731 resultados para Project Quality, Continuous Improvement, Stakeholder Management, Construction Project Delivery
Resumo:
We demonstrate that stakeholder-oriented multi-criteria analysis (MCA) can adequately address a variety of sustainable development dilemmas in decision-making, especially when applied to complex project evaluations involving multiple objectives and multiple stakeholder groups. Such evaluations are typically geared towards satisfying simultaneously private economic goals, broader social objectives and environmental targets. We show that, under specific conditions, a variety of stakeholder-oriented MCA approaches may be able to contribute substantively to the resolution or improved governance of societal conflicts and the pursuit of the public good in the form of sustainable development. We contrast the potential usefulness of these stakeholder-oriented approaches – in terms of their ability to contribute to sustainable development – with more conventional MCA approaches and social cost–benefit analysis.
Inventory parameter management and focused continuous improvement for repetitive batch manufacturers
Resumo:
What this thesis proposes is a methodology to assist repetitive batch manufacturers in the adoption of certain aspects of the Lean Production principles. The methodology concentrates on the reduction of inventory through the setting of appropriate batch sizes, taking account of the effect of sequence dependent set-ups and the identification and elimination of bottlenecks. It uses a simple Pareto and modified EBQ based analysis technique to allocate items to period order day classes based on a combination of each item's annual usage value and set-up cost. The period order day classes the items are allocated to are determined by the constraints limits in the three measured dimensions, capacity, administration and finance. The methodology overcomes the limitations associated with MRP in the area of sequence dependent set-ups, and provides a simple way of setting planning parameters taking this effect into account by concentrating on the reduction of inventory through the systematic identification and elimination of bottlenecks through set-up reduction processes, so allowing batch sizes to reduce. It aims to help traditional repetitive batch manufacturers in a route to continual improvement by: Highlighting those areas where change would bring the greatest benefits. Modelling the effect of proposed changes. Quantifying the benefits that could be gained through implementing the proposed changes. Simplifying the effort required to perform the modelling process. It concentrates on increasing flexibility through managed inventory reduction through rationally decreasing batch sizes, taking account of sequence dependent set-ups and the identification and elimination of bottlenecks. This was achieved through the development of a software modelling tool, and validated through a case study approach.
Resumo:
With the advent of globalisation companies all around the world must improve their performance in order to survive. The threats are coming from everywhere, and in different ways, such as low cost products, high quality products, new technologies, and new products. Different companies in different countries are using various techniques and using quality criteria items to strive for excellence. Continuous improvement techniques are used to enable companies to improve their operations. Therefore, companies are using techniques such as TQM, Kaizen, Six-Sigma, Lean Manufacturing, and quality award criteria items such as Customer Focus, Human Resources, Information & Analysis, and Process Management. The purpose of this paper is to compare the use of these techniques and criteria items in two countries, Mexico and the United Kingdom, which differ in culture and industrial structure. In terms of the use of continuous improvement tools and techniques, Mexico formally started to deal with continuous improvement by creating its National Quality Award soon after the Americans began the Malcolm Baldrige National Quality Award. The United Kingdom formally started by using the European Quality Award (EQA), modified and renamed as the EFQM Excellence Model. The methodology used in this study was to undertake a literature review of the subject matter and to study some general applications around the world. A questionnaire survey was then designed and a survey undertaken based on the same scale, about the same sample size, and the about the same industrial sector within the two countries. The survey presents a brief definition of each of the constructs to facilitate understanding of the questions. The analysis of the data was then conducted with the assistance of a statistical software package. The survey results indicate both similarities and differences in the strengths and weaknesses of the companies in the two countries. One outcome of the analysis is that it enables the companies to use the results to benchmark themselves and thus act to reinforce their strengths and to reduce their weaknesses.
