765 resultados para water shortages, risk management, business
Resumo:
The rural populations of southern Bangladesh are some of the most vulnerable communities in the world to the future impacts of climate change. They are particularly at risk from floods, waterlogged soils, and increasing salinity of both land and water. The objective of this project was to analyze the vulnerability of people in four villages that are experiencing different levels of soil salinity. The study evaluated the strengths and weaknesses of current coping strategies and assessed the potential of an index-based insurance scheme, designed diversification and better information products to improve adaptive capacity.
Resumo:
This book provides you with all fundamental concepts, guidelines and tools to ensure core business information is identified, protected and used effectively, written in a language that is clear and easy to understand for non-technical ...
Resumo:
This book provides you with all the fundamental concepts, guidelines and tools to ensure core business information is identified, protected and used effectively, and written in a language that is clear and easy to understand for non ...
Resumo:
The paper explores differences as well as commonalities in corporate risk management practices and risk exposures in the large non-financial Slovenian and Croatian companies. Comparative analysis of survey results have revealed that the majority of analysed companies in both Croatia and Slovenia are using some form of risk management to manage interest-rate, foreign exchange, or commodity price risk. Regarding the intensity of influence of financial risks on the performance of the analysed companies, the results have shown that the price risk has the highest influence among the Slovenian as well as the Croatian companies. Croatian companies are more affected by currency risk than the Slovenian companies, while the interest-rate risk has been ranged as less important in comparison with commodity price and currency risks. The survey’s results have clearly indicated that Croatian and Slovenian non-financial companies manage financial risks primarily with simple risk management instruments such as natural hedging. In the case of derivatives use, forwards and swaps are by far the most important instruments in both countries, but futures as representatives of standardised derivatives and structured derivatives are more important in the Slovenian than in the Croatian companies.
Resumo:
In a global business economy, firms have a broad range of corporate real estate needs. During the past decade, multiple strategies and tactics have emerged in the corporate real estate community for meeting those needs. We propose here a framework for analysing and prioritising the various types of risk inherent in corporate real estate decisions. From a business strategy perspective, corporate real estate must serve needs beyond the simple one of shelter for the workforce and production process. Certain uses are strategic in that they allow access to externalities, embody the business strategy, or provide entrée to new markets. Other uses may be tactical, in that they arise from business activities of relatively short duration or provide an opportunity to pre-empt competitors. Still other corporate real estate uses can be considered “core” to the existence of the business enterprise. These might be special use properties or may be generic buildings that have become embodiments of the organisation’s culture. We argue that a multi-dimensional matrix approach organised around three broad themes and nine sub-categories allow the decision-maker to organise and evaluate choices with an acceptable degree of rigor and thoroughness. The three broad themes are Use (divided into Core, Cyclical or Casual) – Asset Type (which can be Strategic, Specialty or Generic) and Market Environment (which ranges from Mature Domestic to Emerging Economy). Proper understanding of each of these groupings brings critical variables to the fore and allows for efficient resource allocation and enhanced risk management.
Resumo:
In the UK, urban river basins are particularly vulnerable to flash floods due to short and intense rainfall. This paper presents potential flood resilience approaches for the highly urbanised Wortley Beck river basin, south west of the Leeds city centre. The reach of Wortley Beck is approximately 6km long with contributing catchment area of 30km2 that drain into the River Aire. Lower Wortley has experienced regular flooding over the last few years from a range of sources, including Wortley Beck and surface and ground water, that affects properties both upstream and downstream of Farnley Lake as well as Wortley Ring Road. This has serious implications for society, the environment and economy activity in the City of Leeds. The first stage of the study involves systematically incorporating Wortley Beck’s land scape features on an Arc-GIS platform to identify existing green features in the region. This process also enables the exploration of potential blue green features: green spaces, green roofs, water retention ponds and swales at appropriate locations and connect them with existing green corridors to maximize their productivity. The next stage is involved in developing a detailed 2D urban flood inundation model for the Wortley Beck region using the CityCat model. CityCat is capable to model the effects of permeable/impermeable ground surfaces and buildings/roofs to generate flood depth and velocity maps at 1m caused by design storm events. The final stage of the study is involved in simulation of range of rainfall and flood event scenarios through CityCat model with different blue green features. Installation of other hard engineering individual property protection measures through water butts and flood walls are also incorporated in the CityCat model. This enables an integrated sustainable flood resilience strategy for this region.
