980 resultados para quantity surveying


Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Martin Skitmore introduces a most "remarkable couple", Rod and Annie Stewart of Huntsville, Alabama (and elsewhere), and their post retirement business, Mobile Data Services. Contrary to popular expectations, Rod and Annie are not only computer-friendly, but are almost entirely dependent on the new technology for their survival.

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A fundamental proposition is that the accuracy of the designer's tender price forecasts is positively correlated with the amount of information available for that project. The paper describes an empirical study of the effects of the quantity of information available on practicing Quantity Surveyors' forecasting accuracy. The methodology involved the surveyors repeatedly revising tender price forecasts on receipt of chunks of project information. Each of twelve surveyors undertook two projects and selected information chunks from a total of sixteen information types. The analysis indicated marked differences in accuracy between different project types and experts/non-experts. The expert surveyors' forecasts were not found to be significantly improved by information other than that of basic building type and size, even after eliminating project type effects. The expert surveyors' forecasts based on the knowledge of building type and size alone were, however, found to be of similar accuracy to that of average practitioners pricing full bills of quantities.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a unified view of the relationship between (1) quantity and (2) price generating mechanisms in estimating individual prime construction costs/prices. A brief review of quantity generating techniques is provided with particular emphasis on experientially based assumptive approaches and this is compared with the level of pricing data available for the quantities generated in terms of reliability of the ensuing prime cost estimates. It is argued that there is a tradeoff between the reliability of quantity items and reliability of rates. Thus it is shown that the level of quantity generation is optimised by maximising the joint reliability function of the quantity items and their associated rates. Some thoughts on how this joint reliability function can be evaluated and quantified follow. The application of these ideas is described within the overall strategy of the estimator's decision - "Which estimating technique shall I use for a given level of contract information? - and a case is made for the computer generation of estimates by several methods, with an indication of the reliability of each estimate, the ultimate choice of estimate being left to the estimator concerned. Finally, the potential for the development of automatic estimating systems within this framework is examined.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction industry contains two types of estimators the contractors' estimator and the designers' price forecaster. Each has two models of the building in which to systemize his procedures - the production model and the design model. The use of these models is discussed in the light of the industry's particular problems of complexity and uncertainty together with the pressures of the market. It is argued that estimators and forecasters, in order to function effectively in these conditions, are forced to exercise a high degree of subjective judgment. Means of eliciting good heuristics involved in judgment making are considered by reference to the artificial intelligence and construction literature and a methodology is proposed based on these findings. The results of two early trials of the method with students are given, indicating the usefulness of the approach.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes an analysis of construction project bids to determine (a) the global distribution and (b) factors influencing the distribution of bids. The global distribution of bids was found, by using a battery of ll test statistics, to be approximated by a three-parameter log normal distribution. No global spread parameter was found. A multivariate analysis revealed the year of tender to be the major influencing factor. Consideration of the construction order, tender price and output indices lead to the conclusion that distributional spread reflected the degree of difference in pricing policies between bidders and the skewness of the distributions reflected the degree of competition. The paper concludes with a tentative model of the causal relationships between the factors and distributional characteristics involved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Emerging sciences, such as conceptual cost estimating, seem to have to go through two phases. The first phase involves reducing the field of study down to its basic ingredients - from systems development to technological development (techniques) to theoretical development. The second phase operates in the direction in building up techniques from theories, and systems from techniques. Cost estimating is clearly and distinctly still in the first phase. A great deal of effort has been put into the development of both manual and computer based cost estimating systems during this first phase and, to a lesser extent, the development of a range of techniques that can be used (see, for instance, Ashworth & Skitmore, 1986). Theoretical developments have not, as yet, been forthcoming. All theories need the support of some observational data and cost estimating is not likely to be an exception. These data do not need to be complete in order to build theories. As it is possible to construct an image of a prehistoric animal such as the brontosaurus from only a few key bones and relics, so a theory of cost estimating may possibly be found on a few factual details. The eternal argument of empiricists and deductionists is that, as theories need factual support, so do we need theories in order to know what facts to collect. In cost estimating, the basic facts of interest concern accuracy, the cost of achieving this accuracy, and the trade off between the two. When cost estimating theories do begin to emerge, it is highly likely that these relationships will be central features. This paper presents some of the facts we have been able to acquire regarding one part of this relationship - accuracy, and its influencing factors. Although some of these factors, such as the amount of information used in preparing the estimate, will have cost consequences, we have not yet reached the stage of quantifying these costs. Indeed, as will be seen, many of the factors do not involve any substantial cost considerations. The absence of any theory is reflected in the arbitrary manner in which the factors are presented. Rather, the emphasis here is on the consideration of purely empirical data concerning estimating accuracy. The essence of good empirical research is to .minimize the role of the researcher in interpreting the results of the study. Whilst space does not allow a full treatment of the material in this manner, the principle has been adopted as closely as possible to present results in an uncleaned and unbiased way. In most cases the evidence speaks for itself. The first part of the paper reviews most of the empirical evidence that we have located to date. Knowledge of any work done, but omitted here would be most welcome. The second part of the paper presents an analysis of some recently acquired data pertaining to this growing subject.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Several methods of estimating the costs or price of construction projects are now available for use in the construction industry. It is difficult due to the conservative approach of estimators and quantity surveyors, and the fact that the industry is undergoing one of its deepest recessions this century, to implement any changes in these processes. Several methods have been tried and tested and probably discarded forever, whereas other methods are still in their infancy. There is also a movement towards greater use of the computer, whichever method seems to be adopted. An important consideration with any method of estimating is the accuracy by which costs can be calculated. Any improvement in this consideration will be welcomed by a11 parties, because existing methods are poor when measured by this criteria. Estimating, particularly by contractors, has always carried some mystic, and many of the processes discussed both in the classroom and in practice are little more than fallacy when properly investigated. What makes an estimator or quantity surveyor good at forecasting the right price? To what extent does human behaviour influence or have a part to play? These and some of the other aspects of effective estimating are now examined in more detail.