985 resultados para Rock mass


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Some of the geotechnical parameters used in the analysis may not be accurately measured directly from laboratory tests due to effects of sample disturbance and errors of tests. The back analysis or the observational method are thus often applied to determine the representative and/or dominant strength parameters based on field observations in practice. Based on the Hoek-Brown failure criterion, it was known that the disturbance factor (D) should be determined with caution. The difficulty of measuring rock mass disturbance accurately has been shown. Three rock slope failures will be investigated in this paper using back-analysis technique. In addition, various rock mass strength parameters are taken into consideration.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The present paper details the prediction of blast induced ground vibration, using artificial neural network. The data was generated from five different coal mines. Twenty one different parameters involving rock mass parameters, explosive parameters and blast design parameters, were used to develop the one comprehensive ANN model for five different coal bearing formations. A total of 131 datasets was used to develop the ANN model and 44 datasets was used to test the model. The developed ANN model was compared with the USBM model. The prediction capability to predict blast induced ground vibration, of the comprehensive ANN model was found to be superior.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Incident energy gets transmitted, reflected and absorbed across an interface in jointed rock mass leading to energy dissipation and alteration of waves. Wave velocities get attenuated during their propagation across joints and this behavior is studied using bender/extender element tests. The velocity attenuation and modulus reduction observed in experimental tests are modeled with three dimensional distinct element code and results are validated. Normal propagation of an incident shear wave through a jointed rock mass cause slip of the rock blocks if shear stress of wave exceeds the shear strength of the joint. As the properties of joint determine the transmission of energy across an interface, a parametric study is then conducted with the validated numerical model by varying the parameters that may determine the energy transmission across a joint using modified Miller's method. Results of the parametric study are analyzed and presented in the paper. (C) 2014 Elsevier Ltd. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Densely compacted bentonite or bentonite-sand mixture has been identified as suitable buffer in deep geological repositories as its exceptionally high swelling capacity enables tight contact between the waste canister and surrounding rock. The degree of saturation of the compacted bentonite buffer can increase upon ingress of groundwater from the surrounding rock mass or decrease from evaporation due to high temperature (50-210 degrees C) derived from the waste canister. Available studies indicate that the influence of initial moisture content or degree of saturation on the swell pressure or swell potential of compacted bentonites is unclear. Some studies suggest that initial degree of saturation has an influence, while others suggest that it does not have bearing on the swell pressure of compacted bentonites. This paper examines the influence of initial degree of saturation in montmorillonite voids (termed,S-r,S-MF) on swell pressure of compacted Barmer bentonite-sand mixtures (dry density range: 1.4-2 Mg/m(3)) from micro-structural considerations. The experimental results bring out that, constant dry density specimens that developed similar number of hydration layers upon wetting developed comparable swell pressures and were unaffected by variations in initial S-r,S-MF values. Comparatively, constant dry density specimens that developed dis-similar number of hydration layers upon wetting established different swell pressures and were responsive to variations in initial S-r,S-MF. (C) 2015 Elsevier Ltd. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Three-dimensional discrete element face-to-face contact model with fissure water pressure is established in this paper and the model is used to simulate three-stage process of landslide under fissure water pressure in the opencast mine, according to the actual state of landslide in Panluo iron mine where landslide happened in 1990 and was fathered in 1999. The calculation results show that fissure water pressure on the sliding surface is the main reason causing landslide and the local soft interlayer weakens the stability of slope. If the discrete element method adopts the same assumption as the limit equilibrium method, the results of two methods are in good agreement; while if the assumption is not adopted in the discrete element method, the critical phi numerically calculated is less than the one calculated by use of the limit equilibrium method for the same C. Thus, from an engineering point of view, the result from the discrete element model simulation is safer and has more widely application since the discrete element model takes into account the effect of rock mass structures.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

针对断续节理岩体提出了一种随机计算模型.在该模型中,假设结构面的形状为正方形,通过岩体结构面的统计分布函数模拟结构面的空间随机分布.给出了随机节理模型的实现方法,对该随机模型的算法可靠性进行了验证.通过单向加载模拟试验研究了节理岩体破坏强度与节理倾角及节理连通率等因素的关系,并与极限平衡条件推导的理论结果进行了比较,分析了数值模拟结果与极限平衡理论结果的异同性,进而验证了节理随机计算模型的可靠性.同时,研究了节理连通率与岩体等效弹性模量之间的影响关系,给出了二者的影响关系式.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

