1000 resultados para Construction Timeline
Resumo:
There is increasing concern about the impact of employees’ alcohol and other drug (AOD) consumption on workplace safety, particularly within the construction industry. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgment from AODs. This research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. Using the Alcohol Use Disorders Identification Test (AUDIT), the study will adopt both quantitative and qualitative methods to evaluate the extent of general AOD use in the industry. Results indicate that a proportion of the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off score for risky alcohol use with 43 respondents (15%) scoring in the significantly ‘at risk’ category. Other drug use was also identified as a major issue that must be addressed. Results support the need for evidence-based, preventative educational initiatives that are tailored specifically to the construction industry.
Resumo:
Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.
Resumo:
Australia is currently experiencing a resources boom and jobs in the male dominated fields of construction and engineering are at a premium. Employment in the construction industry, historically and today, is overwhelmingly male and, with an ageing population this predominately older male workforce will be retiring in greater numbers in the coming decade. Despite more that 25 years of anti- discrimination legislation and equal opportunity legislation these industries still employ few women in operational roles. This paper investigates the issue of the low representation of women in the construction industry. Our investigation involves the analysis of 95 organisation progress reports on the equal opportunity strategic programs in the construction industry. Findings indicate that this industry is not engaging with equal employment opportunity programs and further that equity outcomes for women in the industry are not evident.
Resumo:
A graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Of dogs, fish, birds and turds : the social construction of sewage pollution by recreational boaters
Resumo:
Animals are often used as ‘evidence’ of marine pollution. Take for instance the ubiquitous images of miserable oil-soaked marine birds following high profile oil spills such as the Exxon Valdez, Pacific Adventurer and Deepwater Horizon incidents or the images of bloated floating fish carcasses which are used to signal the presence of toxic pollutants. In recent years waste discharges from vessels have come under increased public and regulatory scrutiny both in Australia and around the world. International, regional, national and local restrictions are becoming more stringent for high profile marine pollutants such as oil as well as previously overlooked vessel-sourced pollutants such as sewage. Drawing upon media reports and recreational boater responses to government attempts to regulate the discharge of sewage from recreational vessels, this paper considers the important role played by animals in constructions of marine pollution by sewage and attributions of blame for this pollution. Specifically, this study found that recreational boat owners disputed claims their sewage management practices posed an environmental threat arguing that the sewage discharged was readily and eagerly consumed by fish in the receiving environment. Boat owners also argued that increased levels of bacteria which indicate the presence of faeces within the marine environment could be directly attributed to the excrement of marine mammals and birds or were the result of dog faeces being washed through municipal storm water systems rather than the result of vessel discharges. By contrast the contamination of oysters was provided as evidence of sewage pollution by other stakeholders.
Resumo:
Construction contracts often provide that the decision of an independent certifier is final and binding. The effect of a contractual term like this has been debated in the courts over time. This paper considers the binding nature of certificates in the context of traditional construction contract arrangements and also considers the implications for more complex contracts like those entered into to facilitate public private partnerships. This article considers the response of the courts and the drafting implications and argues that a different focus would be advantageous.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.
Resumo:
Incorporating engineering concepts into middle school curriculum is seen as an effective way to improve students’ problem-solving skills. A selection of findings is reported from a science, technology, engineering and mathematics (STEM)-based unit in which students in the second year (grade 8) of a three-year longitudinal study explored engineering concepts and principles pertaining to the functioning of simple machines. The culminating activity, the focus of this paper, required the students to design, construct, test, and evaluate a trebuchet catapult. We consider findings from one of the schools, a co-educational school, where we traced the design process developments of four student groups from two classes. The students’ descriptions and explanations of the simple machines used in their catapult design are examined, together with how they rated various aspects of their engineering designs. Included in the findings are students’ understanding of how their simple machines were simulated by the resources supplied and how the machines interacted in forming a complex machine. An ability to link physical materials with abstract concepts and an awareness of design constraints on their constructions were apparent, although a desire to create a ‘‘perfect’’ catapult despite limitations in the physical materials rather than a prototype for testing concepts was evident. Feedback from teacher interviews added further insights into the students’ developments as well as the teachers’ professional learning. An evolving framework for introducing engineering education in the pre-secondary years is proposed.