Resumo:
This paper aimed to analyse supply chain risk factors in aerospace industry. It was conducted an exploratory research at an important Brazilian aerospace company. This company has a major role at the global aerospace industry. Senior managers assessed risk factors such as quality, productivity, supply chain, business strategy, organisation, environmental and natural political, indicators, product management, and information system. Analytic hierarchy process was applied to prioritise these factors. The most relevant were quality and productivity. Copyright © 2011 Inderscience Enterprises Ltd.
Resumo:
Includes bibliography
Resumo:
Irrigators in the Republican Basin and in parts of the North Platte Basin must learn to incorporate multiple year drought risk into their management plans, as they adapt to the limitations imposed by five-year pumping allocations. A major concern involves the implications of being water-short during the later years of the allocation period, because of an accumulative rainfall shortage or drought. Currently, producers can either ignore the risk of substantially lower incomes if their allocation is exhausted too soon, or reduce the risk by using less water early in the allocation period. The latter approach, however, may substantially reduce the present value of total net income over the five-year period. Alternatively, in the future it may be possible to use weather derivatives to manage income risk.
Analisi e riprogettazione del processo di ict risk management: un caso applicativo in Telecom Italia
Resumo:
Questo lavoro di tesi muove da tematiche relative alla sicurezza IT e risulta dagli otto mesi di lavoro all’interno della funzione Technical Security di Telecom Italia Information Technology. Il compito primario di questa unità di business è ridurre il rischio informatico dei sistemi di Telecom Italia per mezzo dell’attuazione del processo di ICT Risk Management, che coinvolge l’intera organizzazione ed è stato oggetto di una riprogettazione nel corso del 2012. Per estendere tale processo a tutti i sistemi informatici, nello specifico a quelli caratterizzati da non conformità, all’inizio del 2013 è stato avviato il Programma Strutturato di Sicurezza, un aggregato di quattro progetti dalla durata triennale particolarmente articolato e complesso. La pianificazione di tale Programma ha visto coinvolto, tra gli altri, il team di cui ho fatto parte, che ha collaborato con Telecom Italia assolvendo alcune delle funzioni di supporto tipiche dei Project Management Office (PMO).
Resumo:
Contracts paying a guaranteed minimum rate of return and a fraction of a positive excess rate, which is specified relative to a benchmark portfolio, are closely related to unit-linked life-insurance products and can be considered as alternatives to direct investment in the underlying benchmark. They contain an embedded power option, and the key issue is the tractable and realistic hedging of this option, in order to rigorously justify valuation by arbitrage arguments and prevent the guarantees from becoming uncontrollable liabilities to the issuer. We show how to determine the contract parameters conservatively and implement robust risk-management strategies.
Resumo:
It is a paradox that in a country with one of the most variable climates in the world, cropping decisions are sometimes made with limited consideration of production and resource management risks. There are significant opportunities for improved performance based on targeted information regarding risks resulting from decision options. WhopperCropper is a tool to help agricultural advisors and farmers capture these benefits and use it to add value to their intuition and experience. WhopperCropper allows probability analysis of the effects of a range of selectable crop inputs and existing resources on yield and economic outcomes. Inputs can include agronomic inputs (e.g crop type, N fertiliser rate), resources (e.g soil water at sowing), and seasonal climate forecast (SOI phase). WhopperCropper has been successfully developed and refined as a discussion-support process for decision makers and their advisers in the northern grains region of Australia. The next phase of the project will build on the current project by extending its application nationally and enhancing the resource management aspects. A commercial partner, with over 800 advisor clients nationally, will participate in the project.