991 resultados para Programs for improvement
Resumo:
BACKGROUND: In Switzerland, intravenous drug use (IDU) accounts for 80% of newly acquired hepatitis C virus (HCV) infections. Early HCV treatment has the potential to interrupt the transmission chain and reduce morbidity/mortality due to decompensated liver cirrhosis and hepatocellular carcinoma. Nevertheless, patients in drug substitution programs are often insufficiently screened and treated. OBJECTIVE/METHODS: With the aim to improve HCV management in IDUs, we conducted a cross sectional chart review in three opioid substitution programs in St. Gallen (125 methadone and 71 heroin recipients). Results were compared with another heroin substitution program in Bern (202 patients) and SCCS/SHCS data. RESULTS: Among the methadone/heroin recipients in St. Gallen, diagnostic workup of HCV was better than expected: HCV/HIV-status was unknown in only 1% (2/196), HCV RNA was not performed in 9% (13/146) of anti-HCV-positives and the genotype missing in 15% (12/78) of HCV RNA-positives. In those without spontaneous clearance (two thirds), HCV treatment uptake was 23% (21/91) (HIV-: 29% (20/68), HIV+: 4% (1/23)), which was lower than in methadone/heroin recipients and particularly non-IDUs within the SCCS/SHCS, but higher than in the, mainly psychiatrically focussed, heroin substitution program in Bern (8%). Sustained virological response (SVR) rates were comparable in all settings (overall: 50%, genotype 1: 35-40%, genotype 3: two thirds). In St. Gallen, the median delay from the estimated date of infection (IDU start) to first diagnosis was 10 years and to treatment was another 7.5 years. CONCLUSIONS: Future efforts need to focus on earlier HCV diagnosis and improvement of treatment uptake among patients in drug substitution programs, particularly if patients are HIV-co-infected. New potent drugs might facilitate the decision to initiate treatment.
Resumo:
Abstract OBJECTIVE Check the relationship between the users' contact time in educational programs and self-care and knowledge variables in diabetes mellitus. METHOD A longitudinal study with a quantitative approach with the participation, in the initial phase, of 263 users linked to Basic Health Units in Belo Horizonte, Brazil during the years 2012 and 2013. The data were collected with respect to the total contact time of the users' participation in the educational program as regards knowledge and self-care in acquired diabetes mellitus. The data were analyzed using the Student t-test for comparison of means, considering a 0.05 significance level. RESULTS The final sample included 151 users. The analysis showed that the improvement in self-care scores was statistically higher during an educational intervention of eight hours or more (p-value <0.05). In relation to the scores for knowledge, there was a statistically significant improvement at the end of the educational program. It was not possible to identify a value for the contact time from which there was an increase in mean scores for the ability of knowledge. CONCLUSION To improve the effectiveness of the promotion of skills related to knowledge and self-care in diabetes mellitus, it is necessary to consider the contact time as a relevant factor of the educational program.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 USC. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s (Iowa DOT) authority to act concerning matters related to transportation, federal-aid expenditures and approvals of Metropolitan Planning Organizations’ (MPOs) Transportation Improvements Programs (TIPs) have been provided in past STIP’s and can be provided again upon request. The projects identified within the 2010-2013 STIP are divided into two groups. Projects proposed for funding from FHWA programs are shown first. FTA programs follow. Maps are included that identify locations of Iowa DOT District Planners, Metropolitan Planning Organizations (MPOs), Regional Planning affiliations (RPAs), and transit systems.
Resumo:
BACKGROUND: Loss of balance confidence is a frequent condition that affects 20-75% of community-dwelling older persons. Although a recent fall is a common trigger, loss of balance confidence also appears independent of previous experience with falls. Maintaining or improving balance confidence is important to avoid unnecessary, self-imposed restrictions of activity and subsequent disability. Holding another person's hand or using an assistive device while walking are simple interventions that are used naturally to address poor balance confidence in daily life. However, more complex interventions have also been developed and tested to achieve more sustained improvement in balance confidence. OBJECTIVES: This review describes interventions that have been tested to improve balance confidence in older community-dwelling persons. METHODS: Based on 2 recent systematic reviews, an additional search for literature was performed to update current information on interventions aiming at balance confidence improvement. Interventions were classified as those directly aimed at increasing balance confidence or not, and further stratified into those using monofactorial or multifactorial approaches. RESULTS: A total of 46 randomized controlled trials were identified. Five of the 8 interventions that directly targeted balance confidence showed benefits. Among those, multicomponent behavioral group interventions provided the most robust evidence of benefits in improving balance confidence and in decreasing activity avoidance. Among interventions not directly aiming at balance confidence improvement (11/21 studies with benefits), exercise (including tai chi) appears as the most promising monofactorial intervention. Nine of the 17 multifactorial fall prevention programs showed an effect on balance confidence, exercise being a main component in 7 of these 9 studies. Interventions that targeted elderly persons reporting poor balance confidence and/or those at risk for falls seemed more likely to be beneficial. CONCLUSIONS: Positive and sometimes sustained improvement in balance confidence can be achieved by various interventions among community-dwelling elderly persons. The effect of these interventions on activity restriction associated with poor balance confidence have been less well studied, but some studies also suggest potential benefits.
Resumo:
In Switzerland there is a strong movement at a national policy level towards strengthening patient rights and patient involvement in health care decisions. Yet, there is no national programme promoting shared decision making. First decision support tools (prenatal diagnosis and screening) for the counselling process have been developed and implemented. Although Swiss doctors acknowledge that shared decision making is important, hierarchical structures and asymmetric physician-patient relationships are still prevailing. The last years have seen some promising activities regarding the training of medical students and the development of patient support programmes. Swiss direct democracy and the habit of consensual decision making and citizen involvement in general may provide a fertile ground for SDM development in the primary care setting.
