The crack and seat (C & S) method of rehabilitating concrete pavements has been proposed to reduce the incidence of reflective cracking in asphalt overlays. These cracked pieces help reduce the thermal effects on lateral joint movement while the seating of slab pieces reduces vertical movement. This 1986 project demonstrated that a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern was optimal to retard reflective cracking in an asphalt overlay. The best performance among three C & S test sections was section 4 with a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern and 7.6 cm (3 in) overlay. Structural ratings determined from the Road Rater™ indicated little difference between each C & S section with varying AC thicknesses and crack spacings. Although reflection cracking is reduced in the early years after construction, the effectiveness of the C & S method diminishes over time.
Resumo:
A field program of strain and deflection measurements was conducted by the Construction Technology Laboratories (CTL) for the Iowa Department of Transportation. The objective of the field measurement program was to obtain information on bonded concrete resurfaced pavements that can be used as a data base for verifying bonded resurfacing thickness design procedures. Data gathered during the investigation included a visual condition survey, engineering properties of the original and resurfacing concrete, load related strain and deflection measurements, and temperature related curl (deflection) measurements. Resurfacing is basically the addition of a surface layer to extend the life of an existing pavement. Portland cement concrete has been used to resurface existing pavements since about 1913.
Resumo:
Innovative Rail Ltd. of Cedar Rapids, Iowa produced a new rail/highway crossing gate arm that shows promise in two areas: a. Minimizing arm breakage, and b. Added target value to motorists. The new gate was demonstrated to the Chicago and North Western Transportation Company, and that railroad has requested its use at two crossings on an "experimental basis" to determine if its installation provides relief in those areas. On April 18, 1986, the Department observed a test of the material under field conditions with the Transportation Company. The gate received four mid-center strikes at 5 MPH by a company truck while in the lowered position, and showed no damage. In a fifth mid-center strike at 15 MPH, the gate was visibly damaged at the connection to its raising mechanism, but continued to function though at a 5-10 degree drop. Several pictures of the gate and its saddle mechanism are shown in Appendix A of this report. Innovative Rail established distributorships in the United States and Canada, and has since gone out of business.
Resumo:
This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. This five-year program documents $3.2 billion of highway and bridge construction projects on the primary road system using federal and state funding. Of that funding, a little over $500 million is available due to the passage of Senate File 257 in February 2015. As required by Senate File 257, this program includes a list of the critical highway and bridge projects funded with the additional revenue. As with other recent programs, there continues to be uncertainty in federal funding for roads and bridges. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire July 31, 2015. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able to provide funding at current levels. This could result in reduced federal funding reimbursement for projects already underway and/or full elimination of federal highway funding for new projects in federal fiscal year 2016. These two issues provide funding uncertainty with this program in fiscal year 2016 and beyond.
Resumo:
Based on the conclusions of IHRB Project TR-444, Demonstration Project Using Railroad Flat Car Bridges for Low Volume Road Bridges, additional research on the use of RRFC bridges was undertaken. This portion of the project investigated the following: (1) Different design and rating procedures; (2) Additional single span configurations plus multiple span configurations; (3) Different mechanisms for connecting adjacent RRFCs and the resulting lateral load distribution factors; (4) Sheet pile abutments; and (5) Behavior RRFCs that had been strengthened so that they could be used on existing abutments. A total of eight RRFC bridges were tested (five single span bridges, two two-span bridges, and one three-span bridge). Based on the results of this study a simplified design and rating procedure has been developed for the economical replacement bridge alternative. In Volume 1, this volume, the results from the testing of four single span RRFC bridges are presented, while in Volume 2 the results from the testing of the strengthened single span bridge plus the three multiple span bridges are presented.
