945 resultados para construction projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the current emerging development pattern in Malaysia, Malaysian government has enthusiastically promoted green procurement approach that will help the construction project being green. Previous studies highlighted that the concept of green procurement is still very new to the Malaysian construction industry, and this increases the needs for further research in this area. This paper addresses the needs of guidelines for stakeholders to procure environmentally-friendly construction. Currently, there is a limited practical guideline for stakeholders to procure green projects. This paper discusses the progress to date of a research project aimed at developing a green procurement framework for construction projects in the Malaysian construction industry. This framework will guide the stakeholders to plan the green procurement implementation to procure a construction projects. Through literature and expert opinion, this paper explores the list of green practices within procurement practices which becomes the basis to develop a survey instrument that will be used in the later part of this study. The paper will shed useful information for construction researchers and practitioners in exploring the green procurement concept for construction industry in Malaysia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.