958 resultados para construction project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reviews the growing interest in an integrated construction project model, and examines the fundamental concept of an integrated project model by discussing the various definitions that have evolved as well as the various approaches to its development. The nature of collaborative communications that the integrated project model needs to support is also discussed, as are the enabling information and communications technologies that may have a role in the realization of the model. The paper concludes with some thoughts on the future development of the integrated construction project model.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Deakin University’s School of Architecture and Building is renowned for producing graduates who possess relevant attributes that make them job ready for the building and construction industry. Graduate destination surveys indicate that in the last eight (8) years, 100% of all Infrastructure Logistics (Construction and Facility Management) course graduates found relevant employment. This success is a direct result of a curriculum that is responsive to industry needs alongside educational methodology that focuses on excellent teaching and research while seeking new ways of developing and delivering courses.

The Infrastructure Logistics course prepares graduates to successfully compete in today’s global job market, and allows them to showcase relevant knowledge and skills that are critical in seeking and sustaining employment. Traditionally, tailored resumes served this purpose; however, in many professional fields, professional portfolios are now becoming a more desirable way of providing a summary of relevant attributes alongside evidence of professional abilities.

Sustaining employment, appraisals, and applying for a promotion are often subject to adequate evidence of professional standards and growth. Professional bodies require records of contribution to Continuing Professional Development (CPD) schemes; and accrediting organisations require professionals applying for professional registration to provide documented evidence of their relevant experience and abilities. The Australian Institute of Project Management (AIPM 2007) requires candidates wanting to become Registered Project Managers (RegPM) to demonstrate their current work-based experience and competencies.

This paper reports on a teaching strategy adopted in the Project Management (PM) stream, offered as part of Infrastructure Logistic courses. The teaching strategy is based on a combination of constructivism theory of learning, problem and project based learning, and active learning. The strategy requires systematic reflection and conscious creation of documented evidence of PM attributes and competences in the form of a portfolio.

Preliminary results of action research monitoring the effectiveness of systematic reflection indicate that students respond very positively to the idea of professional journals and professional portfolios. Preliminary results also indicate that students accept reflection and conscious documentation of their achievements as an integral part of their study and future practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management plays an important role in successful completion of construction projects. One trend in the construction sector is a growing emphasis on project management. Ineffective integration of project management of project-based enterprises and operational processes of project owners, contractors and consultants prevents synergistic effects and causes resource waste and management inefficiency. Contemporary service theories, specifically service science and service-dominant logic, elucidate the involvement of clients in the creation of value and reinforce the nested relationship between project management service providers and clients. This study expands understanding of service theories by complementing service systems from project management and proposes a new framework for project management service systems, embedding service exchange and value co-creation in the construction processes. Research outcomes represent the importance of project management embedded with service theories in the construction industry and suggestions of research questions for future work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Taylor Family Digital Library is the central library opened in 2011 at the University of Calgary dedicated to supporting digital scholarship, creativity, analysis and a supportive learning environment for students. The new building is a technologically advanced converged cultural institution, with mandates to continually evolve in order to meet the needs of students and researchers. The infrastructure to support these mandates required research, collaboration and intense planning, resulting in new construction and technology standards for library renovation and construction projects. This pragmatic article is written for those who will follow in similar footsteps; it provides a roadmap for those embarking on the construction of a new technologically advanced library building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.