Resumo:
Based on the conclusions of IHRB Project TR-444, Demonstration Project Using Railroad Flat Car Bridges for Low Volume Road Bridges, additional research on the use of RRFC bridges was undertaken. This portion of the project investigated the following: (1) Different design and rating procedures; (2) Additional single span configurations plus multiple span configurations; (3) Different mechanisms for connecting adjacent RRFCs and the resulting lateral load distribution factors; (4) Sheet pile abutments; and (5) Behavior RRFCs that had been strengthened so that they could be used on existing abutments. A total of eight RRFC bridges were tested (five single span bridges, two two-span bridges, and one three-span bridge). Based on the results of this study a simplified design and rating procedure has been developed for the economical replacement bridge alternative. In Volume 1, the results from the testing of four single span RRFC bridges are presented, while in Volume 2,this volume, the results from the testing of the strengthened single span bridge plus the three multiple span bridges are presented.
Resumo:
Transportation map of Iowa, updated march 1, 2014. map focuses on interstate highways, primary and secondary state roads, county roads, and scenic byways. Also includes railroad lines, airports, waterways, and locks and dams. All 99 counties are represented, as well as approximately 1,000 cities and towns. Points of interest are also marked. This record contains images of both the front and the back of the map.
Resumo:
This is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.
Resumo:
The purpose of performance measures in planning operations is to identify and track meaningful, quantifiable measures that reflect progress toward the goals of the plan. The Iowa Department of Transportation (DOT) has already adopted performance measures in a number of operational areas, including highway maintenance, highway safety, public transportation, and aeronautics. This report is an initial effort to utilize performance measures for transportation system planning. The selected measures provide a cross-section of system performance indicators across three selected transportation planning goals (safety, efficiency, and quality of life) and five transportation modes (highways/bridges, public transit, railroads, aviation, and pedestrian/bicycle). These performance measures are exploratory in nature, and constitute a first attempt to apply performance measures in the context of a statewide, multimodal transportation plan from the Iowa DOT. As such, the set of performance measures that the Iowa DOT uses for planning will change over time as more is learned about the application of such measures. The performance measures explained in this document were developed through consultation with Iowa DOT modal staff (aviation, railroads, highways, public transportation, and pedestrian/bicycle) and the Office of Traffic and Safety. In addition, faculty and staff at the Iowa State University Center for Transportation Research and Education were consulted about performance measurement and data within their areas of expertise.
Resumo:
The Dickinson SWCD is applying for $486,800 over three years from the Watershed Improvement Fund to enhance water quality in Dickinson County through an impairment-based, locally directed watershed improvement project dealing specifically with storm water runoff. The LID Project will provide a cost share incentive and technical expertise to individual and business owners in specially targeted districts who are willing to implement low impact development techniques such as rain gardens, bioswales, pervious paving to reduce storm water runoff from their properties. Goals for the project include: 1) Defining and prioritizing urban watersheds in the Iowa Great Lakes region for implementation of Low Impact Development Practices; 2) Providing technical expertise in the form of a graduate assistant/project manager to design and oversee construction; 3) Continuing public education of such practices and their local existence through project kiosk, brochures, County Naturalist programs, local cable television shows, tours and other interactions of the Clean Water Alliance with its 50 partners in the area concerned about water quality; and 4) Completing 125 separate projects over a three year period.
Resumo:
This is the Iowa Department of Transportation's summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the Midwest regional rail system and the state’s passenger rail service.
Resumo:
This is a study of how transportation policy can be fashioned to improve Iowa's long-term economic prospects. The research focuses on the state level and covers pricing, resource allocation, investment, and other issues that directly affect the performance of public facilities that support transportation of goods and people to and from points in Iowa. Chapter 1 is an introduction. Chapter 2 begins with an assessment of how Iowa's economy is changing, both functionally and spatially. Commuting patterns and methods of goods movement are then discussed. The purpose of this analysis is to provide a context for the exploration of transportation policy issues in subsequent chapters. In Chapter 3 a framework is established for evaluating changes in transportation policies. A working definition of economic development is given and the role of government policies in making an area more attractive to economic activity is considered. Chapter 4 analyzes public policy options for Iowa's roads and highways. These policy options are intended to help the state compete for economic activity. Chapter 5 assesses alternative investment strategies for major navigational facilities on the upper Mississippi River. Chapter 6 examines major transportation policy issues in Iowa's agricultural sector. The current magnitude of agricultural shipments and the roles of several modes are presented. After focusing on issues related to railroad competitiveness, the analysis turns to how Iowa's rural roads should be financed. The need for joint investment and pricing decisions affecting waterways, railroads, and rural roads is stressed. Chapter 7 examines the current status of freight transportation in Iowa. An assessment is made of issues related to trucking and of intermodal transportation and its potential for cost-effective shipping to and from businesses in Iowa. Chapter 8 summarizes the key findings of this study, offering ten recommendations. These recommendations relate to transportation as a means of facilitating economic development.
