812 resultados para Ignition Delay
Resumo:
We investigate the spectrum of certain integro-differential-delay equations (IDDEs) which arise naturally within spatially distributed, nonlocal, pattern formation problems. Our approach is based on the reformulation of the relevant dispersion relations with the use of the Lambert function. As a particular application of this approach, we consider the case of the Amari delay neural field equation which describes the local activity of a population of neurons taking into consideration the finite propagation speed of the electric signal. We show that if the kernel appearing in this equation is symmetric around some point a= 0 or consists of a sum of such terms, then the relevant dispersion relation yields spectra with an infinite number of branches, as opposed to finite sets of eigenvalues considered in previous works. Also, in earlier works the focus has been on the most rightward part of the spectrum and the possibility of an instability driven pattern formation. Here, we numerically survey the structure of the entire spectra and argue that a detailed knowledge of this structure is important within neurodynamical applications. Indeed, the Amari IDDE acts as a filter with the ability to recognise and respond whenever it is excited in such a way so as to resonate with one of its rightward modes, thereby amplifying such inputs and dampening others. Finally, we discuss how these results can be generalised to the case of systems of IDDEs.
Resumo:
This paper analyzes the delay performance of Enhanced relay-enabled Distributed Coordination Function (ErDCF) for wireless ad hoc networks under ideal condition and in the presence of transmission errors. Relays are nodes capable of supporting high data rates for other low data rate nodes. In ideal channel ErDCF achieves higher throughput and reduced energy consumption compared to IEEE 802.11 Distributed Coordination Function (DCF). This gain is still maintained in the presence of errors. It is also expected of relays to reduce the delay. However, the impact on the delay behavior of ErDCF under transmission errors is not known. In this work, we have presented the impact of transmission errors on delay. It turns out that under transmission errors of sufficient magnitude to increase dropped packets, packet delay is reduced. This is due to increase in the probability of failure. As a result the packet drop time increases, thus reflecting the throughput degradation.
Resumo:
In 1967 a novel scheme was proposed for controlling processes with large pure time delay (Fellgett et al, 1967) and some of the constituent parts of the scheme were investigated (Swann, 1970; Atkinson et al, 1973). At that time the available computational facilities were inadequate for the scheme to be implemented practically, but with the advent of modern microcomputers the scheme becomes feasible. This paper describes recent work (Mitchell, 1987) in implementing the scheme in a new multi-microprocessor configuration and shows the improved performance it provides compared with conventional three-term controllers.
Resumo:
This work investigates the optimum decision delay and tap-length of the finite-length decision feedback equalizer. First we show that, if the feedback filter (FBF) length Nb is equal to or larger than the channel memory v and the decision delay Δ is smaller than the feedforward filter (FFF) length Nf, then only the first Δ+1 elements of the FFF can be nonzero. Based on this result we prove that the maximum effective FBF length is equal to the channel memory v, and if Nb ≥ v and Nf is long enough, the optimum decision delay that minimizes the MMSE is Nf-1.
Resumo:
The power of an adaptive equalizer is maximized when the structural parameters including the tap-length and decision delay can be optimally chosen. Although the method for adjusting either the tap-length or decision delay has been proposed, adjusting both simultaneously becomes much more involved as they interact with each other. In this paper, this problem is solved by putting a linear prewhitener before the equalizer, with which the equivalent channel becomes maximum-phase. This implies that the optimum decision delay can be simply ¯xed at the tap-length minus one, while the tap-length can then be chosen using a similar approach as that proposed in our previous work.
Resumo:
Presents a method for model based bilateral control of master-slave arm with time delay between master and slave arms, where the system supports cooperative action between manual and automatic modes. The method realises efficiencies in master-slave arm control with the simplicities of a computer and the flexibility of a skilled human operator.
Resumo:
The time taken to consider development proposals within the English planning system continues to provoke great policy concern despite a decade of inquiry and policy change. The results of an extensive site-based survey and hedonic modelling exercise across 45 local authorities are reported here. The analysis reveals a slow, uncertain system. It identifies planning delay as a serious problem for housing supply and its ability to respond to increases in demand. Only a relatively limited set of factors seem relevant in explaining differences in times and the results suggest that 80% of councils’ performances are statistically indistinguishable from each other. These findings question the policy emphasis put on rankings of local authorities, though some influence from local politics is apparent. Development control is consistently a lengthy and uncertain process due to its complexity. Therefore, success in lowering planning delay is only likely through radical simplification.
Resumo:
The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.