870 resultados para environmental impact assessment and study
Resumo:
Includes bibliography
Resumo:
Cover title.
Resumo:
Issued May 1978.
Resumo:
Cover title: Land and resource management plan, overview, Toiyabe National Forest.
Resumo:
"FHWA-IL-EIS-93-03-D/4(F)"
Resumo:
"FHWA-IL-EIS-93-03-FS/4(f)."
Resumo:
Mode of access: Internet.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT
Resumo:
Libro de apoyo a la docencia - 166 p.
Resumo:
Developing an effective impact evaluation framework, managing and conducting rigorous impact evaluations, and developing a strong research and evaluation culture within development communication organisations presents many challenges. This is especially so when both the community and organisational context is continually changing and the outcomes of programs are complex and difficult to clearly identify.----- This paper presents a case study from a research project being conducted from 2007-2010 that aims to address these challenges and issues, entitled Assessing Communication for Social Change: A New Agenda in Impact Assessment. Building on previous development communication projects which used ethnographic action research, this project is developing, trailing and rigorously evaluating a participatory impact assessment methodology for assessing the social change impacts of community radio programs in Nepal. This project is a collaboration between Equal Access – Nepal (EAN), Equal Access – International, local stakeholders and listeners, a network of trained community researchers, and a research team from two Australian universities. A key element of the project is the establishment of an organisational culture within EAN that values and supports the impact assessment process being developed, which is based on continuous action learning and improvement. The paper describes the situation related to monitoring and evaluation (M&E) and impact assessment before the project began, in which EAN was often reliant on time-bound studies and ‘success stories’ derived from listener letters and feedback. We then outline the various strategies used in an effort to develop stronger and more effective impact assessment and M&E systems, and the gradual changes that have occurred to date. These changes include a greater understanding of the value of adopting a participatory, holistic, evidence-based approach to impact assessment. We also critically review the many challenges experienced in this process, including:----- • Tension between the pressure from donors to ‘prove’ impacts and the adoption of a bottom-up, participatory approach based on ‘improving’ programs in ways that meet community needs and aspirations.----- • Resistance from the content teams to changing their existing M&E practices and to the perceived complexity of the approach.----- • Lack of meaningful connection between the M&E and content teams.----- • Human resource problems and lack of capacity in analysing qualitative data and reporting results.----- • The contextual challenges, including extreme poverty, wide cultural and linguistic diversity, poor transport and communications infrastructure, and political instability.----- • A general lack of acceptance of the importance of evaluation within Nepal due to accepting everything as fate or ‘natural’ rather than requiring investigation into a problem.
Resumo:
Urban land use planning and policy decisions are often contested, with the multiple stakeholders (business, developers, residents, policymakers and the wider community) frequently holding opposing viewpoints about the issues and best solution. In recent years, however, the participatory process of social impact assessment (SIA) has received significant attention as a way to mitigate conflict, facilitating negotiation and conflict resolution. This paper examines how social impacts have informed development appeals in Australia, focussing on ten cases from the Queensland Planning and Environment Court (QPEC). Half are appeals from community members (typically neighbours) wanting to oppose approvals and half from organisations appealing against City Councils’ decisions to deny their development applications. While legal challenges do not necessarily reflect attitudes and practices, they provide a means to begin to assess how social impacts (although not often explicitly defined as such) inform development related disputes. Based on the nature and outcomes of 10 QPEC cases, we argue that many legal cases could have been avoided if SIA had been undertaken appropriately. First, the issues in each case are clearly social, incorporating impacts on amenity, the character of an area, the needs of different social groups, perceptions of risk and a range of other social issues. Second, the outcomes and recommendations from each case, such as negotiating agreements, modifying plans and accommodating community concerns would have been equally served thorough SIA. Our argument is that engagement at an early stage, utilising SIA, could have likely achieved the same result in a less adversarial and much less expensive and time-consuming environment than a legal case.
Resumo:
In order to meet the land use and infrastructure needs of the community with the additional challenges posed by climate change and a global recession, it is essential that Queensland local governments test their proposed integrated land use and infrastructure plans to ensure the maximum achievement of triple-bottom line sus-tainability goals. Extensive regulatory impact assessment systems are in place at the Australian and state government levels to substantiate and test policy and legislative proposals, however no such requirement has been extended to the local government level. This paper contends that with the devolution of responsibility to local government and growing impacts of local government planning and development assessment activities, impact assessment of regulatory planning instruments is appropriate and overdue. This is particularly so in the Queensland context where local governments manage metropolitan and regional scale responsibilities and their planning schemes under the Sustainable Planning Act 2009 integrate land use and infrastructure planning to direct development rights, the spatial allocation of land, and infrastructure investment. It is critical that urban planners have access to fit-for-purpose impact assessment frameworks which support this challenging task and address the important relationship between local planning and sustainable urban development. This paper uses two examples of sustainability impact assessment and a case study from the Queensland local urban planning context to build an argument and potential starting point for impact assessment in local planning processes.
Resumo:
This thesis Entitled Environmental impact of Sand Mining :A case Study in the river catchments of vembanad lake southwest india.The entire study is addressed in nine chapters. Chapter l deals with the general introduction about rivers, problems of river sand mining, objectives, location of the study area and scope of the study. A detailed review on river classification, classic concepts in riverine studies, geological work of rivers and channel processes, importance of river ecosystems and its need for management are dealt in Chapter 2. Chapter 3 gives a comprehensive account of the study area - its location, administrative divisions, physiography, soil, geology, land use and living and non-living resources. The various methods adopted in the study are dealt in Chapter 4. Chapter 5 contains river characteristics like drainage, environmental and geologic setting, channel characteristics, river discharge and water quality of the study area. Chapter 6 gives an account of river sand mining (instream and floodplain mining) from the study area. The various environmental problems of river sand mining on the land adjoining the river banks, river channel, water, biotic and social / human environments of the area and data interpretation are presented in Chapter 7. Chapter 8 deals with the Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) of sand mining from the river catchments of Vembanad lake.