936 resultados para Transmission network


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An enhanced genetic algorithm (EGA) is applied to solve the long-term transmission expansion planning (LTTEP) problem. The following characteristics of the proposed EGA to solve the static and multistage LTTEP problem are presented, (1) generation of an initial population using fast, efficient heuristic algorithms, (2) better implementation of the local improvement phase and (3) efficient solution of linear programming problems (LPs). Critical comparative analysis is made between the proposed genetic algorithm and traditional genetic algorithms. Results using some known systems show that the proposed EGA presented higher efficiency in solving the static and multistage LTTEP problem, solving a smaller number of linear programming problems to find the optimal solutions and thus finding a better solution to the multistage LTTEP problem. Copyright © 2012 Luis A. Gallego et al.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The hydroelectric power plant Hidroltuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in connecting Hidroltuango, in order to strengthen the Colombian national transmission system. A Mixed Binary Linear Programming (MBLP) model was used to solve the Multistage Transmission Network Expansion Planning (MTEP) problem of the Colombian electrical system, taking the N-1 safety criterion into account. The N-1 safety criterion indicates that the transmission system must be expanded so that the system will continue to operate properly if an outage in a system element (within a pre-defined set of contingencies) occurs. The use of a MBLP model guaranteed the convergence with existing classical optimization methods and the optimal solution for the MTEP using commercial solvers. Multiple scenarios for generation and demand were used to consider uncertainties within these parameters. The model was implemented using the algebraic modeling language AMPL and solved using the commercial solver CPLEX. The proposed model was then applied to the Colombian electrical system using the planning horizon of 2018-2025. (C) 2014 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Transmission expansion planning (TEP) is a classic problem in electric power systems. In current optimization models used to approach the TEP problem, new transmission lines and two-winding transformers are commonly used as the only candidate solutions. However, in practice, planners have resorted to non-conventional solutions such as network reconfiguration and/or repowering of existing network assets (lines or transformers). These types of non-conventional solutions are currently not included in the classic mathematical models of the TEP problem. This paper presents the modeling of necessary equations, using linear expressions, in order to include non-conventional candidate solutions in the disjunctive linear model of the TEP problem. The resulting model is a mixed integer linear programming problem, which guarantees convergence to the optimal solution by means of available classical optimization tools. The proposed model is implemented in the AMPL modeling language and is solved using CPLEX optimizer. The Garver test system, IEEE 24-busbar system, and a Colombian system are used to demonstrate that the utilization of non-conventional candidate solutions can reduce investment costs of the TEP problem. (C) 2015 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A REKK a KEMA International B.V. partnereként a DGTREN által kiírt tender keretében az európai földgáz átviteli hálózati díjszabásokat és a kiegyenlítő gázforgalom lebonyolításának és elszámolásának nemzeti rendszereit hasonlította össze. Az uniós tagállamok körében folytatott kutatás azt is vizsgálta, hogy a nemzeti hálózati és kiegyenlítő rendszerek különbözősége milyen mértékben akadályozza a közös földgázpiac kialakulását.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study presents a new method for determining the transmission network usage by loads and generators, which can then be used for transmission cost/loss allocation in an explainable and justifiable manner. The proposed method is based on solid physical grounds and circuit theory. It relies on dividing the currents through the network into two components; the first one is attributed to power flows from generators to loads, whereas the second one is because of the generators only. Unlike almost all the available methods, the proposed method is assumption free and hence it is more accurate than similar methods even those having some physical basis. The proposed method is validated through a transformer analogy, and theoretical derivations. The method is verified through application to the IEEE 30 bus system and the IEEE 118 test system. The results obtained verified many desirable features of the proposed method. Being more accurate in determining the network usage, in an explainable transparent manner, and in giving accurate cost signals, indicating the best locations to add loads and generation, are among the many desirable features.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Reliability is an integral component of modern power system design, planning and management. This paper uses the Markov approach to substation reliability evaluation using dedicated reliability software. This technique was applied to yield reliability indices for an existing and important substation in the POWERLINK QUEENSLAND 275 kV transmission network. Reliability indices were also determined for several reinforcement alternatives for this substation with the aim of improving substation reliability. The economic feasibility of achieving higher levels of reliability was also taken into account.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Aurizon, Australia's largest rail freight operator, is introducing the Static Frequency Converter (SFC) technology into its electric railway network as part of the Bauhinia Electrification Project. The introduction of SFCs has significant implications on the protection systems of the 50kV traction network. The traditional distance protection calculation method does not work in this configuration because of the effect that the SFC in combination with the remote grid has on the apparent impedance, and was substantially reviewed. The standard overcurrent (OC) protection scheme is not suitable due to the minimum fault level being below the maximum load level and was revised to incorporate directionality and under-voltage inhibit. Delta protection was reviewed to improve sensitivity. A new protection function was introduced to prevent back-feeding faults in the transmission network through the grid connection. Protection inter-tripping was included to ensure selectivity between the SFC protection and the system downstream.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

