911 resultados para Risk Adjusted Return on Capital
Resumo:
Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
How does ownership structure affect capital structure and firm value?:Recent evidence from East Asia
Resumo:
The present paper examines the effects of ownership structures on capital structure and firm valuation. It argues that the effects of separation of control from cash flow rights on capital structure and firm value also depend on the separation of control from management as well as on legal rules and enforcement defining investors' protection. We obtain firm-level panel data (three stage least squares, 3SLS) estimates from four of the East Asian countries worst affected by the last crisis. There is evidence that the general wisdom that higher control than cash flow rights may lower firm value may be reversed among owner-managed family firms in the sample countries. © 2007 The Authors Journal compilation © 2007 The European Bank for Reconstruction and Development.
Resumo:
For some time there has been a puzzle surrounding the seasonal behaviour of stock returns. This paper demonstrates that there is an asymmetric relationship between systematic risk and return across the different months of the year for both large and small firms. In the case of both large and small firms systematic risk appears to be priced in only two months of the year, January and April. During the other months no persistent relationship between systematic risk and return appears to exist. The paper also shows that when systematic risk is priced, the size of the systematic risk premium is higher for large firms than for small firms and varies significantly across the months of the year.
Resumo:
OBJECTIVE: To assess the effect of using different risk calculation tools on how general practitioners and practice nurses evaluate the risk of coronary heart disease with clinical data routinely available in patients' records. DESIGN: Subjective estimates of the risk of coronary heart disease and results of four different methods of calculation of risk were compared with each other and a reference standard that had been calculated with the Framingham equation; calculations were based on a sample of patients' records, randomly selected from groups at risk of coronary heart disease. SETTING: General practices in central England. PARTICIPANTS: 18 general practitioners and 18 practice nurses. MAIN OUTCOME MEASURES: Agreement of results of risk estimation and risk calculation with reference calculation; agreement of general practitioners with practice nurses; sensitivity and specificity of the different methods of risk calculation to detect patients at high or low risk of coronary heart disease. RESULTS: Only a minority of patients' records contained all of the risk factors required for the formal calculation of the risk of coronary heart disease (concentrations of high density lipoprotein (HDL) cholesterol were present in only 21%). Agreement of risk calculations with the reference standard was moderate (kappa=0.33-0.65 for practice nurses and 0.33 to 0.65 for general practitioners, depending on calculation tool), showing a trend for underestimation of risk. Moderate agreement was seen between the risks calculated by general practitioners and practice nurses for the same patients (kappa=0.47 to 0.58). The British charts gave the most sensitive results for risk of coronary heart disease (practice nurses 79%, general practitioners 80%), and it also gave the most specific results for practice nurses (100%), whereas the Sheffield table was the most specific method for general practitioners (89%). CONCLUSIONS: Routine calculation of the risk of coronary heart disease in primary care is hampered by poor availability of data on risk factors. General practitioners and practice nurses are able to evaluate the risk of coronary heart disease with only moderate accuracy. Data about risk factors need to be collected systematically, to allow the use of the most appropriate calculation tools.
Resumo:
How does a firm choose a proper model of foreign direct investment (FDI) for entering a foreign market? Which mode of entry performs better? What are the performance implications of joint venture (JV) ownership structure? These important questions face a multinational enterprise (MNE) that decides to enter a foreign market. However, few studies have been conducted on such issues, and no consistent or conclusive findings are generated, especially with respect to China. It’s composed of five chapters, providing corresponding answers to the questions given above. Specifically, Chapter One is an overall introductory chapter. Chapter Two is about the choice of entry mode of FDI in China. Chapter Three examines the relationship between four main entry modes and performance. Chapter Four explores the performance implications of JV ownership structure. Chapter Five is an overall concluding chapter. These empirical studies are based on the most recent and richest data that has never been explored in previous studies. It contains information on 11,765 foreign-invested enterprises in China in seven manufacturing industries in 2000, 10,757 in 1999, and 10,666 in 1998. The four FDI entry modes examined include wholly-owned enterprises (WOEs), equity joint ventures (EJVs), contractual joint ventures (CJVs), and joint stock companies (JSCs). In Chapter Two, a multinominal logit model is established, and techniques of multiple linear regression analysis are employed in Chapter Three and Four. It was found that MNEs, under the conditions of a good investment environment, large capital commitment and small cultural distance, prefer the WOE strategy. If these conditions are not met, the EJV mode would be of greater use. The relative propensity to pursue the CJV mode increases with a good investment environment, small capital commitment, and small cultural distance. JSCs are not favoured by MNEs when the investment environment improves and when affiliates are located in the coastal areas. MNEs have been found to have a greater preference for an EJV as a mode of entry into the Chinese market in all industries. It is also found that in terms of return on assets (ROA) and asset turnover, WOEs perform the best, followed by EJVs, CJVs, and JSCs. Finally, minority-owned EJVs or JSCs are found to outperform their majority-owned counterparts in terms of ROA and asset turnover.
