924 resultados para building projects
Resumo:
The concept of constructability uses integration art of individual functions through a valuable and timely construction inputs into planning and design development stages. It results in significant savings in cost and time needed to finalize infrastructure projects. However, available constructability principles, developed by CII Australia (1993), do not cover Operation and Maintenance (O&M) phases of projects, whilst major cost and time in multifaceted infrastructure projects are spent in post-occupancy stages. This paper discusses the need to extend the constructability concept by examining current O&M issues in the provision of multifaceted building projects. It highlights available O&M problems and shortcomings of building projects, as well as their causes and reasons in different categories. This initial categorization is an efficient start point for testing probable present O&M issues in various cases of complex infrastructure building projects. This preliminary categorization serve as a benchmark to develop an extended constructability model that considers the whole project life cycle phases rather than a specific phase. It anticipates that the development of an extended constructability model can reduce significant number of reworks, mistakes, extra costs and time wasted during delivery stages of multifaceted building projects.
Resumo:
The construction phase of building projects is often a crucial influencing factor in success or failure of projects. Project managers are believed to play a significant role in firms’ success and competitiveness. Therefore, it is important for firms to better understand the demands of managing projects and the competencies that project managers require for more effective project delivery. In a survey of building project managers in the state of Queensland, Australia, it was found that management and information management system are the top ranking competencies required by effective project managers. Furthermore, a significant number of respondents identified the site manager, construction manager and client’s representative as the three individuals whose close and regular contacts with project managers have the greatest influence on the project managers’ performance. Based on these findings, an intra-project workgroups model is proposed to help project managers facilitate more effective management of people and information on building projects.
Resumo:
An emerging theme for a nation transiting into a sustainable future is the provision of a low carbon (dioxide) environment. Carbon emission reduction is therefore important for the industry and community as a whole. Buildings contribute immensely to total greenhouse gas emissions, so pragmatic actions need to be taken to cut the amount of carbon emitted by the construction industry. These typically involve strategies such as energy-saving features in the design, construction and operation of building projects. However, a variety of characteristics of the markets and stakeholders involved are suppressing their development. This paper reports on a series of interviews with a variety of Hong Kong construction project participants aimed at identifying the drivers of, and obstacles to, the construction industry's attempts to reduce carbon emissions. The results confirm the main actions currently undertaken are energy efficiency enhancement, green procurement, research and development activities, waste/water management and other technical measures such as the provision of thermal insulation. The majority of the drivers are economical in nature, suggesting that financial aids, and particularly government incentives, are likely to be useful motivators. Also suggested is the increased promotion of the benefits of environmental sustainability to the wider community, in order to alert the general public to the need for reducing the amount of carbon originating from building usage.
Resumo:
Two approaches are described, which aid the selection of the most appropriate procurement arrangements for a building project. The first is a multi-attribute technique based on the National Economic Development Office procurement path decision chart. A small study is described in which the utility factors involved were weighted by averaging the scores of five 'experts' for three hypothetical building projects. A concordance analysis is used to provide some evidence of any abnormal data sources. When applied to the study data, one of the experts was seen to be atypical. The second approach is by means of discriminant analysis. This was found to provide reasonably consistent predictions through three discriminant functions. The analysis also showed the quality criteria to have no significant impact on the decision process. Both approaches provided identical and intuitively correct answers in the study described. Some concluding remarks are made on the potential of discriminant analysis for future research and development in procurement selection techniques.
Resumo:
Design-build (DB) is regarded as an effective means of delivering high performance green buildings, and the selection of DB contractors is of critical importance. The objective of this study is to evaluate the selection of design-builders for public buildings seeking Leadership in Energy and Environmental Design (LEED) certification and compare the selection practices involved with those of non-LEED-seeking DB projects through a robust content analysis of 74 DB request for proposals (RFPs) for public DB projects. The results of the content analysis reveal that the level of LEED certification is the dominant means of conveying the sustainability requirements in RFPs for contractor selection, with the majority of RFPs (60%) including sustainability requirements as part of the contractor evaluation package. With the exception of contractors' past performance, there is no statistically significant difference in the importance weightings of selection criteria between LEED-seeking and non-LEED-seeking buildings, and DB owners tend to place more emphasis on innovative technical solutions rather than the past performance of DB contractors. Additionally, the research findings also indicate that owners of LEED-seeking building projects tend to provide less design decisions in RFPs in order to solicit innovative design alternatives from potential DB contractors. This study provides DB owners with a number of practical implications for selecting appropriate design-builders for green DB projects.