在岩石材料非均匀特性的基础上,建立了弹塑性概率材料本构.认为材料单元的切线模量与破坏强度都是服从二参数Weibull分布的随机量,通过用户材料子程序将该本构导入到LS-DYNA3D中,推导了程序流程,分析了导入过程中的关键技术.算例验证表明,应用该本构模拟得出的现象与实验观测完全一致,这是确定性本构无法实现的.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

位于茅坪滑坡体后缘的白岩危岩体于2002年8月24日发生了大规模的崩塌。崩落的块石落在滑坡体上,对滑坡体产生了加载作用,影响了该滑坡体的稳定性。为研究茅坪滑坡体的稳定性,有必要弄清滑坡体上崩落块石的堆积情况。论文在对清江隔河岩水库白岩危岩体崩塌现场调查的基础上,估算了崩塌岩体的体积,实地测量了岩体崩塌后堆积体表面块石的尺寸以及各块石空间位置坐标。对测量的结果进行了统计分析。根据所测量的块石尺寸、得到了崩落岩体的块体大小级配累积曲线图和各块石尺度出现的概率,从而阐明了各尺度崩落块石组合情况。根据各块石尺寸和各块石空间位置坐标、分析得到不同尺寸崩落块石落在滑坡体上的空间分布规律,从而为茅坪滑坡的进一步研究打下了基础。

Relevância:

60.00% 60.00%

Publicador:

Resumo:

选择了3种有代表性的岩体结构进行冲击试验,分析研究了波形最大峰值变化与岩体结构的关系.试验结果表明:震动峰值随空间衰减、震动峰值延时及其离散性变化均能有效反映岩体结构特点和受扰动程度,也能反映岩体的各向异性.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

把岩石抽象为Kelvin-Voigt黏弹性体, 应用复数理论建立了应力波在岩石中传播时的振动频率和波动频率的关系, 在此基础上, 研究了岩石和含有一组平行结构面的岩体中应力波幅值随时间和随空间衰减的关系. 研究表明, 应力波在岩石的传播过程中, 频率是影响应力波幅值衰减的的主要因素; 应力波在含有1组平行结构面岩体的传播过程中, 由于结构面的存在, 影响了应力波能量的传播, 其幅值随时空衰减系数主要由结构面间距及其反射系数决定, 结构面间距减小和反射系数增加, 幅值随传播距离的衰减系数增加和随时间的衰减系数减小, 而结构面的黏性系数增加, 幅值随传播距离的衰减系数增加, 但随时间的衰减系数变化很小. 上述结论对岩体结构探测具有重要的指导意义

Relevância:

60.00% 60.00%

Publicador:

Resumo:

工程开挖卸荷后岩体参数研究一直是工程界关注的焦点,是稳定性评价的基础性工作.本文以锦屏地下厂房开挖工程为背景,通过对上下游边墙不同桩号段开挖揭露的岩体进行工程地质岩组划分,进行了开挖后岩体质量评价并对其进行分类,通过在GSI(Geological Strength Index)评价体系中引入Jv(节理数/m3),使评价体系相对合理化,经回归分析,对不同风化程度的岩体进行了力学参数求解,发现内聚力及内摩擦角的计算值与建议值吻合较好