Resumo:
Sähkömoottorin jatkuva-aikainen kunnonvalvonta vaatii tiedonsiirtoa moottorilta ylemmälle tietojärjestelmätasolle, kuten taajuusmuuttajalle. Uusien kaapeleiden asennus on työlästä ja kallista. Moottorin ja taajuusmuuttajan välillä on kuitenkin aina kaapeli, jota käytetään moottorin tehonsyöttöön. Tätä kaapelia on mahdollista käyttää myös tiedonsiirtokanavana. Tässä diplomityössä käsitellään ja tutkitaan sähköverkkotiedonsiirtomenetelmää, jonka avulla voidaan muodostaa Ethernet-yhteys moottorilta taajuusmuuttajalle tai toisinpäin. Työssä kehitetään simulointimalli tiedonsiirtokanavan taajuusriippuvan vaimennuksen simuloimiseen. Lisäksi kehitetään kytkentärajapinta, joka mahdollistaa tiedonsiirron kolmivaiheisessa taajuusmuuttajan syöttämässä moottorikaapelissa. Työssä suunnitellaan ja toteutetaan tiedonsiirtoa varten pilot-laitteisto, jolla tehdään laboratoriotestit. Laboratoriotesteillä varmistetaan menetelmän soveltuvuus. Laboratoriotestien avulla etsitään myös reunaehdot tiedonsiirron toiminnalle ja tiedonsiirtonopeuteen vaikuttavia tekijöitä taajuusmuuttajakäytössä. Lisäksi tarkastellaan menetelmän aiheuttamaa viivettä, joka on tärkeäsäätösovellusten kannalta. Lopuksi arvioidaan menetelmän soveltuvuus käytännön sovelluksiin.
Resumo:
Tässä diplomityössä on tutkittu mahdollisuuksia ennakoida ja havaita kaapelivikoja mahdollisimman varhaisessa vaiheessa teleoperaattorin liityntäverkosta, joka käsittää optisen rajapinnan ja asiakkaan välisen parikaapeleilla toteutetun osan verkkoa. Liityntäverkon ikääntyessä kaapeleiden ja liitosten viat yleistyvät sekä niiden korjauskustannukset kasvavat. Mahdollisimmanvarhaisessa vaiheessa vikoja havaitsemalla ehkäistään vikojen laajentumista sekä asiakkaiden palveluiden katkeamista. Kannattavin tapa toteuttaa liityntäverkon vikoja ennakoiva järjestelmä Elisa Oyj:n tapauksessa on hyödyntää yrityksessä uudistettua DSL-tekniikkaa. DSLAM:eilla päivittäin suoritetuilla mittauksilla voidaan havaita liityntäverkon kaapeleiden kunnon heikkeneminen sekä vikaantumiset. Työssä on tutkittu vikatapausten aiheuttamia muutoksia linjojen sähköisiin ominaisuuksiin sekä niiden näkymistä mittaustuloksissa. Työssä löydettiin menetelmät toteuttaa liityntäverkon kuntoa mittaava ja tarkkaileva järjestelmä. Ennakoivalla toiminnalla voidaan aikaansaada merkittäviä kustannussäästöjä viankorjausprosessin eri vaiheissa sekä parantaa palveluiden laatua.