909 resultados para performance monitoring
Resumo:
Realization of cloud computing has been possible due to availability of virtualization technologies on commodity platforms. Measuring resource usage on the virtualized servers is difficult because of the fact that the performance counters used for resource accounting are not virtualized. Hence, many of the prevalent virtualization technologies like Xen, VMware, KVM etc., use host specific CPU usage monitoring, which is coarse grained. In this paper, we present a performance monitoring tool for KVM based virtualized machines, which measures the CPU overhead incurred by the hypervisor on behalf of the virtual machine along-with the CPU usage of virtual machine itself. This fine-grained resource usage information, provided by the above tool, can be used for diverse situations like resource provisioning to support performance associated QoS requirements, identification of bottlenecks during VM placements, resource profiling of applications in cloud environments, etc. We demonstrate a use case of this tool by measuring the performance of web-servers hosted on a KVM based virtualized server.
Resumo:
This paper details the monitoring and repair of an impact damaged prestressed concrete bridge. The repair was required following an impact from a low-loader carrying an excavator while passing underneath the bridge. The repair was carried out by preloading the bridge in the vicinity of the damage to relieve some prestressing. This preload was removed following the hardening and considerable strength gain of the repair material. The true behaviour of damaged prestressed concrete bridges during repair is difficult to estimate theoretically due to lack of benchmarking and inadequacy of assumed damage models. A network of strain gauges at locations of interest was thus installed during the entire period of repair. Effects of various activities were qualitatively and quantitatively observed. The interaction and rapid, model-free calibration of damaged and undamaged beams, including identification of damaged gauges were also probed. This full scale experiment is expected to be of interest and benefit to the practising engineer and the researcher alike.
Resumo:
Optical networks are under constant evolution. The growing demand for dynamism require devices that can accommodate different types of traffic. Thus the study of transparent optical networks arises. This approach makes optical networks more "elegant" , due to a more efficient use of network resources. In this thesis, the author proposes devices that intend to form alternative approaches both in the state of art of these same technologies both in the fitting of this technologies in transparent optical networks. Given that full transparency is difficult to achieve with current technology (perhaps with more developed optical computing this is possible), the author proposes techniques with different levels of transparency. On the topic of performance of optical networks, the author proposes two techniques for monitoring chromatic dispersion with different levels of transparency. In Chapter 3 the proposed technique seems to make more sense for long-haul optical transmission links and high transmission rates, not only due to its moderate complexity but also to its potential moderate/high cost. However it is proposed to several modulation formats, particularly those that have a protruding clock component. In Chapter 4 the transparency level was not tested for various modulation formats, however some transparency is achieved by not adding any electrical device after the receiver (other than an analog-digital converter). This allows that this technique can operate at high transmission rates in excess of 100 Gbit / s, if electro-optical asynchronous sampling is used before the optical receiver. Thus a low cost and low bandwidth photo-detector can be used. In chapter 5 is demonstrated a technique for simultaneously monitoring multiple impairments of the optical network by generating novel performance analysis diagrams and by use of artificial neural networks. In chapter 6 the author demonstrates an all-optical technique for controlling the optical state of polarization and an example of how all-optical signal processing can fully cooperate with optical performance monitoring.
Resumo:
This paper presents the results of performance monitoring under real winter weather conditions, controlled laboratory testing and computational fluid dynamics (CFD) analysis of a wall mounted ventilation air inlet heat convector. For real winter weather monitoring, the wall-mounted convector was installed in a laboratory room of the Engineering Building of the School of Construction Management and Engineering. Air and hot water temperatures and air speeds were measured at the entrance to the convector and in the room. The hot water temperature was controlled at 40, 60 and 80 °C. The monitoring results were later used as boundary conditions for a CFD simulation to investigate the air movement in the room. Controlled laboratory testing was conducted in laboratories at the University of Reading, UK and at Wetterstad Consultancy, Sweden. The results of the performance investigation showed that the system contributed greatly to the room heating, particularly at a water temperature of 80 °C. Also adequate fresh air was supplied to the room. Such a system is able to provide an energy efficient method of eliminating problems associated with cold winter draughts.
