868 resultados para Construction projects
Resumo:
Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.
Resumo:
The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.
Resumo:
The construction industry accounts for a significant portion of the material consumption of our industrialised societies. That material consumption comes at an environmental cost, and when buildings and infrastructure projects are demolished and discarded, after their useful lifespan, that environmental cost remains largely unrecovered. The expected operational lifespan of modern buildings has become disturbingly short as buildings are replaced for reasons of changing cultural expectations, style, serviceability, locational obsolescence and economic viability. The same buildings however are not always physically or structurally obsolete; the materials and components within them are very often still completely serviceable. While there is some activity in the area of recycling of selected construction materials, such as steel and concrete, this is almost always in the form of down cycling or reprocessing. Very little of this material and component resource is reuse in a way that more effectively captures its potential. One significant impediment to such reuse is that buildings are not designed in a way that facilitates easy recovery of materials and components; they are designed and built for speed of construction and quick economic returns, with little or no consideration of the longer term consequences of their physical matter. This research project explores the potential for the recovery of materials and components if buildings were designed for such future recovery; a strategy of design for disassembly. This is not a new design philosophy; design for disassembly is well understood in product design and industrial design. There are also some architectural examples of design for disassembly; however these are specialist examples and there is no significant attempt to implement the strategy in the main stream construction industry. This paper presents research into the analysis of the embodied energy in buildings, highlighting its significance in comparison with operational energy. Analysis at material, component, and whole-of-building levels shows the potential benefits of strategically designing buildings for future disassembly to recover this embodied energy. Careful consideration at the early design stage can result in the deconstruction of significant portions of buildings and the recovery of their potential through higher order reuse and upcycling.
Resumo:
This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.
Resumo:
Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.
Resumo:
Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.
Resumo:
There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.
Resumo:
The delivery of products and services for construction-based businesses is increasingly becoming knowledge-driven and information-intensive. The proliferation of building information modelling (BIM) has increased business opportunities as well as introduced new challenges for the architectural, engineering and construction and facilities management (AEC/FM) industry. As such, the effective use, sharing and exchange of building life cycle information and knowledge management in building design, construction, maintenance and operation assumes a position of paramount importance. This paper identifies a subset of construction management (CM) relevant knowledge for different design conditions of building components through a critical, comprehensive review of synthesized literature and other information gathering and knowledge acquisition techniques. It then explores how such domain knowledge can be formalized as ontologies and, subsequently, a query vocabulary in order to equip BIM users with the capacity to query digital models of a building for the retrieval of useful and relevant domain-specific information. The formalized construction knowledge is validated through interviews with domain experts in relation to four case study projects. Additionally, retrospective analyses of several design conditions are used to demonstrate the soundness (realism), completeness, and appeal of the knowledge base and query-based reasoning approach in relation to the state-of-the-art tools, Solibri Model Checker and Navisworks. The knowledge engineering process and the methods applied in this research for information representation and retrieval could provide useful mechanisms to leverage BIM in support of a number of knowledge intensive CM/FM tasks and functions.
Resumo:
"Safety of RMAA works is an almost uncharted topic of rising importance internationally. Small construction contractors are particularly dependant on RMAA work, especially during times of recession, and they undertake more risks on these jobs than large companies do. This book is based on unique international research and consultancy projects which detail, investigate, and suggest solutions to the specific challenges of safety in RMAA works, based on case studies. Starting with an overview of safety in the wider construction industries of developed countries, the first half of this book also provides a comprehensive summary of relevant rules, regulations, and the resulting safety performances. The systems in the UK, US and Hong Kong are described and contrasted, giving the reader an understanding of how different regulatory approaches have yielded a variety of results. From this solid introduction, specific problems observed in RMAA work are examined through case studies, with reference to the underlying cultural and demographic factors, and a variety of practical engineering and management solutions are explored. This important and practical international work is essential reading for postgraduate students of health and safety in construction, construction project management, or construction in developing countries, as well as policy-makers and construction project managers."--Publisher website
Resumo:
This article reports on a cross-sectional case study of a large construction project in which Electronic document management (EDM) was used. Attitudes towards EDM from the perspective of individual end users were investigated. Responses from a survey were combined with data from system usage log files to obtain an overview of attitudes prevalent in different user segments of the total population of 334 users. The survey was followed by semi-structured interviews with representative users. A strong majority of users from all segments of the project group considered EDM as a valuable aid in their work processes, despite certain functional limitations of the system used and the complexity of the information mass. Based on the study a model describing the key factors affecting end user EDM adoption is proposed. The model draws on insight from earlier studies of EDM enabled projects and theoretical frameworks on technology acceptance and success of information systems, as well as the insights gained from the case study.
Resumo:
The recent advances in urban wireless communications and protocols that spurred the development of city-wide wireless infrastructure motivated this research, since in many cases, construction sites are not conveniently located for wired connectivity. Large scale transportation projects for example, such as new highways, railroad tracks and the networks of utilities (power-lines, phone lines, mobile towers, etc) that usually follow them are constructed in areas where wired infrastructure for data exchange is often expensive and time-consuming to deploy. The communication difficulties that can be encountered in such construction sites can be addressed with a wireless communications link between the construction site and the decision-making office. This paper presents a case study on long-range, wireless communications suitable for data exchange between construction sites and engineering headquarters. The purpose of this study was to define the requirements for a reliable wireless communications model where common types of electronic construction data will be exchanged in a fast and efficient manner, and construction site personnel will be able to interact and share knowledge, information and electronic resources with the office staff.
Resumo:
This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
Garda Youth Diversion Projects (GYDPs) have since their beginnings in the early 1990s gained an increasingly important role and now constitute a central feature of Irish youth justice provision. Managed by the Irish Youth Justice Service and implemented by the Gardai and a variety of youth work organisations as well as independent community organisations, GYDPs are located at the crossroads of welfarist and corporatist approaches to youth justice, combining diversionary and preventative aspects in their work. To date, these projects have been subjected to very little systematic analysis and they have thus largely escaped critical scrutiny. To address this gap, this thesis locates the analysis of GYDP policy and practice within a post-structuralist theoretical framework and deploys discourse analysis primarily based on the work of Michel Foucault. It makes visible the official youth crime prevention and GYDP policy discourses and identifies how official discourses relating to youth crime prevention, young people and their offending behaviour, are drawn upon, negotiated, rejected or re-contextualised by project workers and JLOs. It also lays bare how project workers and JLOs draw upon a variety of other discourses, resulting in multi-layered, complex and sometimes contradictory constructions of young people, their offending behaviour and corresponding interventions. At a time when the projects are undergoing significant changes in terms of their repositioning to operate as the support infrastructure underpinning the statutory Garda Youth Diversion Programme, the thesis traces the discursive shifts and the implications for practice that are occurring as the projects move away from a youth work orientation towards a youth justice orientation. A key contribution of this thesis is the insight it provides into how young people and their families are being constituted in individualising and sometimes pathologising ways in GYDP discourses and practices. It reveals the part played by the GYDP intervention in favouring individual and narrow familial causes of offending behaviour while broader societal contexts are sidelined. By explicating the very assumptions upon which contemporary youth crime prevention policy, as well as GYDP policy and practice are based, this thesis offers a counterpoint to the prevailing evidence-based agenda of much research in the field of Irish youth justice theory and youth studies more generally. Rather, it encourages the reader to take a step back and examine some of the most fundamental and unquestioned assumptions about the construction of young people, their offending behaviour and ways of addressing this, in contemporary Irish youth crime prevention policy and practice.