998 resultados para Recovery project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final do Curso de Mestrado Integrado em Medicina, Faculdade de Medicina, Universidade de Lisboa, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"United States Atomic Energy Commission Contract No. AT (49-6)-916."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"United States Atomic Energy Commission Contract No. AT (49-6)-916."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"United States Atomic Energy Commission Contract No. AT (49-6)-916."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"United States Atomic Energy Commission Contract No. AT (49-6)-916."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Project no. 80.183."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It has been observed in several Jameson cell installation where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 mm is not as great as that of finer material. Consequently, a research project was undertaken at a CHPP in the Bowen Basin Queensland to assess the possibility of increasing the recovery of coarser particles (+0.5 mm) within the downcomer of the Jameson cell. The effect of decreasing turbulence and agitation in a commercial-scale downcomer was investigated to assess the effect oil the recovery of both coarse and fine coal particles. This paper details the findings of the test work, summarising the results relating to differences in the operating parameters within the downcomer. (C) 2005 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Geological sequestration of CO2 is a technically feasible and potentially economic option for significantly and safely reducing greenhouse gas emissions, with CO2 injection already practiced in Canada and the USA to enhance crude oil production. The Enhanced Coalbed Methane (ECBM) process is seen as the next most economical sequestration options. The authors estimate an incremental methane recovery factor from 20% to 50%, depending on coal rank and seam depth. Others have estimated the potential to increase worldwide CBM production, utilising ECBM, by 18 Trillion cubic meters, while simultaneously sequestering 345 Giga tonnes of CO2. This paper presents technical and economic factors to consider for developing a commercial ECBM project. Technical factors include: geostructural and hydrogeological issues, geochemical reactions, stressed and competitive sorption, counter-diffusion, effective and relative 4-D coal permeability and methane recovery levels. Key economic factors are injectant acquisition price, sale price of methane and the level of carbon credits.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A comprehensive survey of industrial sites and heat recovery products revealed gaps between equipment that was required and that which was available. Two heat recovery products were developed to fill those gaps: a gas-to-gas modular heat recovery unit; a gas-to-liquid exhaust gas heat exchanger. The former provided an entire heat recovery system in one unit. It was specifically designed to overcome the problems associated with existing component system of large design commitment, extensive installation and incompatibility between parts. The unit was intended to recover heat from multiple waste gas sources and, in particular, from baking ovens. A survey of the baking industry defined typical waste gas temperatures and flow rates, around which the unit was designed. The second unit was designed to recover heat from the exhaust gases of small diesel engines. The developed unit differed from existing designs by having a negligible effect on engine performance. In marketing terms these products are conceptual opposites. The first, a 'product-push' product generated from site and product surveys, required marketing following design. The second, a 'market-pull' product, resulted from a specific user need; this had a captive market and did not require marketing. Here marketing was replaced by commercial aspects including the protection of ideas, contracting, tendering and insurance requirements. These two product development routes are compared and contrasted. As a general conclusion this work suggests that it can be beneficial for small companies (as was the sponsor of this project) to undertake projects of the market-pull type. Generally they have a higher probability of success and are less capital intensive than their product-push counterparts. Development revealed shortcomings in three other fields: British Standards governing heat exchangers; financial assessment of energy saving schemes; degree day procedure of calculating energy savings. Methods are proposed to overcome these shortcomings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of the pyrolysis process to obtain valuable products from biomass is amongst the technologies being investigated as a source for renewable energy. The pyrolysis process yields products such as biochar, bio-oil and non condensable gases. The main objective of this project is to increase energy recovery from sewage sludge by utilising the intermediate pyrolysis process. The intermediate pyrolysis has a residence time ranging from 5 to 10 minutes. The main product yields from sewage sludge pyrolysis are 50 wt% biochar, 40 wt% bio-oil and 10 wt% non condensable gases. The project was carried out on a pilot plant scale reactor with a load capacity of 20 kg/h. This enabled a high yield of biochar and bio-oil. The characterisation of the products indicated that the organic phase of the bio-oil had good fuel properties such as having high energy content of 39 MJ/kg, low acid number of 21.5, high flash point of 150 and viscosity of 35 cSt. An increase in pyrolysis experiments enabled large quantities of pyrolysis oil production. Co-pyrolysis of sewage sludge was carried out on laboratory scale with mixed wood, rapeseed and straw. It found that there was an increase in bio-oil quantity with rapeseed while co-pyrolysis with wood helped to mask the smell of the sludge pyrolysis oil. Engine test were successfully carried out in an old Lister engine with pyrolysis oil fractions of 30% and 50% blended with biodiesel. This indicates that these pyrolysis oil fractions can be used in similar engine types without any problems however long term effects in ordinary engines are unknown. An economic evaluation was carried out about the implementation of the intermediate pyrolysis process for electricity production in a CHP using the pyrolysis oil. The prices of electricity per kWh were found to be very high.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Date of Acceptance: 28/01/2014 Funded by Seventh Framework Programme as part of the European research project EcoFishMan. Grant Number: FP7-265401 The Marine Alliance for Science and Technology for Scotland Scottish Funding Council. Grant Number: HR09011

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Date of Acceptance: 28/01/2014 Funded by Seventh Framework Programme as part of the European research project EcoFishMan. Grant Number: FP7-265401 The Marine Alliance for Science and Technology for Scotland Scottish Funding Council. Grant Number: HR09011

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was funded by the National Institute for Health Research (NIHR) Health Services and Delivery Research programme and will be published in full in Health Services and Delivery Research; Vol. 4, No. 24. See the NIHR Journals Library website for further project information.