1000 resultados para vazão do sistema
Resumo:
The simulation of SES-Natal Ponta Negra: mitigation of environmental risks and predictive maintenance strategy was developed in the context of several operational irregularities in the pumping stations and sewage systems in the system Ponta Negra. Thus, the environmental risks and complaints against the company due to overflows of sewage into the public thoroughfare became common. This neighborhood has shown in recent years an increase of resident higher than the initial expectation of growth. In this sense presumed the large population growth and generation of sewers higher than expected, associated to the use of corrective maintenance and misuse of the system may be the main causes of operational failures occurring in the SES. This study aimed at analyzing the hydraulic behavior of SES Ponta Negrathrough numerical simulation of its operation associated to future scenarios of occupation. The SES Ponta Negra has a long lengthof collection networks and 6 pumping stations interconnected, being EE 1, 2, 4 coastal way, and beach Shopping interconnected EE3 to receives all sewers pumped from the rest pumping station and pumped to the sewage treatment station of neighborhood which consists of a facultative pond followed by three maturation ponds with disposal of treated effluent into infiltration ditches. Oncethey are connected with each other, the study was conducted considering the days and times of higher inflow for all lifts. Furthermore, with the aim of measuring the gatherer network failures were conducted data survey of on the networks. Thephysical and operational survey data was conducted between January/2011 and janeiro/2012. The simulation of the SES was developed with the aim ofdemonstrating its functioning, eithercurrently and in the coming years, based in population estimates and sewage flow. The collected data represents the current framework of the pumping stations of the SES Ponta Negra and served as input to the model developed in MS Excel ® spreadsheet which allowed simulating the behavior of SES in future scenarios. The results of this study show thatBeach Shopping Pumping Station is actually undersized and presents serious functioning problemsthatmay compromise the environmental quality of surrounding area. The other pumping stations of the system will reach itsmaximum capacity between 2013 and 2015, although the EE1 and EE3 demonstrateoperation capacity, even precariously, until 2017. Moreover, it was observed that the misuse of the network system, due to the input of both garbage and stormwater, are major factors of failures that occur in the SES. Finally, it was found that the corrective maintenance appliance, rather than predictive,has proven to beinefficient because of the serious failuresin the system, causing damage to the environment and health risks to users
Resumo:
Despite the emergence of other forms of artificial lift, sucker rod pumping systems remains hegemonic because of its flexibility of operation and lower investment cost compared to other lifting techniques developed. A successful rod pumping sizing necessarily passes through the supply of estimated flow and the controlled wear of pumping equipment used in the mounted configuration. However, the mediation of these elements is particularly challenging, especially for most designers dealing with this work, which still lack the experience needed to get good projects pumping in time. Even with the existence of various computer applications on the market in order to facilitate this task, they must face a grueling process of trial and error until you get the most appropriate combination of equipment for installation in the well. This thesis proposes the creation of an expert system in the design of sucker rod pumping systems. Its mission is to guide a petroleum engineer in the task of selecting a range of equipment appropriate to the context provided by the characteristics of the oil that will be raised to the surface. Features such as the level of gas separation, presence of corrosive elements, possibility of production of sand and waxing are taken into account in selecting the pumping unit, sucker-rod strings and subsurface pump and their operation mode. It is able to approximate the inferente process in the way of human reasoning, which leads to results closer to those obtained by a specialist. For this, their production rules were based on the theory of fuzzy sets, able to model vague concepts typically present in human reasoning. The calculations of operating parameters of the pumping system are made by the API RP 11L method. Based on information input, the system is able to return to the user a set of pumping configurations that meet a given design flow, but without subjecting the selected equipment to an effort beyond that which can bear
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Alimentos e Nutrição - FCFAR
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Pós-graduação em Geociências e Meio Ambiente - IGCE
Resumo:
Pós-graduação em Agronomia (Irrigação e Drenagem) - FCA