974 resultados para Project outcome
Resumo:
Delay in the delivery of manufacturing projects is a major problem in manufacturing industries. This research investigates the factors that influence the lead time of new projects in manufacturing organisations. Employing a questionnaire survey and interview methodologies, this study collected data from five leading manufacturing organisations as well as their suppliers and contractors in Saudi Arabia to examine what, how and why the new project implementation delay occurs. Results show that the main factors contributing to manufacturing delays are related to people and material. On the other hand, social, political and cultural factors were the least significant factors as per the outcome of this study. Views of manufacturers, suppliers and contractors regarding causes of delays have also been analysed.
Resumo:
There is a growing awareness of the high levels of psychological distress being experienced by law students and the practising profession in Australia. In this context, a Threshold Learning Outcome (TLO) on self-management has been included in the six TLOs recently articulated as minimum learning outcomes for all Australian graduates of the Bachelor of Laws degree (LLB). The TLOs were developed during 2010 as part of the Australian Learning and Teaching Council’s (ALTC’s) project funded by the Australian Government to articulate ‘Learning and Teaching Academic Standards’. The TLOs are the result of a comprehensive national consultation process led by the ALTC’s Discipline Scholars: Law, Professors Sally Kift and Mark Israel.1 The TLOs have been endorsed by the Council of Australian Law Deans (CALD) and have received broad support from members of the judiciary and practising profession, representative bodies of the legal profession, law students and recent graduates, Legal Services Commissioners and the Law Admissions Consultative Committee. At the time of writing, TLOs for the Juris Doctor (JD) are also being developed, utilising the TLOs articulated for the LLB as their starting point but restating the JD requirements as the higher order outcomes expected of graduates of a ‘Masters Degree (Extended)’, this being the award level designation for the JD now set out in the new Australian Qualifications Framework.2 As Australian law schools begin embedding the learning, teaching and assessment of the TLOs in their curricula, and seek to assure graduates’ achievement of them, guidance on the implementation of the self-management TLO is salient and timely.
Resumo:
In the last five years the Safety Institute of Australia Limited (SIA) has developed and implemented a number of strategies to gain professional recognition for the ‘generalist occupational health and safety (OHS) professional’ in Australia and internationally. Despite a considerable amount of work by the SIA aimed at gaining professional status, there does not appear to have been any published debate or reflection about how the drive for professionalism (the ‘professional project’) will contribute to the prevention of occupational disease and injury. Professionalisation has been promoted as a sign of maturity for the SIA and as an unquestionably good outcome, as it has been assumed that professionalisation will provide unmitigated benefits for workplace health and safety. The aim of this paper is to critically reflect on the processes of professionalisation (the professional project) and discuss the ways in which this project may shape the field of occupational health and safety.
Resumo:
The Australian Learning and Teaching Council (ALTC) Discipline Scholars for Law, Professors Sally Kift and Mark Israel, articulated six Threshold Learning Outcomes (TLOs) for the Bachelor of Laws degree as part of the ALTC’s 2010 project on Learning and Teaching Academic Standards. One of these TLOs promotes the learning, teaching and assessment of self-management skills in Australian law schools. This paper explores the concept of self-management and how it can be relevantly applied in the first year of legal education. Recent literature from the United States (US) and Australia provides insights into the types of issues facing law students, as well as potential antidotes to these problems. Based on these findings, I argue that designing a pedagogical framework for the first year law curriculum that promotes students’ connection with their intrinsic interests, values, motivations and purposes will facilitate student success in terms of their personal well-being, ethical dispositions and academic engagement.
Resumo:
The Queensland Department of Transport and Main Roads (TMR) required an evaluation framework for the Queensland Alcohol Ignition Interlock Program (AIIP). The objective of this project was to develop a framework to evaluate the AIIP in terms of its effect on road safety outcomes.