Resumo:
BACKGROUND: In Switzerland, intravenous drug use (IDU) accounts for 80% of newly acquired hepatitis C virus (HCV) infections. Early HCV treatment has the potential to interrupt the transmission chain and reduce morbidity/mortality due to decompensated liver cirrhosis and hepatocellular carcinoma. Nevertheless, patients in drug substitution programs are often insufficiently screened and treated. OBJECTIVE/METHODS: With the aim to improve HCV management in IDUs, we conducted a cross sectional chart review in three opioid substitution programs in St. Gallen (125 methadone and 71 heroin recipients). Results were compared with another heroin substitution program in Bern (202 patients) and SCCS/SHCS data. RESULTS: Among the methadone/heroin recipients in St. Gallen, diagnostic workup of HCV was better than expected: HCV/HIV-status was unknown in only 1% (2/196), HCV RNA was not performed in 9% (13/146) of anti-HCV-positives and the genotype missing in 15% (12/78) of HCV RNA-positives. In those without spontaneous clearance (two thirds), HCV treatment uptake was 23% (21/91) (HIV-: 29% (20/68), HIV+: 4% (1/23)), which was lower than in methadone/heroin recipients and particularly non-IDUs within the SCCS/SHCS, but higher than in the, mainly psychiatrically focussed, heroin substitution program in Bern (8%). Sustained virological response (SVR) rates were comparable in all settings (overall: 50%, genotype 1: 35-40%, genotype 3: two thirds). In St. Gallen, the median delay from the estimated date of infection (IDU start) to first diagnosis was 10 years and to treatment was another 7.5 years. CONCLUSIONS: Future efforts need to focus on earlier HCV diagnosis and improvement of treatment uptake among patients in drug substitution programs, particularly if patients are HIV-co-infected. New potent drugs might facilitate the decision to initiate treatment.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. This five-year program documents $3.2 billion of highway and bridge construction projects on the primary road system using federal and state funding. Of that funding, a little over $500 million is available due to the passage of Senate File 257 in February 2015. As required by Senate File 257, this program includes a list of the critical highway and bridge projects funded with the additional revenue. As with other recent programs, there continues to be uncertainty in federal funding for roads and bridges. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire July 31, 2015. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able to provide funding at current levels. This could result in reduced federal funding reimbursement for projects already underway and/or full elimination of federal highway funding for new projects in federal fiscal year 2016. These two issues provide funding uncertainty with this program in fiscal year 2016 and beyond.
Resumo:
The objective of this study was to assess the impact of genetic breeding on grain yield, and to identify the physiological traits associated to the increment in yield and their related growth processes, for wheat cultivars grown in Southern Brazil, in the past five decades. Seven wheat cultivars released between 1940 and 1992, were compared for physiological aspects associated with grain yield. Grain yield, biological yield, biomass partitioning, harvest index and grain yield components were also determined. The number of grains per square meter was more affected by plant breeding and was better correlated with grain yield (r = 0.94, p<0.01) than with grain weight (r = -0.39ns). The higher number of grains per square meter was better correlated with the number of grains per spike in the modern cultivars than in the older ones. The genetic gain in grain yield was 44.9 kg ha-1 per year, reflecting important efforts of the breeding programs carried out in Southern Brazil. Grain yield changes, during the period of study, were better associated with biomass production (r = 0.78, p<0.01) than with harvest index (r = 0.65, p<0.01).
Resumo:
Objective. Collaborative quality improvement programs have been successfully used to manage chronic diseases in adults and acute lung complications in premature infants. Their effectiveness to improve pain management in acute care hospitals is currently unknown. The purpose of this study was to determine whether a collaborative quality improvement program implemented at hospital level could improve pain management and overall pain relief. Design.To assess the effectiveness of the program, we performed a before-after trial comparing patient's self-reported pain management and experience before and after program implementation. We included all adult patients hospitalized for more than 24 hours and discharged either to their home or to a nursing facility, between March 1, 2001 and March 31, 2001 (before program implementation) and between September 15, 2005 and October 15, 2005 (after program implementation). Setting.A teaching hospital of 2,096 beds in Geneva, Switzerland. Patients.All adult patients hospitalized for more than 24 hours and discharged between 1 to 31 March 2001 (before program) and 15 September to 15 October 2005 (after program implementation). Interventions.Implementation of a collaborative quality improvement program using multifaceted interventions (staff education, opinion leaders, patient education, audit, and feedback) to improve pain management at hospital level. Outcome Measures.Patient-reported pain experience, pain management, and overall hospital experience based on the Picker Patient Experience questionnaire, perceived health (SF-36 Health survey). Results.After implementation of the program only 2.3% of the patients reported having no pain relief during their hospital stay (vs 4.5% in 2001, P = 0.05). Among nonsurgical patients, improvements were observed for pain assessment (42.3% vs 27.9% of the patients had pain intensity measured with a visual analog scale, P = 0.012), pain management (staff did everything they could to help in 78.9% vs 67.9% of cases P = 0.003), and pain relief (70.4% vs 57.3% of patients reported full pain relief P = 0.008). In surgical patients, pain assessment also improved (53.7.3% vs 37.6%) as well as pain treatment. More patients received treatments to relieve pain regularly or intermittently after program implementation (95.1% vs 91.9% P = 0.046). Conclusion.Implementation of a collaborative quality improvement program at hospital level improved both pain management and pain relief in patients. Further studies are needed to determine the overall cost-effectiveness of such programs.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for the four federal fiscal years (FFY) 2016-2019. The 2016-2019 STIP was approved by FHWA and FTA on September 29, 2015. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures, and approvals of metropolitan planning organizations’ (MPOs) transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.