986 resultados para Railroads Train dispatching


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a train movement model with fixed runtime that can be employed to find feasible control strategies for a single train along an inter-city railway line. The objective of the model is to minimize arrival delays at each station along railway lines. However, train movement is a typical nonlinear problem for complex running environments and different requirements. A heuristic algorithm is developed to solve the problem in this paper and the simulation results show that the train could overcome the disturbance from train delay and coordinates the operation strategies to sure punctual arrival of trains at the destination. The developed algorithm can also be used to evaluate the running reliability of trains in scheduled timetables.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Planning on utilization of train-set is one of the key tasks of transport organization for passenger dedicated railway in China. It also has strong relationships with timetable scheduling and operation plans at a station. To execute such a task in a railway hub pooling multiple railway lines, the characteristics of multiple routing for train-set is discussed in term of semicircle of train-sets' turnover. In programming the described problem, the minimum dwell time is selected as the objectives with special derive constraints of the train-set's dispatch, the connecting conditions, the principle of uniqueness for train-sets, and the first plus for connection in the same direction based on time tolerance σ. A compact connection algorithm based on time tolerance is then designed. The feasibility of the model and the algorithm is proved by the case study. The result indicates that the circulation model and algorithm about multiple routing can deal with the connections between the train-sets of multiple directions, and reduce the train's pulling in or leaving impact on the station's throat.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In open railway markets, coordinating train schedules at an interchange station requires negotiation between two independent train operating companies to resolve their operational conflicts. This paper models the stakeholders as software agents and proposes an agent negotiation model to study their interaction. Three negotiation strategies have been devised to represent the possible objectives of the stakeholders, and they determine the behavior in proposing offers to the proponent. Empirical simulation results confirm that the use of the proposed negotiation strategies lead to outcomes that are consistent with the objectives of the stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Railway timetabling is an important process in train service provision as it matches the transportation demand with the infrastructure capacity while customer satisfaction is also considered. It is a multi-objective optimisation problem, in which a feasible solution, rather than the optimal one, is usually taken in practice because of the time constraint. The quality of services may suffer as a result. In a railway open market, timetabling usually involves rounds of negotiations among a number of self-interested and independent stakeholders and hence additional objectives and constraints are imposed on the timetabling problem. While the requirements of all stakeholders are taken into consideration simultaneously, the computation demand is inevitably immense. Intelligent solution-searching techniques provide a possible solution. This paper attempts to employ a particle swarm optimisation (PSO) approach to devise a railway timetable in an open market. The suitability and performance of PSO are studied on a multi-agent-based railway open-market negotiation simulation platform.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Train delay is one of the most important indexes to evaluate the service quality of the railway. Because of the interactions of movement among trains, a delayed train may conflict with trains scheduled on other lines at junction area. Train that loses conflict may be forced to stop or slow down because of restrictive signals, which consequently leads to the loss of run-time and probably enlarges more delays. This paper proposes a time-saving train control method to recover delays as soon as possible. In the proposed method, golden section search is adopted to identify the optimal train speed at the expected time of restrictive signal aspect upgrades, which enables the train to depart from the conflicting area as soon as possible. A heuristic method is then developed to attain the advisory train speed profile assisting drivers in train control. Simulation study indicates that the proposed method enables the train to recover delays as soon as possible in case of disturbances at railway junctions, in comparison with the traditional maximum traction strategy and the green wave strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, a three-dimensional nonlinear rigid body model has been developed for the investigation of the crashworthiness of a passenger train using the multibody dynamics approach. This model refers to a typical design of passenger cars and train constructs commonly used in Australia. The high-energy and low-energy crush zones of the cars and the train constructs are assumed and the data are explicitly provided in the paper. The crash scenario is limited to the train colliding on to a fixed barrier symmetrically. The simulations of a single car show that this initial design is only applicable for the crash speed of 35 km/h or lower. For higher speeds (e.g. 140 km/h), the crush lengths or crush forces or both the crush zone elements will have to be enlarged. It is generally better to increase the crush length than the crush force in order to retain the low levels of the longitudinal deceleration of the passenger cars.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The reliability of urban passenger trains is a critical performance measure for passenger satisfaction and ultimately market share. A delay to one train in a peak period can have a severe effect on the schedule adherence of other trains. This paper presents an analytically based model to quantify the expected positive delay for individual passenger trains and track links in an urban rail network. The model specifically addresses direct delay to trains, knock-on delays to other trains, and delays at scheduled connections. A solution to the resultant system of equations is found using an iterative refinement algorithm. Model validation, which is carried out using a real-life suburban train network consisting of 157 trains, shows the model estimates to be on average within 8% of those obtained from a large scale simulation. Also discussed, is the application of the model to assess the consequences of increased scheduled slack time as well as investment strategies designed to reduce delay.