997 resultados para Maintenance planning
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 2 - Construction and Maintenance Operations and Reporting. This module provides hands on examples of applications of metric measurements in the construction and maintenance field operations.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.
Resumo:
As streets age, officials must deal with rehabilitating and reconstructing these pavements to maintain a safe and comfortable ride. In light of nationwide budget shortfalls, cost-effective methods of extending pavement service life must be developed or the overall condition of street systems will continue to fall. Thin maintenance surfaces (TMSs) are a set of cost-effective preventive maintenance surfacing techniques that can be used to extend the life of bituminous pavement—pavement built with hot mix asphalt, hot mix asphalt overlays of portland cement concrete pavements, built-up seal coat (chip seal), stabilized materials, or a combination of these. While previous phases of TMS research have provided information about the uses of thin maintenance surfaces in rural settings, urban areas have different road maintenance challenges that should be considered separately. This research provides city street officials with suggestions for TMS techniques that street departments can easily test and include into their current programs. This research project facilitated the construction of TMS test sections in Cedar Rapids, Council Bluffs, and West Des Moines (all urban settings in Iowa). Test section sites and surfaces were selected to suit the needs of municipalities and were applied to roads with an array of various distresses and maintenance needs. Condition surveys of each test section were performed before construction, after construction, and after the first winter to record the amount and severity of existing distress and calculate the pavement condition index. Because conditions of the test sections varied greatly, determining which surface was most successful by comparing case studies was not feasible. However, some general conclusions can be made from this research. TMSs are suitable preventive maintenance techniques for a municipal street department’s program for preserving existing pavements. Careful attention should be paid to proper planning, quality control during construction, aggregate and binder selection, and aggregate embedment in order to support successful TMS application.
Resumo:
With an annual pavement marking program of approximately $2 million and another $750 thousand invested in maintenance of durable markings each year, the Iowa DOT is seeking every opportunity to provide all-year markings staying in acceptable condition under all weather conditions. The goal of this study is to analyze existing pavement marking practices and to develop a prototype Pavement Marking Management System (PMMS). This report documents the first two phases of a three-phase research project. Phase I includes an overview of the Iowa DOT’s existing practices and a literature review regarding pavement marking practices in other states. Based on this information, a work plan was developed for Phases II and III of this study. Phase II organized the key components necessary to develop a prototype PMMS for the Iowa DOT. The two primary components are (1) performance/life cycle curves for pavement marking products, and (2) an application matrix tailored to the pavement marking products and roadway and environmental conditions faced by the Iowa DOT. Both components will continue to be refined and tailored to Iowa materials and conditions as more performance data becomes available.
Resumo:
Toiminnanohjausjärjestelmien käyttö on muuttanut metsäteollisuuden kunnossapidon työntekijän toimenkuvaa kunnossapidon perustoiminnoista itseohjautuvampaan tietojen käsittelyyn ja jalostamiseen. Työn tavoitteena oliselvittää mobiilin työtilausjärjestelmän vaikutuksia metsäteollisuuden kunnossapidon kenttätyössä. Mobiilin työtilausjärjestelmän käyttö metsäteollisuuden kunnossapidossa mahdollistaa tärkeän kunnossapitotiedon keräämisen ja tarkentamisen kentällä, jossa se usein on ajanmukaisinta ja tarkinta. Haasteellisinta on oikeanlaisen teknologian löytäminen ja standardoiminen kunnossapidon toimintaympäristöihin. Myös organisaation toimintoprosessien on oltava selkeät ennen kuin prosesseja voidaan tehostaa teknologisin keinoin.
Resumo:
Tutkielman tavoitteena on selvittää kuinka suunnitella ja hallita tehokasta verkkoviestintää, joka vastaa kohdeyleisön ja palvelun ylläpitäjien kasvaviin vaatimuksiin. Tutkielma on normatiivinen tapaustutkimus, jonka tuloksena syntyy konstruktiivinen askelmalli kokonaisvaltaisen verkkoviestintäprojektin toteuttamiseen. Tutkimus esittää myös teoreettisesti merkittävän näkökulman verkkopalvelujen sisällön hallintaongelmien ratkaisemiseen. Tosielämän verkkoviestintäprojektin toteutusta seurataan TietoEnator Forestissa, jossa tutkielman kirjoittaja työskentelee. Tutkimusmateriaalina käytetään 11 TietoEnator Forestissa toteutettua haastattelua, TietoEnator konsernin dokumentaatiota ja osallistuvaa havainnointia. Haastattelulomake sisältää 13 avointa kysymystä, jotka käsittelevät verkkoviestintästrategian perusasioita. Tunnistetut verkkoviestinnän avainmenestystekijät ovat vahva sisäinen sitoutuminen hajautettuihin ylläpitorooleihin ja perinpohjainen asiakastarpeiden tunnistaminen. Teknisesti on tärkeää, että eritason verkkoympäristöt, Internet, Intranet ja Extranet, hallitaan samoilla sisällönhallinta työkaluilla. Näin pystytään rationalisoimaan ylläpitotoiminnot.
