968 resultados para Processo decisorio


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este artigo pretende apresentar, de modo preliminar, uma exposição da teoria de James Buchanan sobre os temas relacionados a ação coletiva e as regras do processo decisorio no âmbito do Estado.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Ciência da Informação - FFC

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Ciência da Informação - FFC

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work has the purpose of demonstrating how to build a Disaster Recovery Plan. In order to achieve such objective, an adaptation of the PDCA method was applied. This plan aims resuming the IT operations as fast as possible after some kind of incident which result the stop of the services or activities. Besides serving as insurance for the continued functioning of the company’s activities, indeed your non-existence brings up risks of financial loss and threatens the company’s image. As to illustrate the functionality and validity, the method was applied in an IT department of an energy company. It was concluded that the plan was well elaborated living up to the purposes described in the objective section of this work and validating the project developed so far, having a percentage of 85% of the overall success of the systems tested

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The performance analysis based on indicators is an important tool when you want to check the economic and financial situation of a company. From the information provided by the ratios and their analysis, we have a better base for a decision making In this context , this study aims to analyse the financial and economic performance of a service providing company in the cleaning area, in the period between 2011 and 2012 , based on selected financial indicators, and basically calculated from the financial statements (Balance Sheet and Income Statement) , beyond effectuated the vertical and horizontal analysis of them. For the methodological procedures it was used a descriptive case of study and combined (quantitative and qualitative). The results revealed that the economic and financial situation of the company is healthy , once the results are considered satisfactory

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este trabalho estuda uma aplicação de um Método Multicritério (AHP do inglês Analytic Hierarchy Process) para analisar os problemas do congestionamento do tráfego aéreo nos aeroportos brasileiros, focando-se na ponte São Paulo-Rio de Janeiro. Primeiramente com um estudo em grupo mediante comparação em pares e posteriormente mediante um estudo individual com ratings. O objetivo deste trabalho será obter a alternativa mais adequada para os interesses do tráfego aéreo de Brasil

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In the current economic scenario of constant changes, industries seek to increase their profitability decreasing inventory levels. Maintenance and maintenance management, combined with the inventory management of spare parts, has assumed a position of competitive advantage in business. Stock only what you need has become a difficult decision for managers, who are faced with the lack of models and criteria to assist this decision-making. This work proposes a method which supports decision making, on a MATLAB modeling, using criteria established by an expert and his maintenance workers team, focusing on no regular demand of spare parts. The proposed model was adequate to the needs of the company and the maintenance manager in the decision on the storage

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Customer focus , high competitiveness and striving for excellence in quality of service are some of the main features of the current market . Planned and make decisions with greater certainty is no longer an option a few years . The current managers are seeking ways to eliminate waste and increase financial and productive profitability of your company in order to achieve higher performance at a lower cost . The AHP is one of the main concepts of this goal by providing an analysis on multiple criteria , enhancing decision-making and enhancing the gains , with a technique that is designed to take into account all the key criteria for choosing an alternative , according to the perspective of the designer as both suppliers and customers . Emerging as a new way to minimize errors , and make an informed and consistent decision. The use of this method in construction projects is a recent phenomenon , which has much to be explored , an intense analysis of the processes is required to enable it to consider the concepts and present a consistent and grounded proposal

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study presents the development of a business plan to assist in decision making. The feasibility of a new plant capable of producing a polymer known as naphthalene sulfonate is being studied. CSN National Steel Company operates in several areas and encourages employees to seek innovation, supports and assists in the development of this project. This study also discusses entrepreneurship and its expansion into the enterprise corporate entrepreneurship. Explaining the importance and the role in large companies. The business plan is a great tool and demonstrated, mainly in the marketing plan, evidences of project feasibility

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Among the flow, the flows have the highest destructive potential, may cause disasters with a very high number of victims, as recorded in the events Caraguatatuba (SP) and the Serra das Araras (RJ) in 1967; Valeu do Rio Figueira, in Timbé do Sul (SC) between 1995 and 1996; Vale do Itajaí in Santa Catarina, in 2008, Teresópolis, Petrópolis and Nova Friburgo (RJ), in December 2010 and January 2011. This project aimed to prioritize the main determinants of inducing processes of debris flows by applying the method of decision making AHP (Analytical Hierarch Process). Therefore, the following stages of work were defined: research of the major factors of debris flows, questionnaire design method for application of AHP expert on the subject, analysis of the results obtained from calculating the ratio of consistency and preparation of proposal for hierarchical of conditions for debris flows. From the surveys it was possible to establish a relationship of conditions according to the scale of work, defining three levels: regional (1:250,000 to 1:100,000), Semi-Detail (1:50,000 to 1:25,000) and Detail (1: 10,000 or higher). The factors found were: concentration time, the flood wave, rain, landslide susceptibility (slope), drainage and development in the deposition. The project analyzed the results obtained from the questionnaires, which allowed the ranking of the constraints, contributing to weight constraints in studies of multicriteria mapping of susceptibility to the occurrence of debris flows. The study showed that the most of the analyzed datas were inconsistent because of the different opinion of the judges