992 resultados para Recovery project
Resumo:
(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.
Resumo:
The elaboration of a generic decision-making strategy to address the evolution of an emergency situation, from the stages of response to recovery, and including a planning stage, can facilitate timely, effective and consistent decision making by the response organisations at every level within the emergency management structure and between countries, helping to ensure optimal protection of health, environment, and society. The degree of involvement of stakeholders in this process is a key strategic element for strengthening the local preparedness and response and can help a successful countermeasures strategy. A significant progress was made with the multi-national European project EURANOS (2004-2009) which brought together best practice, knowledge and technology to enhance the preparedness for Europe's response to any radiation emergency and long term contamination. The subsequent establishment of a European Technology Platform and the recent launch of the research project NERIS-TP ("Towards a self sustaining European Technology Platform (NERIS-TP) on Preparedness for Nuclear and Radiological Emergency Response and Recovery") are aimed to continue with the remaining tasks for gaining appropriate levels of emergency preparedness at local level in most European countries. One of the objectives of the NERIS-TP project is: Strengthen the preparedness at the local/national level by setting up dedicated fora and developing new tools or adapting the tools developed within the EURANOS projects (such as the governance framework for preparedness, the handbooks on countermeasures, the RODOS system, and the MOIRA DSS for long term contamination in catchments) to meet the needs of local communities. CIEMAT and UPM in close interaction with the Nuclear Safety Council will explore, within this project, the use and application in Spain of such technical tools, including other national tools and information and communication strategies to foster cooperation between local, national and international stakeholders. The aim is identify and involve relevant stakeholders in emergency preparedness to improve the development and implementation of appropriate protection strategies as part of the consequence management and the transition to recovery. In this paper, an overview of the "state of the art" on this area in Spain and the methodology and work Plan proposed by the Spanish group within the project NERIS to grow the stakeholder involvement in the preparedness to emergency response and recovery is presented.
Resumo:
The estimation of power losses due to wind turbine wakes is crucial to understanding overall wind farm economics. This is especially true for large offshore wind farms, as it represents the primary source of losses in available power, given the regular arrangement of rotors, their generally largerdiameter and the lower ambient turbulence level, all of which conspire to dramatically affect wake expansion and, consequently, the power deficit. Simulation of wake effects in offshore wind farms (in reasonable computational time) is currently feasible using CFD tools. An elliptic CFD model basedon the actuator disk method and various RANS turbulence closure schemes is tested and validated using power ratios extracted from Horns Rev and Nysted wind farms, collected as part of the EU-funded UPWIND project. The primary focus of the present work is on turbulence modeling, as turbulent mixing is the main mechanism for flow recovery inside wind farms. A higher-order approach, based on the anisotropic RSM model, is tested to better take into account the imbalance in the length scales inside and outside of the wake, not well reproduced by current two-equation closure schemes.
Resumo:
The five installations operated by the Department of Defense (DoD) in the Front Range region of Colorado do not meet the DoD non-hazardous solid waste diversion goal of 40 percent, further impacting landfills and generating greenhouse gases. This applied capstone project identifies and evaluates best management practices of a Materials Recovery Facility (MRF), qualitatively and quantitatively, to increase solid waste diversion at a DoD MRF. An environmental benefits model quantified the externalities of increasing solid waste diversion at the installations. By implementing best management practices at a MRF, the DoD would divert an additional 1,400 tons of solid waste per year, resulting in the equivalent of 1,502,567 gallons of gasoline being saved, among many benefits presented in this capstone.
Resumo:
The endangered Rio Grande silvery minnow (Hybognathus amarus; RGSM) is nearing extinction and requires immediate recovery actions. In a draft report to the Middle Rio Grande Program, a Program Advisory Panel (PAP) recommended 34 short-term recovery measures to be implemented within the next five years, and 21 long-term recovery actions. However, these recommendations need further analysis to determine if and how the actions could be implemented. This project evaluated short-term recommendations provided by the PAP to identify the most effective and rank the relative importance of the actions. These recommendations were divided into 7 recovery categories: population augmentation (5 recommendations); hydrologic regimen (4 recommendations); physical habitat (3 recommendations); biological component of habitat (2 recommendations); population monitoring (6 recommendations); monitoring, analysis, and modeling (12 recommendations); and information and planning (2 recommendations). Each recommendation was evaluated for its potential to produce anticipated recovery progress for the RGSM based on assessments of the degree of feasibility, cost effectiveness, and associated potential consequences if fully implemented. In addition, other alternatives in a range of options were also considered where applicable. In each case, recommendations were evaluated from on-site visits, interviews with researchers and resource managers, and literature review. Based on the research findings, three major groupings of the recovery categories were identified: natural aspects of recovery, program aspects of recovery, and emergency measures. At least one recovery category within each major grouping was considered important by the respondents, which indicates that each grouping is of high importance in relation to the situation at hand. However, actions within each grouping have varying priorities given constraints on available resources, time, and budget. An integrated approach that accounts for the complexity of the river system and the species itself was considered the best approach to avoid extinction while ensuring long-term sustainability. Results of these analyses were provided directly to the PAP for their review, and it is anticipated that project results could advance implementation of the most appropriate immediate recovery actions needed to prevent extinction of the RGSM.
