939 resultados para Water supply networks
Resumo:
This paper contains a brief report on the status of the California water supply situation on March 1, 1989, including a review of the antecedent conditions of the past two dry water years.
Resumo:
The supply of water to a centrifuge experiment has always been important. This paper details a new system which has been successfully commissioned for use on the geotechnical centrifuge at University of Cambridge. High water pressures and large flow rates were delivered to an experimental package, for the modelling of water injection-aided pile jacking. The practicalities of such a system are discussed in relation to existing alternatives, in addition to the precautions taken to ensure safe centrifuge operation. A method for calculating water pressures in the system away from instrumented locations is also proposed, using a linear relationship between energy per unit volume and the flow rate squared. Experimental data are presented to support these relationships.
Resumo:
The supply of water is often required during a centrifuge experiment. For the case of pile jetting, significant flow volumes and pressures are required from the water supply. This paper aims to detail the successful provision of water at high pressures and large flow rates to a centrifuge, using a novel water supply system. An impeller pump was used to pressurise the water in advance of the slip rings, with further pressure provided by the fluid accelerating along the centrifuge beam arm. A maximum pressure of 2 MPa and continuous flow rate of 6 litres per minute were achieved. The calculation of water pressure away from the measurement location is presented, offering a repeatable solution for the pressure at any point in the pipe work. © 2010 Taylor & Francis Group, London.
Resumo:
A site investigation was conducted to correlate the relationships between microcystins (MC) concentration and algal growth in Dianchi Lake in China. Laboratory experiments were undertaken to test the effects of sediment adsorption, photoirradiation and biodegradation on microcystins removal. Bioaccumulation of microcystins was also determined using silver carp fish. It was observed that MC concentrations varied in accordance with algae growth in Dianchi Lake. The results obtained in the laboratory demonstrated that the removal of MC with fresh sediments was less than 10%, photoirradiation removed more than 75% MC within two hours, and the biodegradation needed much longer time to produce substantial degradation of MC. The results suggest that bioaccumulation of microcystins in fish was not significant in Dianchi Lake.
Resumo:
Reducing the energy consumption of water distribution networks has never had more significance. The greatest energy savings can be obtained by carefully scheduling the operations of pumps. Schedules can be defined either implicitly, in terms of other elements of the network such as tank levels, or explicitly by specifying the time during which each pump is on/off. The traditional representation of explicit schedules is a string of binary values with each bit representing pump on/off status during a particular time interval. In this paper, we formally define and analyze two new explicit representations based on time-controlled triggers, where the maximum number of pump switches is established beforehand and the schedule may contain less switches than the maximum. In these representations, a pump schedule is divided into a series of integers with each integer representing the number of hours for which a pump is active/inactive. This reduces the number of potential schedules compared to the binary representation, and allows the algorithm to operate on the feasible region of the search space. We propose evolutionary operators for these two new representations. The new representations and their corresponding operations are compared with the two most-used representations in pump scheduling, namely, binary representation and level-controlled triggers. A detailed statistical analysis of the results indicates which parameters have the greatest effect on the performance of evolutionary algorithms. The empirical results show that an evolutionary algorithm using the proposed representations improves over the results obtained by a recent state-of-the-art Hybrid Genetic Algorithm for pump scheduling using level-controlled triggers.
Resumo:
This report describes a novel technology for arsenic removal from groundwater. The work was carried out in India in collaboratio with three Indian and three European partners. European partners include Leiden University of the Netherlands and Stuttgart University of Germany. The work was funded by The World Bank.
Resumo:
Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.