With the liberalisation of electricity market it has become very important to determine the participants making use of the transmission network.Transmission line usage computation requires information of generator to load contributions and the path used by various generators to meet loads and losses. In this study relative electrical distance (RED) concept is used to compute reactive power contributions from various sources like generators, switchable volt-amperes reactive(VAR) sources and line charging susceptances that are scattered throughout the network, to meet the system demands. The transmission line charge susceptances contribution to the system reactive flows and its aid extended in reducing the reactive generation at the generator buses are discussed in this paper. Reactive power transmission cost evaluation is carried out in this study. The proposed approach is also compared with other approaches viz.,proportional sharing and modified Y-bus.Detailed case studies with base case and optimised results are carried out on a sample 8-bus system. IEEE 39-bus system and a practical 72-bus system, an equivalent of Indian Southern grid are also considered for illustration and results are discussed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The main objective of on-line dynamic security assessment is to take preventive action if required or decide remedial action if a contingency actually occurs. Stability limits are obtained for different contingencies. The mode of instability is one of the outputs of dynamic security analysis. When a power system becomes unstable, it splits initially into two groups of generators, and there is a unique cutset in the transmission network known as critical cutset across which the angles become unbounded. The knowledge of critical cutset is additional information obtained from dynamic security assessment, which can be used for initiating preventive control actions, deciding emergency control actions, and adaptive out-of-step relaying. In this article, an analytical technique for the fast prediction of the critical cutset by system simulation for a short duration is presented. Case studies on the New England ten-generator system are presented. The article also suggests the applications of the identification of critical cutsets.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

With ever increasing demand for electric energy, additional generation and associated transmission facilities has to be planned and executed. In order to augment existing transmission facilities, proper planning and selective decisions are to be made whereas keeping in mind the interests of several parties who are directly or indirectly involved. Common trend is to plan optimal generation expansion over the planning period in order to meet the projected demand with minimum cost capacity addition along with a pre-specified reliability margin. Generation expansion at certain locations need new transmission network which involves serious problems such as getting right of way, environmental clearance etc. In this study, an approach to the citing of additional generation facilities in a given system with minimum or no expansion in the transmission facility is attempted using the network connectivity and the concept of electrical distance for projected load demand. The proposed approach is suitable for large interconnected systems with multiple utilities. Sample illustration on real life system is presented in order to show how this approach improves the overall performance on the operation of the system with specified performance parameters.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In a liberalized electricity market, the Transmission System Operator (TSO) plays a crucial role in power system operation. Among many other tasks, TSO detects congestion situations and allocates the payments of electricity transmission. This paper presents a software tool for congestion management and transmission price determination in electricity markets. The congestion management is based on a reformulated Optimal Power Flow (OPF), whose main goal is to obtain a feasible solution for the re-dispatch minimizing the changes in the dispatch proposed by the market operator. The transmission price computation considers the physical impact caused by the market agents in the transmission network. The final tariff includes existing system costs and also costs due to the initial congestion situation and losses costs. The paper includes a case study for the IEEE 30 bus power system.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. Grid operators and utilities are taking new initiatives, recognizing the value of demand response for grid reliability and for the enhancement of organized spot markets’ efficiency. This paper proposes a methodology for the selection of the consumers that participate in an event, which is the responsibility of the Portuguese transmission network operator. The proposed method is intended to be applied in the interruptibility service implemented in Portugal, in convergence with Spain, in the context of the Iberian electricity market. This method is based on the calculation of locational marginal prices (LMP) which are used to support the decision concerning the consumers to be schedule for participation. The proposed method has been computationally implemented and its application is illustrated in this paper using a 937 bus distribution network with more than 20,000 consumers.