648 resultados para Subway tunnels
Resumo:
This paper describes an interactive set of tools used to determine the safety of tunnels and to provide data for the decision making of its mainteinance. Although, no doubt, there are still several drawbacks in the difficult procedures in use it is clear that the way is promising and future improvements both in experimental and analytical methods will increase our understanding of this matter.
Resumo:
A pressure wave is generated when a high speed train enters a tunnel. This wave travels along the tunnel back and forth, and is reflected at the irregularities of the tunnel duct (section changes, chimneys and tunnel ends). The pressure changes are associated to these waves can have an effect on passengers if the trains are not suitably sealed or pressurized. The intensity of the waves depends mainly on the train speed, and on the blockage ratio (train-section-to- tunnel-section area ratio). As the intensity of the waves is limited by regulations, and also by the effects on passengers and infrastructures, the sizing of the tunnel section area is largely influenced by the maximum train speed allowed in the tunnel. The aim of this study is to analyse the increase in cost in a tunnel due to the existence of this difference in ground level, and evaluate the increase of construction costs that this elevation might involve.
Resumo:
The main objective of ventilation systems in case of fire is the reduction of the possible consequences by achieving the best possible conditions for the evacuation of the users and the intervention of the emergency services. The required immediate transition, from normal to emergency functioning of the ventilation equipments, is being strengthened by the use of automatic and semi-automatic control systems, what reduces the response times through the help to the operators, and the use of pre-defined strategies. A further step consists on the use of closed-loop algorithms, which takes into account not only the initial conditions but their development (air velocity, traffic situation, etc.), optimizing smoke control capacity.
Resumo:
In tunnel construction, as in every engineering work, it is usual the decision making, with incomplete data. Nevertheless, consciously or not, the builder weighs the risks (even if this is done subjectively) so that he can offer a cost. The objective of this paper is to recall the existence of a methodology to treat the uncertainties in the data so that it is possible to see their effect on the output of the computational model used and then to estimate the failure probability or the safety margin of a structure. In this scheme it is possible to include the subjective knowledge on the statistical properties of the random variables and, using a numerical model consistent with the degree of complexity appropiate to the problem at hand, to make rationally based decisions. As will be shown with the method it is possible to quantify the relative importance of the random variables and, in addition, it can be used, under certain conditions, to solve the inverse problem. It is then a method very well suited both to the project and to the control phases of tunnel construction.
Resumo:
RESUMEN: La realización de túneles de gran longitud para ferrocarriles ha adquirido un gran auge en los últimos años. En España se han abordado proyectos de estas características, no existiendo para su ejecución una metodología completa y contrastada de actuación. Las características geométricas, de observación y de trabajo en túneles hace que las metodologías que se aplican en otros proyectos de ingeniería no sean aplicables por las siguientes causas: separación de las redes exteriores e interiores de los túneles debido a la diferente naturaleza de los observables, geometría en el interior siempre desfavorable a los requerimientos de observación clásica, mala visibilidad dentro del túnel, aumento de errores conforme avanza la perforación, y movimientos propios del túnel durante su ejecución por la propia geodinámica activa. Los patrones de observación geodésica usados deben revisarse cuando se ejecutan túneles de gran longitud. Este trabajo establece una metodología para el diseño de redes exteriores. ABSTRACT: The realization of long railway tunnels has acquired a great interest in recent years. In Spain it is necessary to address projects of this nature, but ther is no corresponding methodological framework supporting them. The tunnel observational and working geometrical properties, make that former methodologies used may be unuseful in this case: the observation of the exterior and interior geodetical networks of the tunnel is different in nature. Conditions of visibility in the interior of the tunnels, regardless of the geometry, are not the most advantageous for observation due to the production system and the natural conditions of the tunnels. Errors increase as the drilling of the tunnel progresses, as it becomes problematical to perform continuous verifications along the itinerary itself. Moreover, inherent tunnel movements due to active geodynamics must also be considered. Therefore patterns for geodetic and topographic observations have to be reviewed when very long tunnels are constructed.
Resumo:
A genetic algorithm (GA) is employed for the multi-objective shape optimization of the nose of a high-speed train. Aerodynamic problems observed at high speeds become still more relevant when traveling along a tunnel. The objective is to minimize both the aerodynamic drag and the amplitude of the pressure gradient of the compression wave when a train enters a tunnel. The main drawback of GA is the large number of evaluations need in the optimization process. Metamodels-based optimization is considered to overcome such problem. As a result, an explicit relationship between pressure gradient and geometrical parameters is obtained.
Resumo:
Between 2003 and 2007 an urban network or road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as "Calle 30 Project" counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure includieng, in some parts of the tunnel, fixed fire fighting system based on water mist. Whithin this framework a large-scale programme of fire tests was planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinguishing system. In addition, these large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San pedro of Anes" which includes a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test's programme carried out and some previous results obtained.
