936 resultados para service life cycle management
Resumo:
Purpose: Despite the fundamental role of ecosystem goods and services in sustaining human activities, there is no harmonized and internationally agreed method for including them in life cycle assessment (LCA). The main goal of this study was to develop a globally applicable and spatially resolved method for assessing land-use impacts on the erosion regulation ecosystem service.Methods: Soil erosion depends much on location. Thus, unlike conventional LCA, the endpoint method was regionalized at the grid-cell level (5 arc-minutes, approximately 10×10 km2) to reflect the spatial conditions of the site. Spatially explicit characterization factors were not further aggregated at broader spatial scales. Results and discussion: Life cycle inventory data of topsoil and topsoil organic carbon (SOC) losses were interpreted at the endpoint level in terms of the ultimate damage to soil resources and ecosystem quality. Human health damages were excluded from the assessment. The method was tested on a case study of five three-year agricultural rotations, two of them with energy crops, grown in several locations in Spain. A large variation in soil and SOC losses was recorded in the inventory step, depending on climatic and edaphic conditions. The importance of using a spatially explicit model and characterization factors is shown in the case study.Conclusions and outlook: The regionalized assessment takes into account the differences in soil erosion-related environmental impacts caused by the great variability of soils. Taking this regionalized framework as the starting point, further research should focus on testing the applicability of the method trough the complete life cycle of a product and on determining an appropriate spatial scale at which to aggregate characterization factors, in order to deal with data gaps on location of processes, especially in the background system. Additional research should also focus on improving reliability of the method by quantifying and, insofar as it is possible, reducing uncertainty.
Resumo:
Static process simulation has traditionally been used to model complex processes for various purposes. However, the use of static processsimulators for the preparation of holistic examinations aiming at improving profit-making capability requires a lot of work because the production of results requires the assessment of the applicability of detailed data which may be irrelevant to the objective. The relevant data for the total assessment gets buried byirrelevant data. Furthermore, the models do not include an examination of the maintenance or risk management, and economic examination is often an extra property added to them which can be performed with a spreadsheet program. A process model applicable to holistic economic examinations has been developed in this work. The model is based on the life cycle profit philosophy developed by Hagberg and Henriksson in 1996. The construction of the model has utilized life cycle assessment and life cycle costing methodologies with a view to developing, above all, a model which would be applicable to the economic examinations of complete wholes and which would require the need for information focusing on aspects essential to the objectives. Life cycle assessment and costing differ from each other in terms of the modeling principles, but the features of bothmethodologies can be used in the development of economic process modeling. Methods applicable to the modeling of complex processes can be examined from the viewpoint of life cycle methodologies, because they involve the collection and management of large corpuses of information and the production of information for the needs of decision-makers as well. The results of the study shows that on the basis of the principles of life cycle modeling, a process model can be created which may be used to produce holistic efficiency examinations on the profit-making capability of the production line, with fewer resources thanwith traditional methods. The calculations of the model are based to the maximum extent on the information system of the factory, which means that the accuracyof the results can be improved by developing information systems so that they can provide the best information for this kind of examinations.