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Travelling by public transport is usually regarded as boring and uninteresting. Refraining from talking to the stranger next to you may be due to limitations that are self-imposed and further corroborated by social expectations and cultural norms that govern behaviour in public space. Our design research into passenger interactions on board of urban commuter trains has informed the development of the TrainRoulette prototype – a mobile app for situated, real-time chats between train passengers. We study the impact of our design intervention on shaping perceptions of the train journey experience. Moreover, we are interested in the implications of such ICT-mediated interactions within train journeys for stimulating social offline interactions and new forms of passenger engagement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Constructing train schedules is vital in railways. This complex and time consuming task is however made more difficult by additional requirements to make train schedules robust to delays and other disruptions. For a timetable to be regarded as robust, it should be insensitive to delays of a specified level and its performance with respect to a given metric, should be within given tolerances. In other words the effect of delays should be identifiable and should be shown to be minimal. To this end, a sensitivity analysis is proposed that identifies affected operations. More specifically a sensitivity analysis for determining what operation delays cause each operation to be affected is proposed. The information provided by this analysis gives another measure of timetable robustness and also provides control information that can be used when delays occur in practice. Several algorithms are proposed to identify this information and they utilise a disjunctive graph model of train operations. Upon completion the sets of affected operations can also be used to define the impact of all delays without further disjunctive graph evaluations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Modern trains with different axle configurations, speeds and loads are used in railway networks. As a result, one of the most important questions of the mangers involved in bridge managements systems (BMS) is how these changes affect the structural behavior of the critical components of the railway bridges. Although researchers have conducted, many investigations on the dynamic effects of the moving loads on bridges, the influence of the changes in the speed of the train on the demand by capacity ratios of the different critical components of the bridge have not yet been properly studied. This study is important, because different components with different capacities and roles for carrying loads in the structure may be affected differently. To investigate the above phenomenon in this research, a structural model of a simply supported bridge is developed. It will be verified that the dynamic behavior of this bridge is similar to a group of railway bridges in Australia. Demand by capacity ratios of the critical components of the bridge, when it is subjected to a train load with different speeds will be calculated. The results show that the effect of increase or decrease of speed should not be underestimated. The outcome is very significant as it is contrary to what is currently expected, i.e. by reducing the speed of the train, the demand by capacity ratio of components may increase and make the bridge unsafe for carrying live load.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, and elsewhere, the movement of trains on long-haul rail networks is usually planned in advance. Typically, a train plan is developed to confirm that the required train movements and track maintenance activities can occur. The plan specifies when track segments will be occupied by particular trains and maintenance activities. On the day of operation, a train controller monitors and controls the movement of trains and maintenance crews, and updates the train plan in response to unplanned disruptions. It can be difficult to predict how good a plan will be in practice. The main performance indicator for a train service should be reliability - the proportion of trains running the service that complete at or before the scheduled time. We define the robustness of a planned train service to be the expected reliability. The robustness of individual train services and for a train plan as a whole can be estimated by simulating the train plan many times with random, but realistic, perturbations to train departure times and segment durations, and then analysing the distributions of arrival times. This process can also be used to set arrival times that will achieve a desired level of robustness for each train service.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australian authorities have set ambitious policy objectives to shift Australia’s current transport profile of heavy reliance on private motor cars to sustainable modes. Improving accessibility of public transport is a central component of that objective. Past studies on accessibility to public transport focus on walking time and/or waiting time. However, travellers’ perceptions of the interface leg journeys may depend not only on these direct and tangible factors but also on social and psychological factors. This paper extends previous research that identified five salient perspectives of rail access by means of a statement sorting activity and cluster analysis with a small sample of rail passengers in three Australian cities (Zuniga et al, 2013). This study collects a new data set including 144 responses from Brisbane and Melbourne to an online survey made up of a Likert-scaled statement sorting exercise and questionnaire. It employs factor analysis to examine the statement rankings and uncovers seven underlying factors in the exploratory manner, i.e., station, safety, access, transfer, service attitude, traveler’s physical activity levels, and environmental concern. Respondents from groups stratified by rail use frequency are compared in terms of their scores of those factors. Findings from this study indicate a need to re-conceptualize accessibility to intra-urban rail travel in agreement with current policy agenda, and to target behavioral intervention to multiple dimensions of accessibility influencing passengers’ travel choices. Arguments in this paper are not limited to intra-urban rail transit, but may also be relevant to public transport in general.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australian authorities have set ambitious policy objectives to shift Australia’s current transport profile of heavy reliance on private motor cars to sustainable modes. Improving accessibility of public transport is a central component of that objective. Past studies on accessibility to public transport focus on walking time and/or waiting time. However, travellers’ perceptions of the interface leg journeys may depend not only on these direct and tangible factors but also on social and psychological factors. This paper extends previous research that identified five salient perspectives of rail access by means of a statement sorting activity and cluster analysis with a small sample of rail passengers in three Australian cities (Zuniga et al, 2013). This study collects a new data set including 144 responses from Brisbane and Melbourne to an online survey made up of a Likert-scaled statement sorting exercise and questionnaire. It employs factor analysis to examine the statement rankings and uncovers seven underlying factors in the exploratory manner, i.e., station, safety, access, transfer, service attitude, traveler’s physical activity levels, and environmental concern. Respondents from groups stratified by rail use frequency are compared in terms of their scores of those factors. Findings from this study indicate a need to re-conceptualize accessibility to intra-urban rail travel in agreement with current policy agenda, and to target behavioral intervention to multiple dimensions of accessibility influencing passengers’ travel choices. Arguments in this paper are not limited to intra-urban rail transit, but may also be relevant to public transport in general.