Resumo:
In this paper an analytical static approach to analyse buried tunnels under seismic surface waves (Rayleigh and Love waves), propagating parallel to the tunnels axis, is provided. In the proposed method, the tunnel is considered as a beam on elastic foundation by using a Winkler model to represent the subgrade reaction and the soil-structure interaction. The seismic load is imposed by giving at the base of the soil springs a determined configuration corresponding to the free-field motion. From the solution of the differential governing equations of the problem, results are obtained in form of relative displacements between points of tunnel, and therefore the seismic bending moments and shearing forces, acting on the tunnel cross section, can be computed.
Resumo:
At present, engineering problems required quite a sophisticated calculation means. However, analytical models still can prove to be a useful tool for engineers and scientists when dealing with complex physical phenomena. The mathematical models developed to analyze three different engineering problems: photovoltaic devices analysis; cup anemometer performance; and high-speed train pressure wave effects in tunnels are described. In all cases, the results are quite accurate when compared to testing measurements.
Resumo:
RESUMEN La realización de túneles de gran longitud para ferrocarriles ha adquirido un gran auge en los últimos años. En España se han abordado proyectos de estas características, no existiendo para su ejecución una metodología completa y contrastada de actuación. Las características geométricas, de observación y de trabajo en túneles hace que las metodologías que se aplican en otros proyectos de ingeniería no sean aplicables por las siguientes causas: separación de las redes exteriores e interiores de los túneles debido a la diferente naturaleza de los observables, geometría en el interior siempre desfavorable a los requerimientos de observación clásica, mala visibilidad dentro del túnel, aumento de errores conforme avanza la perforación, y movimientos propios del túnel durante su ejecución por la propia geodinámica activa. Los patrones de observación geodésica usados deben revisarse cuando se ejecutan túneles de gran longitud. Este trabajo establece una metodología para el diseño de redes exteriores. ABSTRACT: The realization of long railway tunnels has acquired a great interest in recent years. In Spain it is necessary to address projects of this nature, but ther is no corresponding methodological framework supporting them. The tunnel observational and working geometrical properties, make that former methodologies used may be unuseful in this case: the observation of the exterior and interior geodetical networks of the tunnel is different in nature. Conditions of visibility in the interior of the tunnels, regardless of the geometry, are not the most advantageous for observation due to the production system and the natural conditions of the tunnels. Errors increase as the drilling of the tunnel progresses, as it becomes problematical to perform continuous verifications along the itinerary itself. Moreover, inherent tunnel movements due to active geodynamics must also be considered. Therefore patterns for geodetic and topographic observations have to be reviewed when very long tunnels are constructed.
Resumo:
We report here a hitherto undescribed form of cell migration. When a suspension of human keratinocytes is plated on a fibrin matrix, single cells invade the matrix and progress through it as rounded cells by dissolving the fibrin and thereby creating tunnels. These tunnels are cylindrical or helical, the latter being the result of constant change in the path of cellular advance around the helical axis. Helical tunnel formation is strongly promoted by epidermal growth factor. The rate of migration of the cell through the track of a helical tunnel (up to 2.1 mm per day) is about 7-fold greater than through a cylindrical tunnel. Pericellular fibrinolysis leading to tunnel formation depends on the presence of plasminogen in the medium and its conversion to plasmin by a cellular activator. Formation of tunnels requires that plasminogen activator be localized on the advancing surface of the keratinocyte; we propose that the tunnel is cylindrical when the site of release of plasmin is located at a fixed point on the cell surface and helical when the site of release precesses.
Resumo:
Contains blueprint from the Boston Elevated Railway's construction of subway lines underneath Harvard Square. Indicates area of Harvard Yard where construction crews discovered stones likely from the foundation of Goffe College.
Resumo:
Second copy of the previous blueprint. Also includes a 1934 letter from Edward Dana of the Boston Elevated Railway Public Trustees to Samuel Eliot Morison, Editor of The Tercentennial History of Harvard University responding to Morison's request for additional information about discovery of early Harvard building foundations during the subway construction excavation in Harvard Square.
Resumo:
Contains prints of floor plans of Harvard College used for publication by Samuel E. Morison.
Resumo:
This layer is a georeferenced raster image of the historic paper map entitled: Map showing routes & stations on the dual system October, 1918. It was published by State of New York Public Service Commission for the First District in 1918. Scale [ca. 1:46,000]. Covers Manhattan, Queens, Brooklyn, and Bronx, New York, N.Y. The image inside the map neatline is georeferenced to the surface of the earth and fit to the Universal Transverse Mercator (UTM) Zone 18N NAD83 projection. All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as subway and elevated railroad lines and stations, drainage, and more. Includes inset: Sub Plan. Includes legend and key. This layer is part of a selection of digitally scanned and georeferenced historic maps from The Harvard Map Collection as part of the Imaging the Urban Environment project. Maps selected for this project represent major urban areas and cities of the world, at various time periods. These maps typically portray both natural and manmade features at a large scale. The selection represents a range of regions, originators, ground condition dates, scales, and purposes.