Resumo:
This paper is based upon the findings of a CIMA research project into the way which corporate performance is affected by the performance measurement system adopted. It compares and contrasts the techniques in use in a sample of large companies that use a variety of techniques. We have classified these techniques into 3 types: • Value based management techniques • Stakeholder management techniques • Traditional accounting techniques. The analysis traces the interactions between corporate objectives, decision making criteria, performance measurement systems, and executive incentive schemes in order to develop an understanding of the effects of such techniques upon corporate performance. This paper seeks to provide some answers to the following two questions: • What approach leads to superior performance for a firm? • What is different between these approaches when they are used in practice, as distinct from theory? In doing so we have drawn upon both contingency theory and sociobiology theory to develop a framework for understanding the relationship between the choke of performance measurement system and the resulting performance.
Resumo:
Trenchless methods have been considered to be a viable solution for pipeline projects in urban areas. Their applicability in pipeline projects is expected to increase with the rapid advancements in technology and emerging concerns regarding social costs related to trenching methods. Selecting appropriate project delivery system (PDS) is a key to the success of trenchless projects. To ensure success of the project, the selected project delivery should be tailored to trenchless project specific characteristics and owner needs, since the effectiveness of project delivery systems differs based on different project characteristics and owners requirements. Since different trenchless methods have specific characteristics such rate of installation, lengths of installation, and accuracy, the same project delivery systems may not be equally effective for different methods. The intent of this paper is to evaluate the appropriateness of different PDS for different trenchless methods. PDS are examined through a structured decision-making process called Fuzzy Delivery System Selection Model (FDSSM). The process of incorporating the impacts of: (a) the characteristics of trenchless projects and (b) owners’ needs in the FDSSM is performed by collecting data using questionnaires deployed to professionals involved in the trenchless industry in order to determine the importance of delivery systems selection attributes for different trenchless methods, and then analyzing this data. The sensitivity of PDS rankings with respect to trenchless methods is considered in order to evaluate whether similar project delivery systems are equally effective in different trenchless methods. The effectiveness of PDS with respect to attributes is defined as follows: a project delivery system is most effective with respect to an attribute (e.g., ability to control growth in costs ) if there is no project delivery system that is more effective than that PDS. The results of this study may assist trenchless project owners to select the appropriate PDS for the trenchless method selected.
Resumo:
International audience
Resumo:
The purpose of this research project is to investigate project delivery as it relates to construction projects to help support the Department of Transportation's vision. The project delivery goals of the Agency as it relates to this research include: Fifty percent of construction projects are completed on schedule ; Ninety-five percent of projects are closed out within 270 days ; Seventy-five percent of construction projects are authorized on schedule. The goals of this project are to determine what factors contribute to unsuccessful project delivery and determine how these factors can be improved. This project will mainly investigate Construction roles during the Preconstruction phase of the project as well as examine the project during construction and identify areas that prohibit effective and timely project delvery.
Resumo:
To maintain or achieve competitiveness and profitability, a manufacturing firm or enterprise must respond to a range of challenges, including rapid improvements in technology; declining employment and output; globalisation of markets and environmental requirements. In addition, substantial changes in government policy have had important impacts in many countries, as have the increasing levels of global trade. Manufacturing enterprises need to have a clear understanding of what their customers want and why customers purchase their products rather than purchase from their competitors. They need to fully understand the aims of the business in terms of its customers, market segments, product attributes, geographical markets and performance. Continuous Improvement (CI) methods have become widely adopted and regarded as providing an important component of increased company competitiveness. This article examines the extent to which continuous improvement activities have contributed to the different areas of business performance.
