157 resultados para Metaheuristics
Resumo:
This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle- To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow calculation is included in the metaheuristics approach to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.
Resumo:
The Rural Postman Problem (RPP) is a particular Arc Routing Problem (ARP) which consists of determining a minimum cost circuit on a graph so that a given subset of required edges is traversed. The RPP is an NP-hard problem with significant real-life applications. This paper introduces an original approach based on Memetic Algorithms - the MARP algorithm - to solve the RPP and, also deals with an interesting Industrial Application, which focuses on the path optimization for component cutting operations. Memetic Algorithms are a class of Metaheuristics which may be seen as a population strategy that involves cooperation and competition processes between population elements and integrates “social knowledge”, using a local search procedure. The MARP algorithm is tested with different groups of instances and the results are compared with those gathered from other publications. MARP is also used in the context of various real-life applications.
Resumo:
No âmbito da investigação operacional o problema de empacotamento de contentores é conhecido por procurar definir uma configuração de carga, de forma a otimizar a utilização de um espaço disponível para efetuar o empacotamento. Este problema pode ser apresentado em diversas formas, formas estas que variam em função das características de cada empacotamento. Estas características podem ser: o tipo de carga que se pretende carregar (homogénea ou heterogénea), a possibilidade de a carga poder sofrer rotações em todas as suas dimensões ou apenas em algumas, o lucro que está associado a cada caixa carregada ou restrições inerentes ao contentor como por exemplo dimensões. O interesse pelo estudo de problemas de empacotamento de contentores tem vindo a receber cada vez mais ênfase por várias razões, uma delas é o interesse financeiro dado que o transporte é uma prática que representa custos, sendo importante diminuir estes custos aproveitando o volume do contentor da melhor forma. Outra preocupação que motiva o estudo deste problema prende-se com fatores ambientes, onde se procura racionalizar os recursos naturais estando esta também ligada a questões financeiras. Na literatura podem ser encontradas varias propostas para solucionar este problema, cada uma destas dirigidas a uma variante do problema, estas propostas podem ser determinísticas ou não determinísticas onde utilizam heurísticas ou metaheurísticas. O estudo realizado nesta dissertação descreve algumas destas propostas, nomeadamente as metaheurísticas que são utilizadas na resolução deste problema. O trabalho aqui apresentado traz também uma nova metaheurísticas, mais precisamente um algoritmo genético que terá como objetivo, apresentar uma configuração de carga para um problema de empacotamento de um contentor. O algoritmo genético tem como objetivo a resolução do seguinte problema: empacotar várias caixas retangulares com diversos tamanhos num contentor. Este problema é conhecido como Bin-Packing. A novidade que este algoritmo genético vai introduzir nas diversas soluções apresentadas até à data, é uma nova forma de criar padrões iniciais, ou seja, é utilizada a heurística HSSI (Heurística de Suavização de Superfícies Irregulares) que tem como objetivo criar uma população inicial de forma a otimizar o algoritmo genético. A heurística HSSI tenta resolver problemas de empacotamento simulando, o comportamento da maioria das pessoas ao fazer este processo na vida real, contudo, tem um campo de busca reduzido entre as soluções possíveis e será então utilizado um algoritmo genético para ampliar este campo de busca e explorar novas soluções. No final pretende-se obter um software onde será possível configurar um dado problema de empacotamento de um contentor e obter, a solução do mesmo através do algoritmo genético. Assim sendo, o estudo realizado tem como principal objetivo contribuir com pesquisas e conclusões, sobre este problema e trazer uma nova proposta de solução para o problema de empacotamento de contentores.
Resumo:
This report describes the full research proposal for the project \Balancing and lot-sizing mixed-model lines in the footwear industry", to be developed as part of the master program in Engenharia Electrotécnica e de Computadores - Sistemas de Planeamento Industrial of the Instituto Superior de Engenharia do Porto. The Portuguese footwear industry is undergoing a period of great development and innovation. The numbers speak for themselves, Portugal footwear exported 71 million pairs of shoes to over 130 countries in 2012. It is a diverse sector, which covers different categories of women, men and children shoes, each of them with various models. New and technologically advanced mixed-model assembly lines are being projected and installed to replace traditional mass assembly lines. Obviously there is a need to manage them conveniently and to improve their operations. This work focuses on balancing and lot-sizing stitching mixed-model lines in a real world environment. For that purpose it will be fundamental to develop and evaluate adequate effective solution methods. Different objectives may be considered, which are relevant for the companies, such as minimizing the number of workstations, and minimizing the makespan, while taking into account a lot of practical restrictions. The solution approaches will be based on approximate methods, namely by resorting to metaheuristics. To show the impact of having different lots in production the initial maximum amount for each lot is changed and a Tabu Search based procedure is used to improve the solutions. The developed approaches will be evaluated and tested. A special attention will be given to the solution of real applied problems. Future work may include the study of other neighbourhood structures related to Tabu Search and the development of ways to speed up the evaluation of neighbours, as well as improving the balancing solution method.
