-parameters models. Consequently a fully automated procedure is achieved without resort to any other validation data set for iterative model evaluation. Illustrative examples are included to demonstrate the effectiveness of the new approaches.
Resumo:
Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.
Resumo:
Construction professional service (CPS) firms sell expertise and provide innovative solutions for projects founded on their knowledge, experience, and technical competences. Large CPS firms seeking to grow will often seek new opportunities in their domestic market and overseas by organic or inorganic growth through mergers, alliances, and acquisitions. Growth can also come from increasing market penetration through vertical, horizontal, and lateral diversification. Such growth, hopefully, leads to economies of scope and scale in the long term, but it can also lead to diseconomies, when the added cost of integration and the increased complexity of diversification no longer create tangible and intangible benefits. The aim of this research is to investigate the key influences impacting on the growth in scope and scale for large CPS firms. Qualitative data from the interviews were underpinned by secondary data from CPS firms’ annual reports and analysts’ findings. The findings showed five key influences on the scope and scale of a CPS firm: the importance of growth as a driver; the influence of the ownership of the firm on the decision for growth in scope and scale; the optimization of resources and capabilities; the need to serve changing clients’ needs; and the importance of localization. The research provides valuable insights into the growth strategies of international CPS firms. A major finding of the research is the influence of ownership on CPS firms’ growth strategies which has not been highlighted in previous research.
Resumo:
Expert systems have been increasingly popular for commercial importance. A rule based system is a special type of an expert system, which consists of a set of ‘if-then‘ rules and can be applied as a decision support system in many areas such as healthcare, transportation and security. Rule based systems can be constructed based on both expert knowledge and data. This paper aims to introduce the theory of rule based systems especially on categorization and construction of such systems from a conceptual point of view. This paper also introduces rule based systems for classification tasks in detail.
Resumo:
A geometrical construction of the transcomplex numbers was given elsewhere. Here we simplify the transcomplex plane and construct the set of transcomplex numbers from the set of complex numbers. Thus transcomplex numbers and their arithmetic arise as consequences of their construction, not by an axiomatic development. This simplifes transcom- plex arithmetic, compared to the previous treatment, but retains totality so that every arithmetical operation can be applied to any transcomplex number(s) such that the result is a transcomplex number. Our proof establishes the consistency of transcomplex and transreal arithmetic and establishes the expected containment relationships amongst transcomplex, complex, transreal and real numbers. We discuss some of the advantages the transarithmetics have over their partial counterparts.
Resumo:
There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
As the built environment accounts for much of the world's emissions, resource consumption and waste, concerns remain as to how sustainable the sector is. Understanding how such concerns can be better managed is complex, with a range of competing agendas and institutional forces at play. This is especially the case in Nigeria where there are often differing priorities, weak regulations and institutions to deal with this challenge. Construction firms are in competition with each other in a market that is growing in size and sophistication yearly. The business case for sustainability has been argued severally in literature. However, the capability of construction firms with respect to sustainability in Nigeria has not been studied. This paper presents the preliminary findings of an exploratory multi-case study carried out to understand the firm's views on sustainability as a source of competitive advantage. A international firm and a lower medium-sized indigenous firm were selected for this purpose. Qualitative interviews were conducted with top-level management of both firms, with key themes from the sustainable construction and dynamic capabilities literature informing the case study protocol. The interviews were transcribed and analysed with the use of NVivo software. The findings suggest that the multinational firm is better grounded in sustainability knowledge. Although the level of awareness and demand for sustainable construction is generally very poor, few international clients are beginning to stimulate interest in sustainable buildings. This has triggered both firms to build their capabilities in that regard, albeit in an unhurried manner. Both firms agree on the potentials of market-driven sustainability in the long term. Nonetheless, more drastic actions are required to accelerate the sustainable construction agenda in Nigeria.
Resumo:
This paper proposes a spatial-temporal downscaling approach to construction of the intensity-duration-frequency (IDF) relations at a local site in the context of climate change and variability. More specifically, the proposed approach is based on a combination of a spatial downscaling method to link large-scale climate variables given by General Circulation Model (GCM) simulations with daily extreme precipitations at a site and a temporal downscaling procedure to describe the relationships between daily and sub-daily extreme precipitations based on the scaling General Extreme Value (GEV) distribution. The feasibility and accuracy of the suggested method were assessed using rainfall data available at eight stations in Quebec (Canada) for the 1961-2000 period and climate simulations under four different climate change scenarios provided by the Canadian (CGCM3) and UK (HadCM3) GCM models. Results of this application have indicated that it is feasible to link sub-daily extreme rainfalls at a local site with large-scale GCM-based daily climate predictors for the construction of the IDF relations for present (1961-1990) and future (2020s, 2050s, and 2080s) periods at a given site under different climate change scenarios. In addition, it was found that annual maximum rainfalls downscaled from the HadCM3 displayed a smaller change in the future, while those values estimated from the CGCM3 indicated a large increasing trend for future periods. This result has demonstrated the presence of high uncertainty in climate simulations provided by different GCMs. In summary, the proposed spatial-temporal downscaling method provided an essential tool for the estimation of extreme rainfalls that are required for various climate-related impact assessment studies for a given region.