Resumo:
This research is focused on realizing productivity benefits for the delivery of transport infrastructure in the Australian construction industry through the use of building information modeling (BIM), virtual design and construction (VDC) and integrated project delivery (IPD). Specific objectives include: (I) building an understanding of the institutional environment, business systems and support mechanisms (e.g., training and skilling) which impact on the uptake of BIM/VDC; (II) gathering data to undertake a cross-country analysis of these environments; and (III) providing strategic and practical outcomes to guide the uptake of such processes in Australia. Activities which will inform this research include a review of academic literature and industry documentation, semi-formal interviews in Australia and Sweden, and a cross-country comparative analysis to determine factors affecting uptake and associated productivity improvements. These activities will seek to highlight the gaps between current-practice and best-practice which are impacting on widespread adoption of BIM/VDC and IPD. Early findings will be discussed with intended outcomes of this research being used to: inform a national public procurement strategy; provide guidelines for new contractual frameworks; and contribute to closing skill gaps. Keywords: building information modeling (BIM); virtual design and construction (VDC); integrated project delivery (IPD); transport infrastructure; Australia; procurement
Resumo:
With the increasing competitiveness in global markets, many developing nations are striving to constantly improve their services in search for the next competitive edge. As a result, the demand and need for Business Process Management (BPM) in these regions is seeing a rapid rise. Yet there exists a lack of professional expertise and knowledge to cater to that need. Therefore, the development of well-structured BPM training/ education programs has become an urgent requirement for these industries. Furthermore, the lack of textbooks or other self-educating material, that go beyond the basics of BPM, further ratifies the need for case based teaching and related cases that enable the next generation of professionals in these countries. Teaching cases create an authentic learning environment where complexities and challenges of the ‘real world’ can be presented in a narrative, enabling students to evolve crucial skills such as problem analysis, problem solving, creativity within constraints as well as the application of appropriate tools (BPMN) and techniques (including best practices and benchmarking) within richer and real scenarios. The aim of this paper is to provide a comprehensive teaching case demonstrating the means to tackle any developing nation’s legacy government process undermined by inefficiency and ineffectiveness. The paper also includes thorough teaching notes The article is presented in three main parts: (i) Introduction - that provides a brief background setting the context of this paper, (ii) The Teaching Case, and (iii) Teaching notes.
Resumo:
© Springer International Publishing Switzerland 2015. Making sound asset management decisions, such as whether to replace or maintain an ageing underground water pipe, are critical to ensure that organisations maximise the performance of their assets. These decisions are only as good as the data that supports them, and hence many asset management organisations are in desperate need to improve the quality of their data. This chapter reviews the key academic research on data quality (DQ) and Information Quality (IQ) (used interchangeably in this chapter) in asset management, combines this with the current DQ problems faced by asset management organisations in various business sectors, and presents a classification of the most important DQ problems that need to be tackled by asset management organisations. In this research, eleven semi structured interviews were carried out with asset management professionals in a range of business sectors in the UK. The problems described in the academic literature were cross checked against the problems found in industry. In order to support asset management professionals in solving these problems, we categorised them into seven different DQ dimensions, used in the academic literature, so that it is clear how these problems fit within the standard frameworks for assessing and improving data quality. Asset management professionals can therefore now use these frameworks to underpin their DQ improvement initiatives while focussing on the most critical DQ problems.
Resumo:
Purpose – The purpose of this paper is to propose a generic model of Integrated Management System of Quality, Environment and Safety (IMS-QES) that can be adapted and progressively to assimilate various Management Systems, of which highlights: ISO 9001 for Quality; ISO 14001 for Environment; OHSAS 18001 for Occupational Health and Safety. Design/methodology/approach – The model was designed in the real environment of a Portuguese Organization and 160 employees were surveyed. The rate response was equal to 86 percent. The conceived model was implemented in a first phase for the integration of Quality, Environment and Safety Management Systems. Findings – Among the main findings of the survey the paper highlights: the elimination of conflicts between individual systems with resources optimization; creation of added value to the business by eliminating several types of wastes; the integrated management of sustainability components in a global market; the improvement of partnerships with suppliers of goods and services; reducing the number of internal and external audits. Originality/value – This case study is one of the first Portuguese empirical researches about IMS-QES and the paper believes that it can be useful in the creation of a Portuguese guideline for integration, namely the Quality Management Systems; Environmental Management Systems and Occupational Health and Safety Management Systems among others.
Resumo:
This article intends to show the relationships between quality practices and the process of organizational learning. When we look at the literature about programs of continuous improvement we see that theoreticians consider that the process of organizational learning is a superior stage in the quality culture adopted by companies. To investigate this possibility, we put together a series of indicators taken from classic authors who have written about organizational learning. Adopting a multiple methodology, we applied these indicators to two plants belonging to the Nestlé food product company which have introduced continuous improvement programs over the last two years.