886 resultados para Network management systems
Resumo:
This paper presents an ongoing project that implements a platform for creating personal learning environments controlled by students, integrating Web 2.0 applications and content management systems, enabling the safe use of content created in Web 2.0 applications, allowing its publication in the infrastructure controlled by the HEI. Using this platform, students can develop their personal learning environment (PLE) integrated with the Learning Management System (LMS) of the HEI, enabling the management of their learning and, simultaneously, creating their e-portfolio with digital content developed for Course Units (CU). All this can be maintained after the student completes his academic studies, since the platform will remain accessible to students even after they leave the HEI and lose access to its infrastructure. The platform will enable the safe use of content created in Web 2.0 applications, allowing its protected publication in the infrastructure controlled by HEI, thus contributing to the adaptation of the L&T paradigm to the Bologna process.
Resumo:
The change of paradigm imposed by the Bologna process, in which the student will be responsible for their own learning, and the presence of a new generation of students with higher technological skills, represent a huge challenge for higher education institutions. The use of new Web Social concepts in teaching process, supported by applications commonly called Web 2.0, with which these new students feel at ease, can bring benefits in terms of motivation and the frequency and quality of students' involvement in academic activities. An e-learning platform with web-based applications as a complement can significantly contribute to the development of different skills in higher education students, covering areas which are usually in deficit.
Resumo:
Both managers and scholars have convictions about the organizational approaches that best support organizational performance of the respective organizations and its Quality Management Systems. After a literature review of ISO 9001 Quality Management Systems (including the changes introduced by the 2015 edition), Organizational Culture theories are addressed and input from a CEO´s focus group was gathered. The importance of organizational culture for the success of Quality Management Systems and the achievement of the organizational desired results is highlighted. The article advances a proposal to analyze ISO 9001 International Standard through the lens of organizational culture theories identifying a stronger open systems approach (influence of the environment, dynamic perspective, need for survival) of the 2015 ISO 9001 edition when compared with the 2008 one. This provides additional knowledge both to scholars and practitioners for a better understanding of the culture issues that can maximize ISO 9001 Quality Management Systems 2015 edition contributions to organizational enduring success.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
Leadership and Management in Engineering, January 2009
Resumo:
The Portuguese educational system has counted, for many years, with the co-existence of both public and private schools. In fact, the country’s growth and development led, in the past, to an increasing demand for free of charge public education that could only be matched through the creation of “publicly-subsidized and privately owned and managed schools”. Still, the demographic evolution of Portugal recently generated a decrease on the demand for public educational services. This situation has raised doubts about the true contribution of this type of school for the public education system. This paper aims at answering this question by isolating the impact of different property and management schemes on the performance of students, resorting to cross-section data on 9th grade students from 2010. The results corroborate the well known result on the relevance of the family socio-economic background for students’ performance, but do also sustain the existence of a significant positive impact of private ownership and management schemes on the overall performance of students. These results suggest that there might be gains associated with the expansion of such schemes within the public education system.
Resumo:
It is a difficult task to avoid the “smart systems” topic when discussing smart prevention and, similarly, it is a difficult task to address smart systems without focusing their ability to learn. Following the same line of thought, in the current reality, it seems a Herculean task (or an irreparable omission) to approach the topic of certified occupational health and safety management systems (OHSMS) without discussing the integrated management systems (IMSs). The available data suggest that seldom are the OHSMS operating as the single management system (MS) in a company so, any statement concerning OHSMS should mainly be interpreted from an integrated perspective. A major distinction between generic systems can be drawn between those that learn, i.e., those systems that have “memory” and those that have not. These former systems are often depicted as adaptive since they take into account past events to deal with novel, similar and future events modifying their structure to enable success in its environment. Often, these systems, present a nonlinear behavior and a huge uncertainty related to the forecasting of some events. This paper seeks to portray, for the first time as we were able to find out, the IMSs as complex adaptive systems (CASs) by listing their properties and dissecting the features that enable them to evolve and self-organize in order to, holistically, fulfil the requirements from different stakeholders and thus thrive by assuring the successful sustainability of a company. Based on the revision of literature carried out, this is the first time that IMSs are pointed out as CASs which may develop fruitful synergies both for the MSs and for CASs communities. By performing a thorough revision of literature and based on some concepts embedded in the “DNA” of the subsystems implementation standards it is intended, specifically, to identify, determine and discuss the properties of a generic IMS that should be considered to classify it as a CAS.
Resumo:
This article compiles the main topics addressed by management systems (MSs) literature concerningMSs integration by performing a systematic literature review. In this paper, it is intended to present themain limitations of non-integratedmanagement systems (IMSs), the main motivations driving an IMS implementation, the major resistances faced, the most common resultant benefits, the suitable guidelines and standards and the critical success factors. In addition, this paper addresses the issues concerning integration strategies and models, the integration levels or degrees achieved by an IMS and the audit function in an integrated context. The motivations that drive companies to integrate their management subsystems, the obstacles faced and the benefits collected may have internal or external origins. The publishing of standards guiding companies on how to integrate their management subsystems has been done mainly at a national level. There are several models that could be used in order to support companies in their management subsystems integration processes, and a sequential or an all-in strategy may be adopted. Four audit typologies can be distinguished, and the adoption of any of these typologies should consider resource availability and audit team know-how, among other features.
