942 resultados para Water supply services contract


Relevância:

100.00% 100.00%

Publicador:

Resumo:

[Intro.] The Devil’s Gate Dam has been of great benefit to Pasadena’s water supply, in that it prevents a large amount of the flood waters of the Arroyo Seco being wasted into the ocean.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is designed to give a general account of freshwater biology as it bears on waterworks practice. Most water that is used for consumption will commonly go through a storage reservoir. Here special reference is given to the biological relations in standing waters, the biological control of water supplies, methods of plankton estimation, the biology of slow sand filtration and the use of algicides.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper contains a brief report on the status of the California water supply situation on March 1, 1989, including a review of the antecedent conditions of the past two dry water years.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The supply of water to a centrifuge experiment has always been important. This paper details a new system which has been successfully commissioned for use on the geotechnical centrifuge at University of Cambridge. High water pressures and large flow rates were delivered to an experimental package, for the modelling of water injection-aided pile jacking. The practicalities of such a system are discussed in relation to existing alternatives, in addition to the precautions taken to ensure safe centrifuge operation. A method for calculating water pressures in the system away from instrumented locations is also proposed, using a linear relationship between energy per unit volume and the flow rate squared. Experimental data are presented to support these relationships.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The supply of water is often required during a centrifuge experiment. For the case of pile jetting, significant flow volumes and pressures are required from the water supply. This paper aims to detail the successful provision of water at high pressures and large flow rates to a centrifuge, using a novel water supply system. An impeller pump was used to pressurise the water in advance of the slip rings, with further pressure provided by the fluid accelerating along the centrifuge beam arm. A maximum pressure of 2 MPa and continuous flow rate of 6 litres per minute were achieved. The calculation of water pressure away from the measurement location is presented, offering a repeatable solution for the pressure at any point in the pipe work. © 2010 Taylor & Francis Group, London.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A site investigation was conducted to correlate the relationships between microcystins (MC) concentration and algal growth in Dianchi Lake in China. Laboratory experiments were undertaken to test the effects of sediment adsorption, photoirradiation and biodegradation on microcystins removal. Bioaccumulation of microcystins was also determined using silver carp fish. It was observed that MC concentrations varied in accordance with algae growth in Dianchi Lake. The results obtained in the laboratory demonstrated that the removal of MC with fresh sediments was less than 10%, photoirradiation removed more than 75% MC within two hours, and the biodegradation needed much longer time to produce substantial degradation of MC. The results suggest that bioaccumulation of microcystins in fish was not significant in Dianchi Lake.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report describes a novel technology for arsenic removal from groundwater. The work was carried out in India in collaboratio with three Indian and three European partners. European partners include Leiden University of the Netherlands and Stuttgart University of Germany. The work was funded by The World Bank.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.