Resumo:
Corporate restructuring is perceived as a challenge to research. Prior studies do not provide conclusive evidence regarding the effects of restructuring. Since there are discernible findings, this research attempts to examine the effects of restructuring events amongst the UK listed firms. The sample firms are listed in the LSE and London AIM stock exchange. Only completed restructuring transactions are included in the study. The time horizon extends from year 1999 to 2003. A three-year floating window is assigned to examine the sample firms. The key enquiry is to scrutinise the ex post effects of restructuring on performance and value measures of firms with contrast to a matched criteria non-restructured sample. A cross sectional study employing logit estimate is undertaken to examine firm characteristics of restructuring samples. Further, additional parameters, i.e. Conditional Volatility and Asymmetry are generated under the GJR-GARCH estimate and reiterated in logit models to capture time-varying heteroscedasticity of the samples. This research incorporates most forms of restructurings, while prior studies have examined certain forms of restructuring. Particularly, these studies have made limited attempts to examine different restructuring events simultaneously. In addition to logit analysis, an event study is adopted to evaluate the announcement effect of restructuring under both the OLS and GJR-GARCH estimate supplementing our prior results. By engaging a composite empirical framework, our estimation method validates a full appreciation of restructuring effect. The study provides evidence that restructurings indicate non-trivial significant positive effect. There are some evidences that the response differs because of the types of restructuring, particularly while event study is applied. The results establish that performance measures, i.e. Operating Profit Margin, Return on Equity, Return on Assets, Growth, Size, Profit Margin and Shareholders' Ownership indicate consistent and significant increase. However, Leverage and Asset Turn Over suggest reasonable influence on restructuring across the sample period. Similarly, value measures, i.e. Abnormal Returns, Return on Equity and Cash Flow Margin suggest sizeable improvement. A notable characteristic seen coherently throughout the analysis is the decreasing proportion of Systematic Risk. Consistent with these findings, Conditional Volatility and Asymmetry exhibit similar trend. The event study analysis suggests that on an average market perceives restructuring favourably and shareholders experience significant and systematic positive gain.
Resumo:
For some time there has been a puzzle surrounding the seasonal behaviour of stock returns. This paper demonstrates that there is an asymmetric relationship between risk and return across the different months of the year. The paper finds that systematic risk is only priced during the months of January, April and July. Variance risk and firm size are priced during several months of the year including January. An analysis of the relative behaviour of size based securities reveals that firm capitalization makes a valuable contribution to the magnitude of risk premiums.
Resumo:
Purpose – The purpose of this study is to examine dividend policies in an emerging capital market, in a country undergoing a transitional period. Design/methodology/approach – Using pooled cross-sectional observations from the top 50 listed Egyptian firms between 2003 and 2005, this study examines the effect of board of directors’ composition and ownership structure on dividend policies in Egypt. Findings – It is found that there is a significant positive association between institutional ownership and firm performance, and both dividend decision and payout ratio. The results confirm that firms with a higher return on equity and a higher institutional ownership distribute higher levels of dividend. No significant association was found between board composition and dividend decisions or ratios. Originality/value – This study provides additional evidence of the applicability of the signalling model in the emerging market of Egypt. It was found that despite the high institutional ownership and the closely held nature of the firms, which imply lower agency costs, the payment of higher dividend was considered necessary to attract capital during this transitional period.