Resumo:
Työn tarkoituksena oli kerätä käyttövarmuustietoa savukaasulinjasta kahdelta suomalaiselta sellutehtaalta niiden käyttöönotosta aina tähän päivään asti. Käyttövarmuustieto koostuu luotettavuustiedoista sekä kunnossapitotiedoista. Kerätyn tiedon avulla on mahdollista kuvata tarkasti laitoksen käyttövarmuutta seuraavilla tunnusluvuilla: suunnittelemattomien häiriöiden lukumäärä ja korjausajat, laitteiden seisokkiaika, vikojen todennäköisyys ja korjaavan kunnossapidon kustannukset suhteessa savukaasulinjan korjaavan kunnossapidon kokonaiskustannuksiin. Käyttövarmuustiedon keräysmetodi on esitelty. Savukaasulinjan kriittisten laitteiden määrittelyyn käytetty metodi on yhdistelmä kyselytutkimuksesta ja muunnellusta vian vaikutus- ja kriittisyysanalyysistä. Laitteiden valitsemiskriteerit lopulliseen kriittisyysanalyysiin päätettiin käyttövarmuustietojen sekä kyselytutkimuksen perusteella. Kriittisten laitteiden määrittämisen tarkoitus on löytää savukaasulinjasta ne laitteet, joiden odottamaton vikaantuminen aiheuttaa vakavimmat seuraukset savukaasulinjan luotettavuuteen, tuotantoon, turvallisuuteen, päästöihin ja kustannuksiin. Tiedon avulla rajoitetut kunnossapidon resurssit voidaan suunnata oikein. Kriittisten laitteiden määrittämisen tuloksena todetaan, että kolme kriittisintä laitetta savukaasulinjassa ovat molemmille sellutehtaille yhteisesti: savukaasupuhaltimet, laahakuljettimet sekä ketjukuljettimet. Käyttövarmuustieto osoittaa, että laitteiden luotettavuus on tehdaskohtaista, mutta periaatteessa samat päälinjat voidaan nähdä suunnittelemattomien vikojen todennäköisyyttä esittävissä kuvissa. Kustannukset, jotka esitetään laitteen suunnittelemattomien kunnossapitokustannusten suhteena savukaasulinjan kokonaiskustannuksiin, noudattelevat hyvin pitkälle luotettavuuskäyrää, joka on laskettu laitteen seisokkiajan suhteena käyttötunteihin. Käyttövarmuustiedon keräys yhdistettynä kriittisten laitteiden määrittämiseen mahdollistavat ennakoivan kunnossapidon oikean kohdistamisen ja ajoittamisen laitteiston elinaikana siten, että luotettavuus- ja kustannustehokkuusvaatimukset saavutetaan.
Resumo:
The objective of the thesis was to create a framework that can be used to define a manufacturing strategy taking advantage of the product life cycle method, which enables PQP enhancements. The starting point was to study synkron implementation of cost leadership and differentiation strategies in different stages of the life cycles. It was soon observed that Porter’s strategies were too generic for the complex and dynamic environment where customer needs deviate market and product specifically. Therefore, the strategy formulation process is based on the Terry Hill’s order-winner and qualifier concepts. The manufacturing strategy formulation is initiated with the definition of order-winning and qualifying criteria. From these criteria there can be shaped product specific proposals for action and production site specific key manufacturing tasks that they need to answer in order to meet customers and markets needs. As a future research it is suggested that the process of capturing order-winners and qualifiers should be developed so that the process would be simple and streamlined at Wallac Oy. In addition, defined strategy process should be integrated to the PerkinElmer’s SGS process. SGS (Strategic Goal Setting) is one of the PerkinElmer’s core management processes. Full Text: Null
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.
Resumo:
This study is a qualitative action research by its nature with elements of personal design in the form of a tangible model implementation framework construction. Utilized empirical data has been gathered via two questionnaires in relation to the arranged four workshop events with twelve individual participants. Five of them represented maintenance customers, three maintenance service providers and four equipment providers respectively. Further, there are two main research objectives in proportion to the two complementary focusing areas of this thesis. Firstly, the value-based life-cycle model, which first version has already been developed prior to this thesis, requires updating in order to increase its real-life applicability as an inter-firm decision-making tool in industrial maintenance. This first research objective is fulfilled by improving appearance, intelligibility and usability of the above-mentioned model. In addition, certain new features are also added. The workshop participants from the collaborating companies were reasonably pleased with made changes, although further attention will be required in future on the model’s intelligibility in particular as main results, charts and values were all reckoned as slightly hard to understand. Moreover, upgraded model’s appearance and added new features satisfied them the most. Secondly and more importantly, the premises of the model’s possible inter-firm implementation process need to be considered. This second research objective is delivered in two consecutive steps. At first, a bipartite open-books supported implementation framework is created and its different characteristics discussed in theory. Afterwards, the prerequisites and the pitfalls of increasing inter-organizational information transparency are studied in empirical context. One of the main findings was that the organizations are not yet prepared for network-wide information disclosure as dyadic collaboration was favored instead. However, they would be willing to share information bilaterally at least. Another major result was that the present state of companies’ cost accounting systems will definitely need implementation-wise enhancing in future since accurate and sufficiently detailed maintenance data is not available. Further, it will also be crucial to create supporting and mutually agreed network infrastructure. There are hardly any collaborative models, methods or tools currently in usage. Lastly, the essential questions about mutual trust and predominant purchasing strategies are cooperation-wise important. If inter-organizational activities are expanded, a more relational approach should be favored in this regard. Mutual trust was also recognized as a significant cooperation factor, but it is hard to measure in reality.
