973 resultados para Grant funded projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Free and Open Source Software (FOSS) has gained increased interest in the computer software industry, but assessing its quality remains a challenge. FOSS development is frequently carried out by globally distributed development teams, and all stages of development are publicly visible. Several product and process-level quality factors can be measured using the public data. This thesis presents a theoretical background for software quality and metrics and their application in a FOSS environment. Information available from FOSS projects in three information spaces are presented, and a quality model suitable for use in a FOSS context is constructed. The model includes both process and product quality metrics, and takes into account the tools and working methods commonly used in FOSS projects. A subset of the constructed quality model is applied to three FOSS projects, highlighting both theoretical and practical concerns in implementing automatic metric collection and analysis. The experiment shows that useful quality information can be extracted from the vast amount of data available. In particular, projects vary in their growth rate, complexity, modularity and team structure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Theories of deliberative politics position grass-roots community members as more than spectators of politics, and instead recognize their capacity for political engagement by discussing and evaluating options in order to make decisions about issues affecting community life. The processes and products of journalism can assist deliberative politics by providing community members with information resources that are vital for understanding the root causes of problems, weighing up competing claims, forming networks around shared concerns, reaching decisions and undertaking action. This article presents the findings of case studies of four community–classroom projects--one each from Australia, New Zealand, the United States and South Africa--that develop the capacity of journalism students to be effective contributors to deliberative politics. The research points to the importance of learning activities that prepare students to work in diverse communities, map significant community places and structures, identify leaders and stakeholders, engage in respectful dialogue about problems and perspectives, and appreciate community frames and values.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project began in 2013, with the award of an internal QUT Teaching and Learning grant. The task we wished to undertake was to document and better understand the role of studio teaching practice in the Creative Industries Faculty. While it was well understood that the Faculty had long used studio pedagogies as a key part of its teaching approach, organizational and other changes made it productive and timely to consider how the various study areas within the Faculty were approaching studio teaching. Chief among these changes were innovations in the use of technology in teaching, and at an organizational level the merging of what were once two schools within different faculties into a newly-structured Creative Industries Faculty. The new faculty consists of two schools, Media, Entertainment and Creative Art (MECA) and Design. We hoped to discover more about how studio techniques were developing alongside an ever-increasing number of options for content delivery, assessment, and interaction with students. And naturally we wanted to understand such developments across the broad range of nineteen study areas now part of the Creative Industries Faculty. This e-book represents the first part of our project, which in the main consisted in observing the teaching practices used in eight units across the Faculty, and then interviews with the unit coordinators involved. In choosing units, we opted for a broad opening definition of ‘studio’ to include not only traditional studios but also workshops and tutorials in which we could identify a component of studio teaching as enumerated by the Australian Learning and Teaching Council’s Studio Teaching Project: • A culture, a creative community created by a group of students and studio teachers working together for periods of time • A mode of teaching and learning where students and studio teachers interact in a creative and reflective process • A program of projects and activities where content is structured to enable ‘learning in action’ • A physical space or constructed environment in which the teaching and learning can take place (Source: http://www.studioteaching.org/?page=what_is_studio) The units we chose to observe, and which we hoped would represent something of the diversity of our study areas, were: • Dance Project 1 • Furniture Studies • Wearable Architecture • Fashion Design 4 • Industrial Design 6 • Advanced Writing Practice 3 • Introduction to Creative Writing • Studio Art Practice 2 Over the course of two semesters in 2013, we attended classes, presentations, and studio time in these units, and then conducted interviews that we felt would give further insight into both individual and discipline-specific approaches to studio pedagogies. We asked the same questions in each of the interviews: • Could you describe the main focus and aims of your unit? • How do you use studio time to achieve those aims? • Can you give us an example of the kind of activities you use in your studio teaching? • What does/do these example(s) achieve in terms of learning outcomes? • What, if any, is the role of technology in your studio teaching practice? • What do you consider distinctive about your approach to studio teaching, or the approach taken in your discipline area? The unit coordinators’ responses to these questions form some of the most interesting and valuable material in this book, and point to both consistencies in approach and teaching philosophies, as well as areas of difference. We believe that both can help to raise our critical awareness of studio teaching, and provide points of comparison for the future development of studio pedagogy in the Creative Industries. In each of the following pages, the interviews are placed alongside written descriptions of the units, their aims and outcomes, assessment models, and where possible photographs and video footage, as well as additional resources that may be useful to others engaged in studio teaching.