Resumo:
Maturity models are adopted to minimise our complexity perception over a truly complex phenomenon. In this sense, maturity models are tools that enable the assessment of the most relevant variables that impact on the outputs of a specific system. Ideally a maturity model should provide information concerning the qualitative and quantitative relationships between variables and how they affect the latent variable, that is, the maturity level. Management systems (MSs) are implemented worldwide and by an increasing number of companies. Integrated management systems (IMSs) consider the implementation of one or several MSs usually coexisting with the quality management subsystem (QMS). It is intended in this chapter to report a model based on two components that enables the assessment of the IMS maturity, considering the key process agents (KPAs) identified through a systematic literature review and the results collected from two surveys.
Resumo:
Schizophrenia stands for a long-lasting state of mental uncertainty that may bring to an end the relation among behavior, thought, and emotion; that is, it may lead to unreliable perception, not suitable actions and feelings, and a sense of mental fragmentation. Indeed, its diagnosis is done over a large period of time; continuos signs of the disturbance persist for at least 6 (six) months. Once detected, the psychiatrist diagnosis is made through the clinical interview and a series of psychic tests, addressed mainly to avoid the diagnosis of other mental states or diseases. Undeniably, the main problem with identifying schizophrenia is the difficulty to distinguish its symptoms from those associated to different untidiness or roles. Therefore, this work will focus on the development of a diagnostic support system, in terms of its knowledge representation and reasoning procedures, based on a blended of Logic Programming and Artificial Neural Networks approaches to computing, taking advantage of a novel approach to knowledge representation and reasoning, which aims to solve the problems associated in the handling (i.e., to stand for and reason) of defective information.
Resumo:
All organisations make some contribution to the degradation of the environment through their use of resources and production of waste. Environmental management systems (EMS) standards can provide a tool for companies to systematically reduce their environmental impacts. ISO 14001 was published in 1996. This fitted in with plans of the case study company to take proactive action in this area, even though there was no legislative requirement for them to do so. As EMS implementation was a new area at the time, appropriate methodologies were developed to address different aspects of the implementation, and ISO 14001 was successfully implemented in the company. The results of the primary research included: ♦ Drawing up a methodology for identifying and interpreting the environmental legislation that may have an impact on the organisation and compiling a register of such regulations. ♦ Developing a robust methodology for assessing significant environmental aspects and impacts and applying this to the software company. ♦ Establishing objectives and targets for those aspects identified as significant and implementing environmental management programmes to meet these. ♦ Developing an internal environmental audit procedure based on auditing against the significant aspects. ♦ Integrating areas of the EMS with the existing quality management system in order to avoid duplication of effort. ♦ Undergoing an external assessment process in order to achieve certification of the system. The thesis concludes that the systematic approach defined in ISO 14001 provided a mechanism that the organisation was able to adopt to bring about improvement in its environmental performance. The system was based on a thorough evaluation of the organisation's significant environmental aspects in order to bring about a reduction in its negative impacts. The ISO 14001 requirement for continual improvement is the key driver of the system, and this is what differentiates it from ISO 9000.
Resumo:
The objectives of this thesis are three. Firstly, finding and analyzing the differences of performance management system in SMEs in Ireland and China. Secondly, finding the cultural differences between China and Ireland and thirdly, integrating the research outcomes of the above research objectives, and then analyzing the effect of these cultural differences on performance management system in SMEs in China and Ireland.
Resumo:
Projecte de recerca elaborat a partir d’una estada al Auditing and Integration of Management Systems Research Laboratory de la Universitat d’Alberta, Canadà, des de maig fins a setembre del 2007. Aquest centre porta a terme recerca de caire teòrica i bàsica aplicada a l’assegurament de la qualitat, i més concretament a l’estandardització i integració de sistemes de gestió. En primer lloc, s’han analitzat les dades obtingudes en l’estudi empíric descriptiu realitzat a Catalunya durant l’any 2005, focalitzat en els estàndards de gestió més utilitzats per les empreses catalanes, en que s’hi incloïen les normes ISO 9001, ISO 14001, OSHAS 18001 així com els nous estàndards de suport de la sèrie ISO 10000. En segon terme, i a partir d’aquest anàlisis previ, s’ha iniciat el disseny d’una metodologia flexible per a la integració dels sistemes de gestió basats en estàndards internacionals.
Resumo:
The first scientific meeting of the newly established European SYSGENET network took place at the Helmholtz Centre for Infection Research (HZI) in Braunschweig, April 7-9, 2010. About 50 researchers working in the field of systems genetics using mouse genetic reference populations (GRP) participated in the meeting and exchanged their results, phenotyping approaches, and data analysis tools for studying systems genetics. In addition, the future of GRP resources and phenotyping in Europe was discussed.
Resumo:
Due to the high cost of a large ATM network working up to full strength to apply our ideas about network management, i.e., dynamic virtual path (VP) management and fault restoration, we developed a distributed simulation platform for performing our experiments. This platform also had to be capable of other sorts of tests, such as connection admission control (CAC) algorithms, routing algorithms, and accounting and charging methods. The platform was posed as a very simple, event-oriented and scalable simulation. The main goal was the simulation of a working ATM backbone network with a potentially large number of nodes (hundreds). As research into control algorithms and low-level, or rather cell-level methods, was beyond the scope of this study, the simulation took place at a connection level, i.e., there was no real traffic of cells. The simulated network behaved like a real network accepting and rejecting SNMP ones, or experimental tools using the API node