Resumo:
The goal of the thesis was to investigate how much after-sales profits a crane sale generates over the life cycle of the crane and the effects of these after-sales profits on the overall profitability of the crane. The thesis utilizes theories about life cycle costing from an equipment and service supplier’s point of view. However, instead of costs, the thesis is focused on the life cycle after-sales profits from maintenance services and spare parts provided for the sold crane. The case study approach was chosen and a total of five cranes from three different segments were investigated. An eight-step life cycle profit calculation model was developed in order to analyze the chosen cases’ life cycle profits systematically. The results of the investigation suggest that the life cycle after-sales profits are significant in value. In the case analyses they accounted for between 20% and 44% of the overall life cycle profits of the case cranes. The after-sales profits should be taken into account already in the pricing when offering a crane to a customer.
Resumo:
The importance of industrial maintenance has been emphasized during the last decades; it is no longer a mere cost item, but one of the mainstays of business. Market conditions have worsened lately, investments in production assets have decreased, and at the same time competition has changed from taking place between companies to competition between networks. Companies have focused on their core functions and outsourced support services, like maintenance, above all to decrease costs. This new phenomenon has led to increasing formation of business networks. As a result, a growing need for new kinds of tools for managing these networks effectively has arisen. Maintenance costs are usually a notable part of the life-cycle costs of an item, and it is important to be able to plan the future maintenance operations for the strategic period of the company or for the whole life-cycle period of the item. This thesis introduces an itemlevel life-cycle model (LCM) for industrial maintenance networks. The term item is used as a common definition for a part, a component, a piece of equipment etc. The constructed LCM is a working tool for a maintenance network (consisting of customer companies that buy maintenance services and various supplier companies). Each network member is able to input their own cost and profit data related to the maintenance services of one item. As a result, the model calculates the net present values of maintenance costs and profits and presents them from the points of view of all the network members. The thesis indicates that previous LCMs for calculating maintenance costs have often been very case-specific, suitable only for the item in question, and they have also been constructed for the needs of a single company, without the network perspective. The developed LCM is a proper tool for the decision making of maintenance services in the network environment; it enables analysing the past and making scenarios for the future, and offers choices between alternative maintenance operations. The LCM is also suitable for small companies in building active networks to offer outsourcing services for large companies. The research introduces also a five-step constructing process for designing a life-cycle costing model in the network environment. This five-step designing process defines model components and structure throughout the iteration and exploitation of user feedback. The same method can be followed to develop other models. The thesis contributes to the literature of value and value elements of maintenance services. It examines the value of maintenance services from the perspective of different maintenance network members and presents established value element lists for the customer and the service provider. These value element lists enable making value visible in the maintenance operations of a networked business. The LCM added with value thinking promotes the notion of maintenance from a “cost maker” towards a “value creator”.
Resumo:
This paper examines the life cycle GHG emissions from existing UK pulverized coal power plants. The life cycle of the electricity Generation plant includes construction, operation and decommissioning. The operation phase is extended to upstream and downstream processes. Upstream processes include the mining and transport of coal including methane leakage and the production and transport of limestone and ammonia, which are necessary for flue gas clean up. Downstream processes, on the other hand, include waste disposal and the recovery of land used for surface mining. The methodology used is material based process analysis that allows calculation of the total emissions for each process involved. A simple model for predicting the energy and material requirements of the power plant is developed. Preliminary calculations reveal that for a typical UK coal fired plant, the life cycle emissions amount to 990 g CO2-e/kWh of electricity generated, which compares well with previous UK studies. The majority of these emissions result from direct fuel combustion (882 g/kWh 89%) with methane leakage from mining operations accounting for 60% of indirect emissions. In total, mining operations (including methane leakage) account for 67.4% of indirect emissions, while limestone and other material production and transport account for 31.5%. The methodology developed is also applied to a typical IGCC power plant. It is found that IGCC life cycle emissions are 15% less than those from PC power plants. Furthermore, upon investigating the influence of power plant parameters on life cycle emissions, it is determined that, while the effect of changing the load factor is negligible, increasing efficiency from 35% to 38% can reduce emissions by 7.6%. The current study is funded by the UK National Environment Research Council (NERC) and is undertaken as part of the UK Carbon Capture and Storage Consortium (UKCCSC). Future work will investigate the life cycle emissions from other power generation technologies with and without carbon capture and storage. The current paper reveals that it might be possible that, when CCS is employed. the emissions during generation decrease to a level where the emissions from upstream processes (i.e. coal production and transport) become dominant, and so, the life cycle efficiency of the CCS system can be significantly reduced. The location of coal, coal composition and mining method are important in determining the overall impacts. In addition to studying the net emissions from CCS systems, future work will also investigate the feasibility and technoeconomics of these systems as a means of carbon abatement.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.