Resumo:
While anecdotal evidence indicates financial advice affects consumers’ financial well-being, this research project is motivated by the absence of empirically-grounded research relating to the extent to which, and, importantly, how, financial planning advice contributes to broader client well-being. Accordingly, the aim of this project is to establish how the quality of financial planning advice can be optimised to add value, not only to clients’ financial situation, but also to broader aspects of their well-being. This broader construct of well-being captures a range of process and outcome factors that map to concepts of security, control, choice, mastery, and life satisfaction (Irving, 2012; Gallery, Gallery, Irving & Newton, 2011; Irving, Gallery, and Gallery, 2009). Financial planning is commonly purported to confer not only tangible benefits, but also intangible benefits, such as increased security and peace of mind that are considered as important, if not more important, than material outcomes. Such claims are intuitively appealing; however, little empirical evidence exists for the notion that engaging with a financial planner or adviser promotes peace of mind, feelings of security, and expands choices and possibilities. Nor is there evidence signalling what mechanisms might underpin such client benefits. In addressing this issue, we examine the financial planning advice (including financial product advice) provided to retail clients, and consider the short- and longer-term impacts on clients’ financial satisfaction and broader well-being. To this end, we examine both process (e.g., how financial planning advice is given) and outcome (e.g., financial situation) effects.
Resumo:
This project examines procurement of creative services in a bureaucratic setting and proposes alternative procedures that better negotiate the tensions between creative and bureaucratised ways of working. The outcome is a project procurement strategy called 'Creative Practice Enabled Procurement' and a prototype industry toolkit 'It's Not Shopping! A Guide to Purchasing Innovation and Creativity'. The research is of benefit to managers and creative practitioners, especially those working in interpretive settings. The goal is to propagate better forms of creative procurement across government and private sectors by providing an evidence-based case for improved, practical alternatives.
Resumo:
A holistic consideration of innovation and associated activities is still very new to consulting engineering firms. This research will have benefits for both industry and academia. The final outcome of this research is a prioritised decision making innovation model that can be used by consulting engineering firms to make informed decisions by investing in appropriate innovation activities that positively impact project performance. This helps by using an informed approach towards investing rather than 'hit-and-miss' trialling.
Resumo:
The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.
Resumo:
This study is part of an ongoing collaborative bipolar research project, the Jorvi Bipolar Study (JoBS). The JoBS is run by the Department of Mental Health and Alcohol Research of the National Public Health Institute, Helsinki, and the Department of Psychiatry, Jorvi Hospital, Helsinki University Central Hospital (HUCH), Espoo, Finland. It is a prospective, naturalistic cohort study of secondary level care psychiatric in- and outpatients with a new episode of bipolar disorder (BD). The second report also included 269 major depressive disorder (MDD) patients from the Vantaa Depression Study (VDS). The VDS was carried out in collaboration with the Department of Psychiatry of the Peijas Medical Care District. Using the Mood Disorder Questionnaire (MDQ), all in- and outpatients at the Department of Psychiatry at Jorvi Hospital who currently had a possible new phase of DSM-IV BD were sought. Altogether, 1630 psychiatric patients were screened, and 490 were interviewed using a semistructured interview (SCID-I/P). The patients included in the cohort (n=191) had at intake a current phase of BD. The patients were evaluated at intake and at 6- and 18-month interviews. Based on this study, BD is poorly recognized even in psychiatric settings. Of the BD patients with acute worsening of illness, 39% had never been correctly diagnosed. The classic presentations of BD with hospitalizations, manic episodes, and psychotic symptoms lead clinicians to correct diagnosis of BD I in psychiatric care. Time of follow-up elapsed in psychiatric care, but none of the clinical features, seemed to explain correct diagnosis of BD II, suggesting reliance on cross- sectional presentation of illness. Even though BD II was clearly less often correctly diagnosed than BD I, few other differences between the two types of BD were detected. BD I and II patients appeared to differ little in terms of clinical picture or comorbidity, and the prevalence of psychiatric comorbidity was strongly related to the current illness phase in both types. At the same time, the difference in outcome was clear. BD II patients spent about 40% more time depressed than BD I patients. Patterns of psychiatric comorbidity of BD and MDD differed somewhat qualitatively. Overall, MDD patients were likely to have more anxiety disorders and cluster A personality disorders, and bipolar patients to have more cluster B personality disorders. The adverse consequences of missing or delayed diagnosis are potentially serious. Thus, these findings strongly support the value of screening for BD in psychiatric settings, especially among the major depressive patients. Nevertheless, the diagnosis must be based on a clinical interview and follow-up of mood. Comorbidity, present in 59% of bipolar patients in a current phase, needs concomitant evaluation, follow-up, and treatment. To improve outcome in BD, treatment of bipolar depression is a major challenge for clinicians.
