998 resultados para remuneration report
Resumo:
This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
The BRITE Project undertook six innovation case studies of building and construction projects in 2005. The purpose of the program was to demonstrate the benefits of innovation and highlight the nature of successful implementation strategies. The cases were selected following a public call in industry magazines across Australia, which resulted in approximately 50 nominations. The six selected case studies resulted in three prominent contributions to knowledge
Resumo:
Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate ― Now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
There can be many interpretations of relationship management. In this short report, we are concerned with relationships arising under an alliance project and in managing stakeholders under a more traditional approach to procurement. Each aspect is supported by an example project.
Resumo:
This research project aims to improve economic, social and environmental sustainability of the pre-cast concrete and construction and demolition waste supply chains through the development, trial and evaluation of an innovative supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic, social and environmental sustainable markets.
Resumo:
In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.
Resumo:
This report is for one of the four Tasks of the CRC project ‘Regenerating Construction to Enhance Sustainability’. The report specifically addresses Task 2 ‘Design guidelines for delivering high quality indoor environments’.
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
This report presents the results of a study on indoor environment quality (IEQ) and occupant productivity in two buildings that are owned and Occupied by City of Melbourne, and located next to each other in Central Melbourne, Council House 1 (CH1) and Council House 2 (CH2). The impact of a range of relevant IEQ and other parameters on health, wellbeing and productivity of occupants is assessed. The before-and-after case study has demonstrated that the productivity of office building occupants can potentially be enhanced through good building design, and provision of a high quality, healthy, comfortable and functional interior environment, that takes account of basic occupant needs. It has shown that good indoor environment quality is a necessary pre-requisite for enhanced productivity in office buildings, but that broader aspects of overall building and interior design are also important.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.