947 resultados para successful building projects


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

After the primary researches on constructability issue which were implemented in United States, United Kingdom and Australia, more explorations were applied on that in order to assess this unique scientific fact in East Asian country of Malaysia. Based on the latest researches done on constructability concept in Malaysia, the most Critical Constructability Activities (CCAs) are defined according to amount of contractors’ participation in each activity and amount of gap between actual and potential effects of each of them on achieving the overall objectives of the construction projects with more cost and time savings and better quality which is the whole aim of a beneficial constructability activity. The present research aims to assess the current findings on CCAs in order to identify the types of contractors and projects which these CCAs are getting performed in and also the types of contracts is used in these CCAs. Finally it was found that there are some significant differences in amount of contractors’ involvement in CCAs among various considered independent variables. This study uses the former researches to help Malaysian construction stakeholders to find out the barriers of constructability implementation in building projects via giving more details on application of CCAs among different IVs.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of this paper is to investigate the relationship-based factors that affect performance of general building projects in China. Eight performance metrics that may be used to measure the success level of construction projects are defined and categorized into two groups namely 'hard' and 'soft' performance. Eight indicators of risks inherent in relationships and seven indicators of tools expected to facilitate relationship building that may affect project success are identified. Data of different projects were collected in China via a self-administered postal survey. By using structural equation modelling techniques, a structural model is developed to help explain the relationship among different variables. It has been found that relational risk has negative influence on project performance. It is recommended that firms in the Chinese construction industry manage the relationship-based factors that are significant in the model so as to achieve project success.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The significance of this research is that it is the first comprehensive analysis of cost performance across Australia. It is well known that measuring cost performance is not an easy task; comparisons of building projects on a `like-for-like’ basis are uncommon, and rarely occur in the real world. However, this paper analyses 120 different structural frame models that represent various; structural designs, construction methods, grid spans, and locations.

The research produced price models that were representative of structural frames used in medium-rise non-residential buildings. It is based on pricing a number of standard building frame designs in five Australian cities. The results represent the cost of producing the same building in different locations, using similar building construction techniques. By utilizing a standard model, project variables like building quality, ground conditions and access were eradicated, thereby facilitating an unbiased comparison of cost performance. I addition, the results are an indicator of building productivity based on costs per square metre of various construction types.

This research provides the Australian industry with robust data about the relative cost performance of various structural building frames. In addition, this research has wider implications because the models may also become useful data for the measuring relative cost performance in other countries.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Because organizations are making large investments in Information systems (IS), efficient IS project management has been found critical to success. This study examines how the use of incentives can improve the project success. Agency theory is used to: identify motivational factors of project success, help the IS owners to understand to what extent management incentives can improve IS development and implementation (ISD/I). The outcomes will help practitioners and researchers to build on theoretical model of project management elements which lead to project success. Given the principal-agent nature of most significant scale of IS development, insights that will allow for greater alignment of the agent’s goals with those of the principal through incentive contracts, will serve to make ISD/I both more efficient and more effective, leading to more successful IS projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The ultimate intent of this dissertation was to broaden and strengthen our understanding of IT implementation by emphasizing research efforts on the dynamic nature of the implementation process. More specifically, efforts were directed toward opening the "black box" and providing the story that explains how and why contextual conditions and implementation tactics interact to produce project outcomes. In pursuit of this objective, the dissertation was aimed at theory building and adopted a case study methodology combining qualitative and quantitative evidence. Precisely, it examined the implementation process, use and consequences of three clinical information systems at Jackson Memorial Hospital, a large tertiary care teaching hospital.^ As a preliminary step toward the development of a more realistic model of system implementation, the study proposes a new set of research propositions reflecting the dynamic nature of the implementation process.^ Findings clearly reveal that successful implementation projects are likely to be those where key actors envision end goals, anticipate challenges ahead, and recognize the presence of and seize opportunities. It was also found that IT implementation is characterized by the systems theory of equifinality, that is, there are likely several equally effective ways to achieve a given end goal. The selection of a particular implementation strategy appears to be a rational process where actions and decisions are largely influenced by the degree to which key actors recognize the mediating role of each tactic and are motivated to action. The nature of the implementation process is also characterized by the concept of "duality of structure," that is, context and actions mutually influence each other. Another key finding suggests that there is no underlying program that regulates the process of change and moves it form one given point toward a subsequent and already prefigured end. For this reason, the implementation process cannot be thought of as a series of activities performed in a sequential manner such as conceived in stage models. Finally, it was found that IT implementation is punctuated by a certain indeterminacy. Results suggest that only when substantial efforts are focused on what to look for and think about, it is less likely that unfavorable and undesirable consequences will occur. ^

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The early stages of the building design process are when the most far reaching decisions are made regarding the configuration of the proposed project. This paper examines methods of providing decision support to building designers across multiple disciplines during the early stage of design. The level of detail supported is at the massing study stage where the basic envelope of the project is being defined. The block outlines on the building envelope are sliced into floors. Within a floor the only spatial divisions supported are the “user” space and the building core. The building core includes vertical transportation systems, emergency egress and vertical duct runs. The current focus of the project described in the paper is multi-storey mixed use office/residential buildings with car parking. This is a common type of building in redevelopment projects within and adjacent to the central business districts of major Australian cities. The key design parameters for system selection across the major systems in multi-storey building projects - architectural, structural, HVAC, vertical transportation, electrical distribution, fire protection, hydraulics and cost – are examined. These have been identified through literature research and discussions with building designers from various disciplines. This information is being encoded in decision support tools. The decision support tools communicate through a shared database to ensure that the relevant information is shared across all of the disciplines. An internal data model has been developed to support the very early design phase and the high level system descriptions required. A mapping to IFC 2x2 has also been defined to ensure that this early information is available at later stages of the design process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This project is the result of a collaborative design process involving QUT School of Design, and AREN Consulting and ZIAD (Zheijiang Provincial Institute of Architectural Design and Research). This project is the submission prepared by the above partnership for an invited international design competition, promoted by Hangzhou City, China. ---------- This major urban design and architecture project is for a large transport oriented development on the new Hangzhou Subway system. The development, covering several city blocks, includes the provision of residential, retail, education, commercial, and transport infrastructure; integrated with rail, bus and ferry systems. ---------- The design strategies are based on the development or artificial land forms; the cutting of new canals, raising of the ground plane, and metaphoric reference to the Yellow Mountains (explored in the detail of the central ‘ridge’ of built form). Further to this, the project explores the integration of sustainable technologies and philosophies with large scale building projects in a subtropical context.