Resumo:
Objectives: To conduct an independent evaluation of the first phase of the Health Foundation's Safer Patients Initiative (SPI), and to identify the net additional effect of SPI and any differences in changes in participating and non-participating NHS hospitals. Design: Mixed method evaluation involving five substudies, before and after design. Setting: NHS hospitals in United Kingdom. Participants: Four hospitals (one in each country in the UK) participating in the first phase of the SPI (SPI1); 18 control hospitals. Intervention: The SPI1 was a compound (multicomponent) organisational intervention delivered over 18 months that focused on improving the reliability of specific frontline care processes in designated clinical specialties and promoting organisational and cultural change. Results: Senior staff members were knowledgeable and enthusiastic about SPI1. There was a small (0.08 points on a 5 point scale) but significant (P<0.01) effect in favour of the SPI1 hospitals in one of 11 dimensions of the staff questionnaire (organisational climate). Qualitative evidence showed only modest penetration of SPI1 at medical ward level. Although SPI1 was designed to engage staff from the bottom up, it did not usually feel like this to those working on the wards, and questions about legitimacy of some aspects of SPI1 were raised. Of the five components to identify patients at risk of deterioration - monitoring of vital signs (14 items); routine tests (three items); evidence based standards specific to certain diseases (three items); prescribing errors (multiple items from the British National Formulary); and medical history taking (11 items) - there was little net difference between control and SPI1 hospitals, except in relation to quality of monitoring of acute medical patients, which improved on average over time across all hospitals. Recording of respiratory rate increased to a greater degree in SPI1 than in control hospitals; in the second six hours after admission recording increased from 40% (93) to 69% (165) in control hospitals and from 37% (141) to 78% (296) in SPI1 hospitals (odds ratio for "difference in difference" 2.1, 99% confidence interval 1.0 to 4.3; P=0.008). Use of a formal scoring system for patients with pneumonia also increased over time (from 2% (102) to 23% (111) in control hospitals and from 2% (170) to 9% (189) in SPI1 hospitals), which favoured controls and was not significant (0.3, 0.02 to 3.4; P=0.173). There were no improvements in the proportion of prescription errors and no effects that could be attributed to SPI1 in non-targeted generic areas (such as enhanced safety culture). On some measures, the lack of effect could be because compliance was already high at baseline (such as use of steroids in over 85% of cases where indicated), but even when there was more room for improvement (such as in quality of medical history taking), there was no significant additional net effect of SPI1. There were no changes over time or between control and SPI1 hospitals in errors or rates of adverse events in patients in medical wards. Mortality increased from 11% (27) to 16% (39) among controls and decreased from17%(63) to13%(49) among SPI1 hospitals, but the risk adjusted difference was not significant (0.5, 0.2 to 1.4; P=0.085). Poor care was a contributing factor in four of the 178 deaths identified by review of case notes. The survey of patients showed no significant differences apart from an increase in perception of cleanliness in favour of SPI1 hospitals. Conclusions The introduction of SPI1 was associated with improvements in one of the types of clinical process studied (monitoring of vital signs) and one measure of staff perceptions of organisational climate. There was no additional effect of SPI1 on other targeted issues nor on other measures of generic organisational strengthening.
Developing a probabilistic graphical structure from a model of mental-health clinical risk expertise
Resumo:
This paper explores the process of developing a principled approach for translating a model of mental-health risk expertise into a probabilistic graphical structure. The Galatean Risk Screening Tool [1] is a psychological model for mental health risk assessment based on fuzzy sets. This paper details how the knowledge encapsulated in the psychological model was used to develop the structure of the probability graph by exploiting the semantics of the clinical expertise. These semantics are formalised by a detailed specification for an XML structure used to represent the expertise. The component parts were then mapped to equivalent probabilistic graphical structures such as Bayesian Belief Nets and Markov Random Fields to produce a composite chain graph that provides a probabilistic classification of risk expertise to complement the expert clinical judgements. © Springer-Verlag 2010.
Resumo:
Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.
Resumo:
Reliability modelling and verification is indispensable in modern manufacturing, especially for product development risk reduction. Based on the discussion of the deficiencies of traditional reliability modelling methods for process reliability, a novel modelling method is presented herein that draws upon a knowledge network of process scenarios based on the analytic network process (ANP). An integration framework of manufacturing process reliability and product quality is presented together with a product development and reliability verification process. According to the roles of key characteristics (KCs) in manufacturing processes, KCs are organised into four clusters, that is, product KCs, material KCs, operation KCs and equipment KCs, which represent the process knowledge network of manufacturing processes. A mathematical model and algorithm is developed for calculating the reliability requirements of KCs with respect to different manufacturing process scenarios. A case study on valve-sleeve component manufacturing is provided as an application example of the new reliability modelling and verification procedure. This methodology is applied in the valve-sleeve component manufacturing processes to manage and deploy production resources.