Resumo:
We experimentally revisit a technique of low-cost multiparameter monitor for optical performance monitoring based on low frequency polarization modulation. A simplified calibration procedure, which significantly reduces the mathematical complexity and processing effort is proposed. Validation is achieved by carrying out relative optical power, wavelength, and differential group delay measurements. (C) 2012 Wiley Periodicals, Inc. Microwave Opt Technol Lett 54:18201824, 2012; View this article online at wileyonlinelibrary.com. DOI 10.1002/mop.26956
Resumo:
Addressing inconsistencies in relational demography research, we examine the relationship between cultural dissimilarity and individual performance through the lens of social self-regulation theory, which extends the social identity perspective in relational demography with the analysis of social self-regulation. We propose that social self-regulation in culturally diverse teams manifests itself as performance monitoring (i.e., individuals' actions to meet team performance standards and peer expectations). Contingent on the status associated with individuals' cultural background, performance monitoring is proposed to have a curvilinear relationship with individual performance and to mediate between cultural dissimilarity and performance. Multilevel moderated mediation analyses of time-lagged data from 316 members of 69 teams confirmed these hypotheses. Cultural dissimilarity had a negative relationship with performance monitoring for high cultural-status members, and a positive relationship for low cultural-status members. Performance monitoring had a curvilinear relationship with individual performance that became decreasingly positive. Cultural dissimilarity thus was increasingly negatively associated with performance for high culturalstatus members, and decreasingly positively for low cultural-status members. These findings suggest that cultural dissimilarity to the team is not unconditionally negative for the individual but, in moderation, may in fact have positive motivational effects.
Resumo:
Governmental accountability is the requirement of government entities to be accountable to the citizenry in order to justify the raising and expenditure of public resources. The concept of service efforts and accomplishments measurement for government programs was introduced by the Governmental Accounting Standards Board (GASB) in Service Efforts and Accomplishments Reporting: Its Time Has Come (1990). This research tested the feasibility of implementing the concept for the Federal-aid highway construction program and identified factors affecting implementation with a case study of the District of Columbia. Changes in condition and performance ratings for specific highway segments in 15 projects, before and after construction expenditures, were evaluated using data provided by the Federal Highway Administration. The results of the evaluation indicated difficulty in drawing conclusions on the state program performance, as a whole. The state program reflects problems within the Federally administered program that severely limit implementation of outcome-oriented performance measurement. Major problems identified with data acquisition are: data reliability, availability, compatibility and consistency among states. Other significant factors affecting implementation are institutional barriers and political barriers. Institutional issues in the Federal Highway Administration include the lack of integration of the fiscal project specific database with the Highway Performance Monitoring System database. The Federal Highway Administration has the ability to resolve both of the data problems, however interviews with key Federal informants indicate this will not occur without external directives and changes to the Federal “stewardship” approach to program administration. ^ The findings indicate many issues must be resolved for successful implementation of outcome-oriented performance measures in the Federal-aid construction program. The issues are organizational and political in nature, however in the current environment resolution is possible. Additional research is desirable and would be useful in overcoming the obstacles to successful implementation. ^
Resumo:
During the past two decades, many researchers have developed methods for the detection of structural defects at the early stages to operate the aerospace vehicles safely and to reduce the operating costs. The Surface Response to Excitation (SuRE) method is one of these approaches developed at FIU to reduce the cost and size of the equipment. The SuRE method excites the surface at a series of frequencies and monitors the propagation characteristics of the generated waves. The amplitude of the waves reaching to any point on the surface varies with frequency; however, it remains consistent as long as the integrity and strain distribution on the part is consistent. These spectral characteristics change when cracks develop or the strain distribution changes. The SHM methods may be used for many applications, from the detection of loose screws to the monitoring of manufacturing operations. A scanning laser vibrometer was used in this study to investigate the characteristics of the spectral changes at different points on the parts. The study started with detecting a load on a plate and estimating its location. The modifications on the part with manufacturing operations were detected and the Part-Based Manufacturing Process Performance Monitoring (PbPPM) method was developed. Hardware was prepared to demonstrate the feasibility of the proposed methods in real time. Using low-cost piezoelectric elements and the non-contact scanning laser vibrometer successfully, the data was collected for the SuRE and PbPPM methods. Locational force, loose bolts and material loss could be easily detected by comparing the spectral characteristics of the arriving waves. On-line methods used fast computational methods for estimating the spectrum and detecting the changing operational conditions from sum of the squares of the variations. Neural networks classified the spectrums when the desktop – DSP combination was used. The results demonstrated the feasibility of the SuRE and PbPPM methods.
Resumo:
During the past two decades, many researchers have developed methods for the detection of structural defects at the early stages to operate the aerospace vehicles safely and to reduce the operating costs. The Surface Response to Excitation (SuRE) method is one of these approaches developed at FIU to reduce the cost and size of the equipment. The SuRE method excites the surface at a series of frequencies and monitors the propagation characteristics of the generated waves. The amplitude of the waves reaching to any point on the surface varies with frequency; however, it remains consistent as long as the integrity and strain distribution on the part is consistent. These spectral characteristics change when cracks develop or the strain distribution changes. The SHM methods may be used for many applications, from the detection of loose screws to the monitoring of manufacturing operations. A scanning laser vibrometer was used in this study to investigate the characteristics of the spectral changes at different points on the parts. The study started with detecting a load on a plate and estimating its location. The modifications on the part with manufacturing operations were detected and the Part-Based Manufacturing Process Performance Monitoring (PbPPM) method was developed. Hardware was prepared to demonstrate the feasibility of the proposed methods in real time. Using low-cost piezoelectric elements and the non-contact scanning laser vibrometer successfully, the data was collected for the SuRE and PbPPM methods. Locational force, loose bolts and material loss could be easily detected by comparing the spectral characteristics of the arriving waves. On-line methods used fast computational methods for estimating the spectrum and detecting the changing operational conditions from sum of the squares of the variations. Neural networks classified the spectrums when the desktop – DSP combination was used. The results demonstrated the feasibility of the SuRE and PbPPM methods.