Resumo:
There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.
Resumo:
Forests are a store of carbon and an eco-system that continually removes carbon dioxide from the atmosphere. If they are sustainably managed, the carbon store can be maintained at a constant level, while the trees removed and converted to timber products can form an additional long term carbon store. The total carbon store in the forest and associated ‘wood chain’ therefore increases over time, given appropriate management. This increasing carbon store can be further enhanced with afforestation. The UK’s forest area has increased continually since the early 1900s, although the rate of increase has declined since its peak in the late 1980s, and it is a similar picture in the rest of Europe. The increased sustainable use of timber in construction is a key market incentive for afforestation, which can make a significant contribution to reducing carbon emissions. The case study presented in this paper demonstrates the carbon benefits of a Cross Laminated Timber (CLT) solution for a multi-storey residential building in comparison with a more conventional reinforced concrete solution. The embodied carbon of the building up to completion of construction is considered, together with the stored carbon during the life of the building and the impact of different end of life scenarios. The results of the study show that the total stored carbon in the CLT structural frame is 1215tCO2 (30tCO2 per housing unit). The choice of treatment at end of life has a significant effect on the whole life embodied carbon of the CLT frame, which ranges from -1017 tCO2e for re-use to +153tCO2e for incinerate without energy recovery. All end of life scenarios considered result in lower total CO2e emissions for the CLT frame building compared with the reinforced concrete frame solution.
Resumo:
The foraging activity of Geotrigona mombuca Smith, 1863 was studied under natural conditions aiming to verify the influence of seasonal changes on daily flight activity and annual cycle of the colony. Daily flight activity was monitored for a year based on the observation and counting of foragers leaving and entering the hive, as well as the kind of material transported and meteorological factors such as day time, temperature and relative humidity. The influence of seasonal changes was evidenced by alterations on daily rhythm of flight activity and by differences on transportation of food resources, building material and garbage. These data indicate that forager behavior is related to daily microclimate conditions and it is synchronized with the requirements of colony annual cycle, which determines an intense pollen collection in the summer. Thus, the recomposition of the intranidal population in spring and summer can be ensured, which is characterized both for a higher intensity of flight activity and increase in garbage and resin transport, as well as the swarming process in the spring. In this way, an action targeting the preservation or management of the species in a natural environment should consider that survival and reproduction of the colony depends greatly on the amount of available pollen in late winter.
Resumo:
Waste management is becoming, year after year, always more important both for the costs associated with it and for the ever increasing volumes of waste generated. The discussion on the fate of organic fraction of municipal solid waste (OFMSW) leads everyday to new solutions. Many alternatives are proposed, ranging from incineration to composting passing through anaerobic digestion. “For Biogas” is a collaborative effort, between C.I.R.S.A. and R.E.S. cooperative, whose main goal is to generate “green” energy from both biowaste and sludge anaerobic co-digestion. Specifically, the project include a pilot plant receiving dewatered sludge from both urban and agro-industrial sewage (DS) and the organic fraction of MSW (in 2/1 ratio) which is digested in absence of oxygen to produce biogas and digestate. Biogas is piped to a co-generation system producing power and heat reused in the digestion process itself, making it independent from the national grid. Digestate undergoes a process of mechanical separation giving a liquid fraction, introduced in the treatment plant, and a solid fraction disposed in landfill (in future it will be further processed to obtain compost). This work analyzed and estimated the impacts generated by the pilot plant in its operative phase. Once the model was been characterized, on the basis of the CML2001 methodology, a comparison is made with the present scenario assumed for OFMSW and DS. Actual scenario treats separately the two fractions: the organic one is sent to a composting plant, while sludge is sent to landfill. Results show that the most significant difference between the two scenarios is in the GWP category as the project "For Biogas" is able to generate “zero emission” power and heat. It also generates a smaller volume of waste for disposal. In conclusion, the analysis evaluated the performance of two alternative methods of management of OFMSW and DS, highlighting that "For Biogas" project is to be preferred to the actual scenario.