Resumo:
The project consisted of two long-term follow-up studies of preterm children addressing the question whether intrauterine growth restriction affects the outcome. Assessment at 5 years of age of 203 children with a birth weight less than 1000 g born in Finland in 1996-1997 showed that 9% of the children had cognitive impairment, 14% cerebral palsy, and 4% needed a hearing aid. The intelligence quotient was lower (p<0.05) than the reference value. Thus, 20% exhibited major, 19% minor disabilities, and 61% had no functional abnormalities. Being small for gestational age (SGA) was associated with sub-optimal growth later. In children born before 27 gestational weeks, the SGA had more neuropsychological disabilities than those appropriate for gestational age (AGA). In another cohort with birth weight less than 1500 g assessed at 5 years of age, echocardiography showed a thickened interventricular septum and a decreased left ventricular end-diastolic diameter in both SGA and AGA born children. They also had a higher systolic blood pressure than the reference. Laser-Doppler flowmetry showed different endothelium-dependent and -independent vasodilation responses in the AGA children compared to those of the controls. SGA was not associated with cardio-vascular abnormalities. Auditory event-related potentials (AERPs) were recorded using an oddball paradigm with frequency deviants (standard tone 500 Hz and deviant 750-Hz with 10% probability). At term, the P350 was smaller in SGA and AGA infants than in controls. At 12 months, the automatic change detection peak (mismatch negativity, MMN) was observed in the controls. However, the pre-term infants had a difference positivity that correlated with their neurodevelopment scores. At 5 years of age, the P1-deflection, which reflects primary auditory processing, was smaller, and the MMN larger in the preterm than in the control children. Even with a challenging paradigm or a distraction paradigm, P1 was smaller in the preterm than in the control children. The SGA and AGA children showed similar AERP responses. Prematurity is a major risk factor for abnormal brain development. Preterm children showed signs of cardiovascular abnormality suggesting that prematurity per se may carry a risk for later morbidity. The small positive amplitudes in AERPs suggest persisting altered auditory processing in the preterm in-fants.
Resumo:
“Advanced Watershed Science and Policy (ESSP 660)” is a graduate class taught in the Master of Science in Coastal and Watershed Science & Policy program at California State University Monterey Bay (CSUMB). In 2007, the class was taught in four 4-week modules, each focusing on a local watershed issue. This report is one outcome of one of those 4-week modules taught in the fall 2007 session. (Document contains 32 pages)
Resumo:
This paper suggests a possible framework for the encapsulation of the decision making process for the Waterime project. The final outcome maybe a computerised model, but the process advocated is not prescriptive, and involves the production of a "paper model" as mediating representation between the knowledge acquired and any computerised system. This paper model may suffice in terms of the project's goals.
Resumo:
Objectives To investigate the effects of Helicobacter pylori infection and its eradication on heartburn and gastro-oesophageal reflux. Design Cross sectional study, followed by a randomised placebo controlled trial. Setting Seven general practices in Bristol, England. Participants 10 537 people, aged 20-59 years, with and without H pylori infection (determined by the 13C-urea breath test). Main outcome measures Prevalence of heartburn and gastro-oesophageal acid reflux at baseline and two years after treatment to eradicate H pylori infection. Results At baseline, H pylori infection was associated with increased prevalence of heartburn (odds ratio 1.14, 95% confidence interval 1.05 to 1.23) but not reflux (1.05, 0.97 to 1.14). In participants with H pylori infection, active treatment had no effect on the overall prevalence of heartburn (0.99, 0.88 to 1.12) or reflux (1.04, 0.91 to 1.19) and did not improve pre-existing symptoms of heartburn or reflux. Conclusions H pylori infection is associated with a slightly increased prevalence of heartburn but not reflux. Treatment to eradicate H pylori has no net benefit in patients with heartburn or gastro-oesophageal reflux