Resumo:
Considering the embodied carbon in existing buildings where expenditure has already occurred, the retrofitting of existing buildings presents a significant opportunity to reduce the carbon footprint of our built environment. In Australia there is also a renewed awareness of the importance of our cultural heritage and the adaptive reuse of our historic buildings is increasingly discussed as a preservation strategy. The ‘design’ phase in building projects is credited with providing “an unparalleled window of opportunity to address environmental objectives” and fostering sustainable development, with up to 80% of overall environmental impacts determined by the decisions made at this stage. Both design and built environment professionals appreciate that a holistic and ‘whole systems’ approach is key in enabling transformation. The design process often comprises of many divergent and convergent activities, many of which seek to understand the people and context. The design process for heritage building adaptive reuse projects revolves around producing or referring to a conservation management plan that articulates what is and isn't heritage fabric. In an Australian context, and according to literature and the emerging results of a series of semi-structured interviews undertaken with designers of such projects, the key themes integral to success are: business case, vision, communication & collaboration, values, and storytelling.
Resumo:
Social and political concerns are frequently reflected in the design of school buildings, often in turn leading to the development of technical innovations. One example is a recurrent concern about the physical health of the nation, which has at several points over the last century prompted new design approaches to natural light and ventilation. The most critical concern of the current era is the global, rather than the indoor, environment. The resultant political focus on mitigating climate change has resulted in new regulations, and in turn considerable technical changes in building design and construction. The vanguard of this movement has again been in school buildings, set the highest targets for reducing operational carbon by the previous Government. The current austerity measures have moved the focus to the refurbishment and retrofit of existing buildings, in order to bring them up to the exacting new standards. Meanwhile there is little doubt that climate change is happening already, and that the impacts will be considerable. Climate scientists have increasing confidence in their predictions for the future; if today’s buildings are to be resilient to these changes, building designers will need to understand and design for the predicted climates in order to continue to provide comfortable and healthy spaces through the lifetimes of the buildings. This paper describes the decision processes, and the planned design measures, for adapting an existing school for future climates. The project is at St Faith’s School in Cambridge, and focuses on three separate buildings: a large Victorian block built as a substantial domestic dwelling in 1885, a smaller single storey 1970s block with a new extension, and an as-yet unbuilt single storey block designed to passivhaus principles and using environmentally friendly materials. The implications of climate change have been considered for the three particular issues of comfort, construction, and water, as set out in the report on Design for Future Climate: opportunities for adaptation in the built environment (Gething, 2010). The adaptation designs aim to ensure each of the three very different buildings remains fit for purpose throughout the 21st century, continuing to provide a healthy environment for the children. A forth issue, the reduction of carbon and the mitigation of other negative environmental impacts of the construction work, is also a fundamental aim for the school and the project team. Detailed modelling of both the operational and embodied energy and carbon of the design options is therefore being carried out, in order that the whole life carbon costs of the adaptation design options may be minimised. The project has been funded by the Technology Strategy Board as part of the Design for Future Climates programme; the interdisciplinary team includes the designers working on the current school building projects and the school bursar, supported by researchers from the University of Cambridge Centre for Sustainable Development. It is hoped that lessons from the design process, as well as the solutions themselves, will be transferable to other buildings in similar climatic regions.
Resumo:
Trabalho de Projecto para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Estruturas
Resumo:
One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.
Resumo:
This paper examines, through case studies, the organization of the production process of architectural projects in architecture offices in the city of Natal, specifically in relation to building projects. The specifics of the design process in architecture, the production of the project in a professional field in Natal, are studied in light of theories of design and its production process. The survey, in its different phases, was conducted between March 2010 and September 2012 and aimed to identify, understand, and analyze comparatively, by mapping the design process, the organization of production of building projects in two offices in Natal, checking as well the relationships of their agents during the process. The project was based on desk research and exploration, adopting, for both, data collection tools such as forms, questionnaires, and interviews. With the specific aim of mapping the design process, we adopted a technique that allows obtaining the information directly from employee agents involved in the production process. The technique consisted of registering information by completing daily, during or at the end of the workday, an individual virtual agenda, in which all agent collaborators described the tasks performed. The data collected allowed for the identification of the organizational structure of the office, its hierarchy, the responsibilities of agents, as well as the tasks performed by them during the two months of monitoring at each office. The research findings were based on analyses of data collected in the two offices and on comparative studies between the results of these analyses. The end result was a diagnostic evaluation that considered the level of organization and elaborated this perspective, as well as proposed solutions aimed at improving both the organization of the process and the relationships between the agents under the lens analyzed
Resumo:
The process of urbanization in recent decades has generated considerable seriousness of problems relating to the use and occupation physical environment of cities. The concentration of population, economic activities and technological standards have reinforced an existing urban environment highly degraded as a consequence of the development style that leads to the predatory use of natural resources. In this context, cities as centers of production and consumption, have the most serious problems of environmental degradation. This study investigated the impacts of the municipal building projects to large-scale vertical in the town of Vila de Ponta Negra, Natal-RN, given the proximity to the Environmental Protection Area (ZPA-6) and considering its environmental importance , scenic, landscape and tourism for the city of Natal-RN. The fragility of the licensing process and the failure of the assumptions in the analysis, objective and subjective, for the granting of environmental permits for the building construction projects, specifically those set out in the surroundings of the Environmental Protection Area (ZPA-6) and fundamental importance of landscape and tourism for the city of Natal, has aroused the concern of local people in and of itself the Government, faced with the probable impacts that will affect greatly the Vila de Ponta Negra. The methodology used to achieve the intended objectives will be the literature review, questionnaire to the surrounding population and the Government, as well as findings on the spot, through the photographic record. The beneficiaries of the license, if the entrepreneurs, have been affected because of the granting of licensing act of investing large amount of capital in the works. Additionally, with distrust of the population, since they are to discredit the public system of environmental management have guessed by the probability of imbalance to the environment and structural damage to the Vila de Ponta Negra, where such failure to support energy, lack of regular supply of water , lack of sanitation and access roads sufficient for the flow of motor vehicles in these areas, among other factors. Thus, this work will contribute to the diagnosis and solutions to the problem in question, so that the Government will effectively fulfill its social management of ecologically balanced environment of continuing urban development in Natal, Brazil
Resumo:
Pós-graduação em Educação Matemática - IGCE
Resumo:
O trabalho trata do fluxo de informações no processo de desenvolvimento de projetos, de edificações comerciais e multifamiliares verticais, gerados a partir das rotinas de comunicação entre empresa construtora, arquiteto, projetistas de estrutura, de instalações elétricas e hidrosanitárias e os procedimentos por eles aplicados, para se alcançar a qualidade desejada dos projetos. São investigados a problemática das metodologias tradicionais de projeto e a aplicabilidade de conceitos de engenharia simultânea, sugerindo a realização em paralelo das varias etapas do processo, desenvolvimento integrado de projetos do produto e da produção, estabelecimento de equipes ultidisciplinares e uma maior orientação para a satisfação do cliente final. É apresentado um método de análise capaz de identificar a maturidade das empresas construtoras para a implantação da engenharia simultânea e a explicitação do fluxo de informações, fornecendo uma visão global do processo de projeto. São realizados três estudos de caso consultando três empresas construtoras e incorporadoras e seus respectivos projetistas: arquiteto, engenheiro estrutural, elétrico e hidrosanitário, os quais corroboram as hipóteses estabelecidas na pesquisa. Como conclusão recomenda-se o desenvolvimento de modelos de processo de projeto baseados nos princípios de engenharia simultânea e métodos que possam vir a oferecer uma visão global do processo, dando suporte aos intervenientes na troca sistematizada e racionalizada das informações, objetivando a introdução de ferramentas que possam contribuir para uma modelagem do processo de projeto harmonizada com os princípios de qualidade.
Resumo:
One of the majors concerns in society today is to decrease the environmental impact caused by human activities and natural resource exploration. From this need to be more careful with the environment arose, in the field of civil construction, the term sustainable building. Projects that use natural resources rationally, without ceasing to bring comfort and functionality for customers, are becoming more a reality. This paper presents the share of electric energy in a sustainable building, with the analysis of the available renewable energies used in a project, presentation of new constructive techniques and technologies that are constantly emerging to achieve greater energy efficiency, with an appropriate use of energy received, also a decrease of the energy consumed by some devices present in a residence or business
Resumo:
La questione energetica ha assunto, negli ultimi anni, un ruolo centrale nel dibattito mondiale in relazione a quattro fattori principali: la non riproducibilità delle risorse naturali, l’aumento esponenziale dei consumi, gli interessi economici e la salvaguardia dell'equilibrio ambientale e climatico del nostro Pianeta. E’ necessario, dunque, cambiare il modello di produzione e consumo dell’energia soprattutto nelle città, dove si ha la massima concentrazione dei consumi energetici. Per queste ragioni, il ricorso alle Fonti Energetiche Rinnovabili (FER) si configura ormai come una misura necessaria, opportuna ed urgente anche nella pianificazione urbanistica. Per migliorare la prestazione energetica complessiva del sistema città bisogna implementare politiche di governo delle trasformazioni che escano da una logica operativa “edificio-centrica” e ricomprendano, oltre al singolo manufatto, le aggregazioni di manufatti e le loro relazioni/ interazioni in termini di input e output materico-energetiche. La sostituzione generalizzata del patrimonio edilizio esistente con nuovi edifici iper-tecnologici, è improponibile. In che modo quindi, è possibile ridefinire la normativa e la prassi urbanistica per generare tessuti edilizi energeticamente efficienti? La presente ricerca propone l’integrazione tra la nascente pianificazione energetica del territorio e le più consolidate norme urbanistiche, nella generazione di tessuti urbani “energy saving” che aggiungano alle prestazioni energetico-ambientali dei singoli manufatti quelle del contesto, in un bilancio energetico complessivo. Questo studio, dopo aver descritto e confrontato le principali FER oggi disponibili, suggerisce una metodologia per una valutazione preliminare del mix di tecnologie e di FER più adatto per ciascun sito configurato come “distretto energetico”. I risultati di tale processo forniscono gli elementi basilari per predisporre le azioni necessarie all’integrazione della materia energetica nei Piani Urbanistici attraverso l’applicazione dei principi della perequazione nella definizione di requisiti prestazionali alla scala insediativa, indispensabili per un corretto passaggio alla progettazione degli “oggetti” e dei “sistemi” urbani.