Resumo:
The optimal integration between heat and work may significantly reduce the energy demand and consequently the process cost. This paper introduces a new mathematical model for the simultaneous synthesis of heat exchanger networks (HENs) in which the pressure levels of the process streams can be adjusted to enhance the heat integration. A superstructure is proposed for the HEN design with pressure recovery, developed via generalized disjunctive programming (GDP) and mixed-integer nonlinear programming (MINLP) formulation. The process conditions (stream temperature and pressure) must be optimized. Furthermore, the approach allows for coupling of the turbines and compressors and selection of the turbines and valves to minimize the total annualized cost, which consists of the operational and capital expenses. The model is tested for its applicability in three case studies, including a cryogenic application. The results indicate that the energy integration reduces the quantity of utilities required, thus decreasing the overall cost.
Resumo:
This study analyses the effect of successional stage after farmland terrace abandonment on post-fire plant recovery in a Mediterranean landscape. Specific objectives of the study were to (1) compare fuel characteristics and fire severity in three successional stages after farmland abandonment – dry grassland, dense shrubland and pine stands; (2) analyse the effect of pre-fire successional stage and fire severity on vegetation recovery and (3) analyse the relative vulnerability (i.e. potential for ecosystem shift and soil degradation) to wildfires of the successional stages. We assessed 30 abandoned terraces (15 unburned and 15 burned), with diverse successional stages, on the Xortà Range (south-east Spain). Post-fire recovery was measured 1, 4 and 7 years after fire. The successional stages varied in aboveground biomass, litter amount, vertical structure and continuity of plant cover, and flammability. Dry grassland showed the lowest fire severity, whereas no differences in severity were found between shrubland and pine stands. One year after fire, plant cover was inversely related to fire severity; this relationship attenuated with time after fire. Post-fire recovery of pine stands and shrubland led in both cases to shrublands, contributing to landscape homogenisation. The pine stands showed the largest changes in composition due to fire and the lowest post-fire plant recovery – a sign of high vulnerability to fire.
Resumo:
This paper presents a new mathematical programming model for the retrofit of heat exchanger networks (HENs), wherein the pressure recovery of process streams is conducted to enhance heat integration. Particularly applied to cryogenic processes, HENs retrofit with combined heat and work integration is mainly aimed at reducing the use of expensive cold services. The proposed multi-stage superstructure allows the increment of the existing heat transfer area, as well as the use of new equipment for both heat exchange and pressure manipulation. The pressure recovery of streams is carried out simultaneously with the HEN design, such that the process conditions (streams pressure and temperature) are variables of optimization. The mathematical model is formulated using generalized disjunctive programming (GDP) and is optimized via mixed-integer nonlinear programming (MINLP), through the minimization of the retrofit total annualized cost, considering the turbine and compressor coupling with a helper motor. Three case studies are performed to assess the accuracy of the developed approach, including a real industrial example related to liquefied natural gas (LNG) production. The results show that the pressure recovery of streams is efficient for energy savings and, consequently, for decreasing the HEN retrofit total cost especially in sub-ambient processes.
Resumo:
This communication develops the process of interventions of the Renaissance fortress of a new plant built in 1554–57 in Santa Pola. It is one of the earliest examples built with reference to military architecture theoretical treaties (XV–XVI) and best preserved. The study runs its own story from its initial military use, through the use of civil equipment until the final cultural and Museum Center. First, the project of Italian origin is examined and its use as barracks for troops for a duration of three centuries (1557–1850), pointing out the architectural constants of war machinery in a defense position and its origin as a rainwater collector and cistern: a perfect square with two bastions in which a plan of the uprising is preserved (1778). Secondly, we study the changes in the mentioned architecture throughout a century and a half (1850–1990) after its change of ownership (from the state to the municipality), and as a result of the new use as a city hall and public endowment: a market and health and leisure centre, which meant the demolition of defensive elements and the opening up to the outside of the inner parade ground. And thirdly, the new transfer of the municipal offices brings in the beginning of a project of transformations (1990–2015) that retrieves the demolished elements at the same time as it assigns the entire fort for a cultural centre: exhibition, research and history museum, promoting the identity between the citizens and the building which stands in the foundations of their city. The conclusions take us through an interesting route that goes from the approach of defensive tactics, its use as administrative headquarters to the current cultural policy of preservation. In addition, all the known plans of the fort are recovered (of military, civil and cultural use), some unpublished, as well as the project of the North wing that has guided the last operation and which has been set as a pattern of reference.
Resumo:
Trabalho Final do Curso de Mestrado Integrado em Medicina, Faculdade de Medicina, Universidade de Lisboa, 2014
Resumo:
"United States Atomic Energy Commission Contract No. AT (49-6)-916."
Resumo:
"United States Atomic Energy Commission Contract No. AT (49-6)-916."
Resumo:
"United States Atomic Energy Commission Contract No. AT (49-6)-916."
Resumo:
"United States Atomic Energy Commission Contract No. AT (49-6)-916."