999 resultados para management of crises


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Report, prepared for Smart Service Queensland (“SSQ”), addresses legal issues, areas of risk and other factors associated with activities conducted on three popular online platforms—YouTube, MySpace and Second Life (which are referred to throughout this Report as the “Platforms”). The Platforms exemplify online participatory spaces and behaviours, including blogging and networking, multimedia sharing, and immersive virtual environments.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chemical and physical restraints are frequently used in the intensive care unit (ICU) to control agitated patients and to prevent self-harm and unplanned extubations. Published work relating to the numerous issues of the care and treatment strategies for these patients remains conflicting and unclear. Literature regarding sedation and chemical restraint reveals a trend towards management with lighter sedation, use of sedation assessment tools and sedation protocols. It remains unclear which treatment is best for agitated and delirious patients, and the evidence on the effect of sedation is conflicting. A large portion of the literature on the use of physical restraint is from general hospital wards and residential homes, and not from the ICU environment. The purpose of this paper is to provide a summary of the existing literature on the use of physical and chemical restraints in the ICU setting. In Part 1 of this two-part paper, the evidence on chemical and physical restraints is explored with specific focus on definition of terms, unplanned

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An important goal of the care for the mechanically ventilated patient is to minimize patient discomfort and anxiety. This is partly achieved by frequent use of chemical and physical restraints. The majority of patients in intensive care will receive some form of sedation. The goal and use of sedation has changed considerably over the past few decades with literature evidencing trends toward overall lighter sedation levels and daily interruption of sedation. Conversely, the use of physical restraint for the ventilated patient in ICU differs considerably between nations and continents. A large portion of the literature on the use of physical restraint is from general hospital wards and residential homes, and not from the ICU environment. Recent literature suggests minimal use of physical restraint in the ICU, and that reduction programmes have been initiated. However, very few papers illuminate the patient's experience of physical and chemical restraints as a treatment strategy. In Part 1 of this two-part review, the evidence on chemical and physical restraints was explored with specific focus on definitions of terms, unplanned extubation, agitation, delirium as well as the impact of nurse–patient ratios in the ICU on these issues. This paper, Part 2, examines the evidence related to chemical and physical restraints from the mechanically ventilated patient's perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Throughout the developed world there is an increasing prevalence of childhood obesity. Because of this increase, and awareness of the risks to long term health that childhood obesity presents, the phenomena is now described by many as a global epidemic. Children, Obesity and Exercise provides sport, exercise and medicine students and professionals with an accessible and practical guide to understanding and managing childhood and adolescent obesity. It covers: overweight, obesity and body composition; physical activity, growth and development; psycho-social aspects of childhood obesity; physical activity behaviours; eating behaviours; measuring childrens behaviour; interventions for prevention and management of childhood obesity. Children, Obesity and Exercise addresses the need for authoritative advice and innovative approaches to the prevention and management of this chronic problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract Providing water infrastructure in times of accelerating climate change presents interesting new problems. Expanding demands must be met or managed in contexts of increasingly constrained sources of supply, raising ethical questions of equity and participation. Loss of agricultural land and natural habitats, the coastal impacts of desalination plants and concerns over re-use of waste water must be weighed with demand management issues of water rationing, pricing mechanisms and inducing behaviour change. This case study examines how these factors impact on infrastructure planning in South East Queensland, Australia: a region with one of the developed world’s most rapidly growing populations, which has recently experienced the most severe drought in its recorded history. Proposals to match forecast demands and potential supplies for water over a 20 year period are reviewed by applying ethical principles to evaluate practical plans to meet the water needs of the region’s activities and settlements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multi-disciplinary approaches to complex problems are becoming more common – they enable criteria manifested in distinct (and potentially conflicting) domains to be jointly balanced and satisfied. In this paper we present airport terminals as a case study which requires multi-disciplinary knowledge in order to balance conflicting security, economic and passenger-driven needs and correspondingly enhance the design, management and operation of airport terminals. The need for a truly multi-disciplinary scientific approach which integrates information, process, people, technology and space domains is highlighted through a brief discussion of two challenges currently faced by airport operators. The paper outlines the approach taken by this project, detailing the aims and objectives of each of seven diverse research programs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.