Resumo:
Approximately half of the houses in Northern Ireland were built before any form of minimum thermal specification or energy efficiency standard was enforced. Furthermore, 44% of households are categorised as being in fuel poverty; spending more than 10% of the household income to heat the house to bring it to an acceptable level of thermal comfort. To bring existing housing stock up to an acceptable standard, retrofitting for improving the energy efficiency is essential and it is also necessary to study the effectiveness of such improvements in future climate scenarios. This paper presents the results from a year-long performance monitoring of two houses that have undergone retrofits to improve energy efficiency. Using wireless sensor technology internal temperature, humidity, external weather, household gas and electricity usage were monitored for a year. Simulations using IES-VE dynamic building modelling software were calibrated using the monitoring data to ASHARE Guideline 14 standards. The energy performance and the internal environment of the houses were then assessed for current and future climate scenarios and the results show that there is a need for a holistic balanced strategy for retrofitting.
Resumo:
Energy efficient policies are being applied to network protocols, devices and classical network management systems. Researchers have already studied in depth each of those fields, including for instance a long monitoring processes of various number of individual ICT equipment from where power models are constructed. With the development of smart meters and emerging protocols such as SNMP and NETCONF, currently there is an open field to couple the power models, translated to the expected behavior, with the realtime energy measurements. The goal is to derive a comparison on the power data between both of the processes in the direction of detection for possible deviations on the expected results. The logical assumption is that a fault in the usage of a particular device will not only increase its own energy usage, but also may cause additional consumption on the other devices part of the network. A platform is developed to monitor and analyze the retrieved power data of a simulated enterprise ICT infrastructure. Moreover, smart algorithms are developed which are aware of the different states that are occurring on each device during their typical use phase, as well as to detect and isolate possible anomalies. The produced results are obtained and validated with the use of Cisco switches and routers, Dell Precision stations and Raritan PDU as part of the monitored infrastructure.
Resumo:
Controlling differential axial shortening in vertical load bearing concrete elements is a major concern for new generation tall buildings with complex geometries and mechanisms. Quantification of axial shortening using gauges to verify the pre-estimated numerical values used at the design stage is a well established method. This method makes adequate provision to mitigate the adverse effects during the construction. However, this method is becoming increasingly unusable due to its drawbacks. This highlights the need a novel method to quantify the axial shortening using ambient measurements. This paper will first brief introduce the method and then illustrate its application to a high-rise building with two outrigger and belt systems. Moreover, this procedure can be used as a health or performance monitoring tool of the building structure, both during and after construction.
Resumo:
Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.
Resumo:
Lateral displacement and global stability are the two main stability criteria for soil nail walls. Conventional design methods do not adequately address the deformation behaviour of soil nail walls, owing to the complexity involved in handling a large number of influencing factors. Consequently, limited methods of deformation estimates based on empirical relationships and in situ performance monitoring are available in the literature. It is therefore desirable that numerical techniques and statistical methods are used in order to gain a better insight into the deformation behaviour of soil nail walls. In the present study numerical experiments are conducted using a 2 4 factorial design method. Based on analysis of the maximum lateral deformation and factor-of-safety observations from the numerical experiments, regression models for maximum lateral deformation and factor-of-safety prediction are developed and checked for adequacy. Selection of suitable design factors for the 2 4 factorial design of numerical experiments enabled the use of the proposed regression models over a practical range of soil nail wall heights and in situ soil variability. It is evident from the model adequacy analyses and illustrative example that the proposed regression models provided a reasonably good estimate of the lateral deformation and global factor of safety of the soil nail walls.
Resumo:
We study wireless multihop energy harvesting sensor networks employed for random field estimation. The sensors sense the random field and generate data that is to be sent to a fusion node for estimation. Each sensor has an energy harvesting source and can operate in two modes: Wake and Sleep. We consider the problem of obtaining jointly optimal power control, routing and scheduling policies that ensure a fair utilization of network resources. This problem has a high computational complexity. Therefore, we develop a computationally efficient suboptimal approach to obtain good solutions to this problem. We study the optimal solution and performance of the suboptimal approach through some numerical examples.