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article examines some of the ways in which Australia’s First Peoples have responded to serious community health concerns about alcohol through the medium of popular music. The writing, performing and recording of popular songs about alcohol provide an important example of community-led responses to health issues, and the effectiveness of music in communicating stories and messages about alcohol has been recognised through various government-funded recording projects. This article describes some of these issues in remote Australian Aboriginal communities, exploring a number of complexities that arise through arts-based ‘instrumentalist’ approaches to social and health issues. It draws on the author’s own experience and collaborative work with Aboriginal musicians in Tennant Creek, a remote town in Australia’s Northern Territory.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many developing countries are experiencing rapid expansion in mining with associated water impacts. In most cases mining expansion is outpacing the building of national capacity to ensure that sustainable water management practices are implemented. Since 2011, Australia's International Mining for Development Centre (IM4DC) has funded capacity building in such countries including a program of water projects. Five projects in particular (principally covering experiences from Peru, Colombia, Ghana, Zambia, Indonesia, Philippines and Mongolia) have provided insight into water capacity building priorities and opportunities. This paper reviews the challenges faced by water stakeholders, and proposes the associated capacity needs. The paper uses the evidence derived from the IM4DC projects to develop a set of specific capacity-building recommendations. Recommendations include: the incorporation of mine water management in engineering and environmental undergraduate courses; secondments of staff to suitable partner organisations; training to allow site staff to effectively monitor water including community impacts; leadership training to support a water stewardship culture; training of officials to support implementation of catchment management approaches; and the empowerment of communities to recognise and negotiate solutions to mine-related risks. New initiatives to fund the transfer of multi-disciplinary knowledge from nations with well-developed water management practices are called for.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction firms that employ collaborative procurement approaches develop operating routines through joint learning so as to improve infrastructure project performance. This paper reports a study based on a survey sample of 320 construction practitioners which were involved in collaborative infrastructure delivery in Australia. The study developed valid and reliable scales for measuring collaborative learning capability (CLC), and used the scales to evaluate the CLC of contractor and consultant firms within the sample. The evaluation suggests that whilst these firms explore knowledge from both internal and external sources, transform both explicit and tacit knowledge, and apply and internalise new knowledge, they can improve the extent to which these routines are applied to optimise project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A key trait of Free and Open Source Software (FOSS) development is its distributed nature. Nevertheless, two project-level operations, the fork and the merge of program code, are among the least well understood events in the lifespan of a FOSS project. Some projects have explicitly adopted these operations as the primary means of concurrent development. In this study, we examine the effect of highly distributed software development, is found in the Linux kernel project, on collection and modelling of software development data. We find that distributed development calls for sophisticated temporal modelling techniques where several versions of the source code tree can exist at once. Attention must be turned towards the methods of quality assurance and peer review that projects employ to manage these parallel source trees. Our analysis indicates that two new metrics, fork rate and merge rate, could be useful for determining the role of distributed version control systems in FOSS projects. The study presents a preliminary data set consisting of version control and mailing list data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A key trait of Free and Open Source Software (FOSS) development is its distributed nature. Nevertheless, two project-level operations, the fork and the merge of program code, are among the least well understood events in the lifespan of a FOSS project. Some projects have explicitly adopted these operations as the primary means of concurrent development. In this study, we examine the effect of highly distributed software development, is found in the Linux kernel project, on collection and modelling of software development data. We find that distributed development calls for sophisticated temporal modelling techniques where several versions of the source code tree can exist at once. Attention must be turned towards the methods of quality assurance and peer review that projects employ to manage these parallel source trees. Our analysis indicates that two new metrics, fork rate and merge rate, could be useful for determining the role of distributed version control systems in FOSS projects. The study presents a preliminary data set consisting of version control and mailing list data.