Resumo:
Dissertação para obtenção do Grau de Mestre em Logica Computicional
Resumo:
Earthworks tasks aim at levelling the ground surface at a target construction area and precede any kind of structural construction (e.g., road and railway construction). It is comprised of sequential tasks, such as excavation, transportation, spreading and compaction, and it is strongly based on heavy mechanical equipment and repetitive processes. Under this context, it is essential to optimize the usage of all available resources under two key criteria: the costs and duration of earthwork projects. In this paper, we present an integrated system that uses two artificial intelligence based techniques: data mining and evolutionary multi-objective optimization. The former is used to build data-driven models capable of providing realistic estimates of resource productivity, while the latter is used to optimize resource allocation considering the two main earthwork objectives (duration and cost). Experiments held using real-world data, from a construction site, have shown that the proposed system is competitive when compared with current manual earthwork design.
Resumo:
Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs and duration of earthworks in infrastructure construction, the optimal usage of every resource in these tasks is paramount. Considering the characteristics of an earthwork construction, it can be looked at as a production line based on resources (mechanical equipment) and dependency relations between sequential tasks, hence being susceptible to optimization. Up to the present, the steady development of Information Technology areas, such as databases, artificial intelligence and operations research, has resulted in the emergence of several technologies with potential application bearing that purpose in mind. Among these, modern optimization methods (also known as metaheuristics), such as evolutionary computation, have the potential to find high quality optimal solutions with a reasonable use of computational resources. In this context, this work describes an optimization algorithm for earthworks equipment allocation based on a modern optimization approach, which takes advantage of the concept that an earthwork construction can be regarded as a production line.
Resumo:
In highway construction, earthworks refer to the tasks of excavation, transportation, spreading and compaction of geomaterial (e.g. soil, rockfill and soil-rockfill mixture). Whereas relying heavily on machinery and repetitive processes, these tasks are highly susceptible to optimization. In this context Artificial Intelligent techniques, such as Data Mining and modern optimization can be applied for earthworks. A survey of these applications shows that they focus on the optimization of specific objectives and/or construction phases being possible to identify the capabilities and limitations of the analyzed techniques. Thus, according to the pinpointed drawbacks of these techniques, this paper describes a novel intelligent earthwork optimization system, capable of integrating DM, modern optimization and GIS technologies in order to optimize the earthwork processes throughout all phases of design and construction work. This integration system allows significant savings in time, cost and gas emissions contributing for a more sustainable construction.
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Tese de Doutoramento em Engenharia Civil.
Resumo:
The main objective of this project is to model the ARP (Aircraft Recovery Problem) from a constraint programming (CP) point of view. The information required for this project is extracted from previous papers that cope with the problem using heuristics, metaheuristics or using network-models. Also, two scenarios will be tested to verify that the implementation is correct.
Resumo:
From a managerial point of view, the more effcient, simple, and parameter-free (ESP) an algorithm is, the more likely it will be used in practice for solving real-life problems. Following this principle, an ESP algorithm for solving the Permutation Flowshop Sequencing Problem (PFSP) is proposed in this article. Using an Iterated Local Search (ILS) framework, the so-called ILS-ESP algorithm is able to compete in performance with other well-known ILS-based approaches, which are considered among the most effcient algorithms for the PFSP. However, while other similar approaches still employ several parameters that can affect their performance if not properly chosen, our algorithm does not require any particular fine-tuning process since it uses basic "common sense" rules for the local search, perturbation, and acceptance criterion stages of the ILS metaheuristic. Our approach defines a new operator for the ILS perturbation process, a new acceptance criterion based on extremely simple and transparent rules, and a biased randomization process of the initial solution to randomly generate different alternative initial solutions of similar quality -which is attained by applying a biased randomization to a classical PFSP heuristic. This diversification of the initial solution aims at avoiding poorly designed starting points and, thus, allows the methodology to take advantage of current trends in parallel and distributed computing. A set of extensive tests, based on literature benchmarks, has been carried out in order to validate our algorithm and compare it against other approaches. These tests show that our parameter-free algorithm is able to compete with state-of-the-art metaheuristics for the PFSP. Also, the experiments show that, when using parallel computing, it is possible to improve the top ILS-based metaheuristic by just incorporating to it our biased randomization process with a high-quality pseudo-random number generator.
Resumo:
In this paper we propose a metaheuristic to solve a new version of the Maximum Capture Problem. In the original MCP, market capture is obtained by lower traveling distances or lower traveling time, in this new version not only the traveling time but also the waiting time will affect the market share. This problem is hard to solve using standard optimization techniques. Metaheuristics are shown to offer accurate results within acceptable computing times.
Resumo:
Iterated Local Search has many of the desirable features of a metaheuristic: it is simple, easy to implement, robust, and highly effective. The essential idea of Iterated Local Search lies in focusing the search not on the full space of solutions but on a smaller subspace defined by the solutions that are locally optimal for a given optimization engine. The success of Iterated Local Search lies in the biased sampling of this set of local optima. How effective this approach turns out to be depends mainly on the choice of the local search, the perturbations, and the acceptance criterion. So far, in spite of its conceptual simplicity, it has lead to a number of state-of-the-art results without the use of too much problem-specific knowledge. But with further work so that the different modules are well adapted to the problem at hand, Iterated Local Search can often become a competitive or even state of the artalgorithm. The purpose of this review is both to give a detailed description of this metaheuristic and to show where it stands in terms of performance.