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dam is the key main works in the construction of water power. The success or failure of the construction of the dam mainly depends on the stability of the dam foundation. The double curvature arch dam-XiaoWan Dam is the highest one among the dams with the same type in the world, and the water thrust acted on it reaches ton, so the rock bearing capacity of dam foundation becomes more important. Because of the high and steep valley-side slope, the large scale of excavation and the complex body type of excavation, it is prominent that the problem of stress release of the rock mass in dam foundation. More great attentions should be paid for the stability and the degraded of rock properties of rock mass induced by the stress release. In this paper, the phenomena of stress release of rock mass in XiaoWan Dam foundation and its mechanisms were analyzed based on the collection of data, the detailed field engineering investigations, measurement of the rock mass and the 2D numerical calculations. The rock mass under the foundation is weak-weathered to intact, the quality of which is good. After excavation of the foundation, the rock mass near the slope surface occurred extend, stretch and stick-slip along original textures till the new fracture surface formed. Then platy structure of the rock mass takes on. The rock mass in the dam foundation occur resilience due to stress release towards free faces with the characteristics of time effect and localized deformation. In-situ measurements show that the rock mass near the surface are degraded. The stress release induced by excavation is a process of the interaction between engineering structures and geologic body. The stress release of rock mass in dam foundation is related to the changed degree of geometrical conditions. The rock near excavation surface failed nearly under uniaxial stresses. The bending-breaking mechanism of plate girder can interpret the failure model of the rock mass with platy structure in dam foundation slope. In essence, the stress release is the change of stress field including the change of directions and magnitudes of stress induced by excavation, which can induce the comedown of the safety margin. In this paper, the inducing conditions of stress release were calculated by numerical analyses. Moreover, from the point of view that the change of stress field, the coefficient of K, i.e. the variable load coefficient was proposed. Then the law of the change of it is interpreted. The distributional characteristics of fracture zone were expressed by the coefficient. The stress release of hard rock has the characteristic of localization. The measuring technique of sound wave can not reflect the small cracks in this kind of rock mass due to stress release. So, the spectral analysis method was proposed. At the same time, the application foreground in engineering of the Stockwell Time-Frequency- Spectrum method was discussed with a view to the limitation of it.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The anchorages are unparalleled structures only in a suspension bridge, and as main bearing facilities, play an important role in connecting the superstructures and the ground. The tunnel anchorage, as one alternative type of the anchorages, has more advantages over its counterpart, the gravity anchorage. With the tunnel anchorages adopted, not only can surface excavation be reduced to protect the environment, and natural condition of the rock be utilized and potential bearing capacity of surrounding rock be mobilized to save engineering cost, but also the technological predominance of auxiliary engineering measures, such as prestressed concrete, anchoring piles, rock anchors and collar beam between the two separated anchorages, can be easily cooperated to work together harmoniously under the circumstances of poor rock quality. There are plentiful high mountains and deep canyons in west part of China, and long-span bridge construction is inevitably encountered in order to realize leapfrogging development of the transportation infrastructure. Western mountainous areas usually possess the conditions for constructing tunnel anchorages, and therefore, the tunnel anchorages, which are conformed to the conception of resource conservative and sustainable society, extremely have application and popularization value in western underdeveloped region. The scientific and technological problem about the design, construction and operation of tunnel anchorages should be further investigated. Combining the engineering of western tunnel anchorages for the Balinghe Suspension Bridge, this paper probed into the survey method and in-situ test method for tunnel anchorages, scientific rock quality evaluation of surrounding rock to provide reasonable physical and mechanical parameters for design, construction and operation of tunnel anchorages, bearing capacity estimation for tunnel anchorage, deformation prediction of the anchorage-rockmass system, tunnel-anchorage slope stability analysis and the evaluation of excavation stability and degree of safety of the anchorage tunnel. The following outcomes were obtained: 1. Materials of tunnel anchorages of suspension bridge built (and in progress) at home and abroad were systematically sorted out, with the engineering geological condition and geomechanical property of surrounding rock around the anchorage tunnel, the design size of anchorages and the construction method of anchorage tunnel paid more emphasis on, to unveil the internal relationship between the engineering geological conditions of surrounding rock and the design size and axis angle of anchorages and provide references for future design, construction and study of tunnel anchorages. 2. Physical and mechanical parameters were recommended based on three domestic and foreign methods of rock quality evaluation. 3. In-situ tests, adopting the back-thrust method, of two kinds of reduced scale model, 1/30 and 1/20, for the tunnel anchorages were conducted in the declining exploration drift with rock mass at the test depth being the same as surrounding rock around real anchorages, and reliable field rockmass displacement data were acquired. Attenuation relation between the increment of distance from the anchorage and the decrement of rockmass displacement under maximum test load, and influential scope suffered by anchorage load were obtained. 4. Using similarity theory, the magnitude of real anchorage and rockmass displacement under design load and degree of safety of the anchorage system were deduced. Furthermore, inversion analysis to deformation modulus of slightly weathered dolomite rock, the surrounding rock of anchorage tunnel, was performed by the means of numerical simulation. 5. The influential law of the geometrical size to the limit bearing capacity of tunnel anchorage was studied. 6. Based on engineering geological survey data, accounting for the combination of strata layer and adverse discontinuities, the failure patterns of tunnel anchorage slope were divided into three modes: sliding of splay saddle pier slope, superficial-layer slippage, and deep-layer slippage. Using virtual work principle and taking anchorage load in account, the stability of the three kinds of failure patterns were analyzed in detail. 7. The step-by-step excavation of anchorage tunnel, the numerical overload and the staged decrement of rock strength parameters were numerically simulated to evaluate the excavation stability of surrounding rock around anchorage tunnel, the overload performance of tunnel anchorage, and the safety margin of strength parameters of the surrounding rock.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The two major issues in mining industry are work safety and protection of ground environment when carrying on underground mining activities. Cut-and-fill mining method is increasingly applied in China owing to its advantages of controlling ground pressure and protecting the ground environment effectively. However, some cut-and-fill mines such as Jinchuan nickel mine which has big ore body, broken rock mass and high geostress have unique characteristics on the law of ground pressure and rock mass movement that distinguish from other mining methods. There are still many problems unknown and it is necessary for the further analysis. In this dissertation, vast field survey, geology trenching and relative data analysis are carried out. The distribution of ground fissures and the correlation of the fissures with the location of underground ore body is presented. Using of monitoring data by three-dimension fissure meter and GPS in Jinchuan Deposit Ⅱ, the rule of the surface deformation and the reason of ground fissures generation are analyzed. It is shown that the stress redistribution in surrounding rocks resulting from mining, the existence of the void space underground and the influence of on-going mining activities are three main reasons for the occurrence of ground fissures. Based on actual section planes of No.1 ore body, a large-scale 3D model is established. By this model, the complete process of excavation and filling is simulated and the law of rock mass movement and stability caused by Cut-and-fill Mining is studied. According to simulation results, it is concluded that the deformation of ground surface is still going on developing; the region of subsidence on the ground surface is similar with a circle; the area on the hanging wall side is larger than one on the lower wall side; the contour plots show the centre of subsidence lay on the hanging wall side and the position is near the ore body boundary of 1150m and 1250m where ore body is the thickest. Along strike-line of Jinchuan Deposit Ⅱ, the deformation at the middle of filling body is larger than that in the two sides. Because of the irregular ore body, stress concentrates at the boundary of ore body. With the process of excavation and filling, the high stress release and the stress focus disappear on the hanging wall side. The cut-and-fill mechanism is studied based on monitoring data and numerical simulation. The functions of filling body are discussed. In this dissertation, it is concluded that the stress of filling body is just 2MPa, but the stress of surrounding rock mass is 20MPa. We study the surface movement influenced by the elastic modulus of backfill. The minimal value of the elastic modulus of backfill which can guarantee the safety production of cut-and-fill mine is obtained. Finally, based on the real survey results of the horizontal ore layer and numerical simulation, it is indicated that the horizontal ore layer has destroyed. Key words: cut-and-filling mining, 3D numerical simulation, field monitoring, rock mass movement, cut-and-filling mechanism, the elastic modulus of backfill, the horizontal ore layer