Resumo:
Countless studies have stressed the importance of social identity, particularly its role in various organizational outcomes, yet questions remain as to how identities initially develop, shift and change based on the configuration of multiple, pluralistic relationships grounded in an organizational setting. The interactive model of social identity formation has been proposed recently to explain the internalization of shared norms and values – critical in identity formation – has not received empirical examination. We analyzed multiple sources of data from nine nuclear professionals over three years to understand the construction of social identity in new entrants entering an organization. Informed by our data analyses, we found support for the interactive model and that age and level of experience influenced whether they undertook an inductive or deductive route of the group norm and value internalization. This study represents an important contribution to the study of social identity and the process by which identities are formed, particularly under conditions of duress or significant organizational disruption.
Resumo:
The skill shortage issues have long existed in the construction industry in countries like Australia. Couple this with the lead and lag time between market demand and resultant supply has traditionally seen cyclical fluctuation of skills demand within the construction industry. Skills demand and shortages are generally well documented and can even have a level of predictability in Australia given the tendency to have a delayed reaction to global economic downturns. Sustainability issues in the construction industry have attracted growing public awareness. Traditionally driven by ever increasing, if only gradual, mandated minimum requirements, drive towards sustainable developments is now increasingly being created by the client. As this demand increases, accordingly a demand for people with the skills to provide these services should be felt. This research examines the green skill shortage issues within the context of construction industry. Stakeholders from across relevant sectors of the built environment were engaged to ascertain the industry’s utilisation and demand for ‘green skilled’ personnel. These findings will assist stakeholders within the construction industry in negating the effects of a skills shortage in the event of accelerated demand for sustainable construction.
Resumo:
Construction has been plagued with serious injuries and deaths for years. Although the technological advances have made the world safer and healthier, researchers have noted that some safety interventions, which had clear objective safety benefits, had failed to achieve the forecast savings in lives and injuries. The purpose of this study was to explore whether the construction workers show risk compensation and engage in greater risk taking when certain types of safety measures are implemented in the construction site. A case study approach was used to achieve the aim of this study. A typical construction site in Sydney was selected as the subject of the case study. Data were collected through direct observations, questionnaires and interviews. The findings confirm that workers show risk compensation behaviours in the construction environment. The risk compensation behaviours of workers varied with the level of experience and whether they have suffered from a past workplace injury. The findings of this study may offer a better understanding of workers’ behavioural patterns in construction environment and the effectiveness of safety interventions. The result of this study may provide supports for designing, implementing and evaluating safety interventions in construction site.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
Cell line array (CMA) and tissue microarray (TMA) technologies are high-throughput methods for analysing both the abundance and distribution of gene expression in a panel of cell lines or multiple tissue specimens in an efficient and cost-effective manner. The process is based on Kononen's method of extracting a cylindrical core of paraffin-embedded donor tissue and inserting it into a recipient paraffin block. Donor tissue from surgically resected paraffin-embedded tissue blocks, frozen needle biopsies or cell line pellets can all be arrayed in the recipient block. The representative area of interest is identified and circled on a haematoxylin and eosin (H&E)-stained section of the donor block. Using a predesigned map showing a precise spacing pattern, a high density array of up to 1,000 cores of cell pellets and/or donor tissue can be embedded into the recipient block using a tissue arrayer from Beecher Instruments. Depending on the depth of the cell line/tissue removed from the donor block 100-300 consecutive sections can be cut from each CMA/TMA block. Sections can be stained for in situ detection of protein, DNA or RNA targets using immunohistochemistry (IHC), fluorescent in situ hybridisation (FISH) or mRNA in situ hybridisation (RNA-ISH), respectively. This chapter provides detailed methods for CMA/TMA design, construction and analysis with in-depth notes on all technical aspects including tips to deal with common pitfalls the user may encounter. © Springer Science+Business Media, LLC 2011.