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Xiao-wan Power Station is the second highest arch dam in the world under construction. The height of the dam is about 292m. Large-scale excavation in the dam foundation of Xiao-wan Power Station has brought intensive unloading phenomenon. We collected a large number of firsthand data on unloaded rock mass in dam foundation, which supplies a natural testing ground for researching unloaded rock mass after excavation. Detailed study was carried out on the parameters of unloaded rock mass in the dam foundation of Xiao-wan Power Station. The study is not only importance for the Xiao-wan Power Station, but also has important instruction significance to similar projects in the Southwest of China. In order to study the mechanical parameters of unloaded rock mass, large field and laboratory tests were carried out. The test results showed the size effect of the sample is obvious. The change of deformation modulus of rock is not obvious. However, the Poisson's ratio of rock is increased under unloaded condition, its value is even more than 0.5. The theoretical forecasted results is accordance to the field tests including sound wave data and deformation monitoring data, which shows the forecasted results were reasonable. The soften yield criterion was adopted in the thesis to study the characteristics of the brittle rock mass in order to simulate their brittle failures. Based on the study results above, the transform of the structural plane network model to the numerical one was carried out, which made it feasible to consider the influence of large amount joints on the mechanical characteristic of rock mass in the numerical analyses. Using a factor, the degree of the damage or strengthen of rock mass can be determined rapidly, which proposed a rapid and feasible method for the determination of the parameters of rock mass.