Resumo:
The objective of this study was to verify the potential of SNAP III (Scheduling and Network Analysis Program) as a support tool for harvesting and wood transport planning in Brazil harvesting subsystem definition and establishment of a compatible route were assessed. Initially, machine operational and production costs were determined in seven subsystems for the study area, and quality indexes, construction and maintenance costs of forest roads were obtained and used as SNAP III program input data. The results showed, that three categories of forest road occurrence were observed in the study area: main, secondary and tertiary which, based on quality index, allowed a medium vehicle speed of about 41, 30 and 24 km/hours and a construction cost of about US$ 5,084.30, US$ 2,275.28 and US$ 1,650.00/km, respectively. The SNAP III program used as a support tool for the planning, was found to have a high potential tool in the harvesting and wood transport planning. The program was capable of defining efficiently, the harvesting subsystem on technical and economical basis, the best wood transport route and the forest road to be used in each period of the horizon planning.
Resumo:
The objective of this project was to introduce a new software product to pulp industry, a new market for case company. An optimization based scheduling tool has been developed to allow pulp operations to better control their production processes and improve both production efficiency and stability. Both the work here and earlier research indicates that there is a potential for savings around 1-5%. All the supporting data is available today coming from distributed control systems, data historians and other existing sources. The pulp mill model together with the scheduler, allows what-if analyses of the impacts and timely feasibility of various external actions such as planned maintenance of any particular mill operation. The visibility gained from the model proves also to be a real benefit. The aim is to satisfy demand and gain extra profit, while achieving the required customer service level. Research effort has been put both in understanding the minimum features needed to satisfy the scheduling requirements in the industry and the overall existence of the market. A qualitative study was constructed to both identify competitive situation and the requirements vs. gaps on the market. It becomes clear that there is no such system on the marketplace today and also that there is room to improve target market overall process efficiency through such planning tool. This thesis also provides better overall understanding of the different processes in this particular industry for the case company.
Resumo:
Chaotic traffic, prevalent in many countries, is marked by a large number of vehicles driving with different speeds without following any predefined speed lanes. Such traffic rules out using any planning algorithm for these vehicles which is based upon the maintenance of speed lanes and lane changes. The absence of speed lanes may imply more bandwidth and easier overtaking in cases where vehicles vary considerably in both their size and speed. Inspired by the performance of artificial potential fields in the planning of mobile robots, we propose here lateral potentials as measures to enable vehicles to decide about their lateral positions on the road. Each vehicle is subjected to a potential from obstacles and vehicles in front, road boundaries, obstacles and vehicles to the side and higher speed vehicles to the rear. All these potentials are lateral and only govern steering the vehicle. A speed control mechanism is also used for longitudinal control of vehicle. The proposed system is shown to perform well for obstacle avoidance, vehicle following and overtaking behaviors.
Resumo:
The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.
Resumo:
The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.
Resumo:
This extension circular covers the following areas of a cash flow planning form: Beginning Cash Balance, Operating Sales (crop and hay, market livestock, livestock product, custom work); Capital Sales (breeding livestock, machinery and equipment); Personal Income (wages, interest); Operating Expenses (car/truck, chemicals, conservation, custom hire, feed purchased, fertilizers and lime, freight and trucking, gasoline, fuel and oil, insurance, labor hired, rents and leases, repairs and maintenance, seeds and plants, storage, warehousing, supplies, taxes, utilities, veterinary, breeding fees and medicine, feeder livestock); Capital Purchases (breeding livestock, machinery and equipment, family living withdrawals, personal investments, income and social security, term loan payments); Net Cash Available (operating loan borrowings, operating loan payments); and Ending Operating Loan Balance. Along with the Cash Flow Planning Form is a Projected Income Statement Form which covers Projected Business Income (operating sales, breeding livestock, estimated cash income adjustments, estimated gross revenues, estimated value of production); Project Business Expenses (cash operating, esimated operating, prepaid and supplies, cash investment in growing crops, accounts payable); Projected Net Income Summary (estimated net income from operations, estimated net business income, estimated net income after taxes, estimated earned net worth change); and a Physical Inventory Flows Worksheet.
Resumo:
Single planning interventions have been found to promote short-term dietary change. Repeated planning interventions may foster long-term effects on behavior change. It remains unknown whether there is a critical number of boosters to establish long-term maintenance of behavioral changes. This study aimed at investigating what social-cognitive variables mediate the effects of the interventions on dietary behavior change. Overall, 373 participants (n = 270 women, 72.4%; age M = 52.42, SD = 12.79) were randomly allocated to one of five groups: a control group, a single planning group, and three groups with 3, 6, or 9 weeks' repeated planning interventions. Follow-ups took place 4, 6, and 12 months after baseline. Change in fat consumption was not promoted by any of the interventions. In terms of social-cognitive variables, intentions, self-efficacy and coping planning displayed a time × group interaction, with the 9 weeks' planning group showing the most beneficial effects. Effect sizes, however, were very small. None of the tested planning interventions successfully promoted change in fat consumption across the 12 month period. This, however, could not be explained by problems with adherence to the intervention protocol. Potential explanations for this unexpected result are discussed.
Resumo:
Under the 12th International Conference on Building Materials and Components is inserted this communication related to the field of management of those assets that constitute the Spanish Cultural Heritage and maintenance. This work is related to the field of management of those assets that constitute the Spanish Cultural Heritage which share an artistic or historical background. The conservation and maintenance become a social demand necessary for the preservation of public values, requiring the investment of necessary resources. The legal protection involves a number of obligations and rights to ensure the conservation and heritage protection. The duty of maintenance and upkeep exceeds the useful life the property that must endure more for their cultural value for its usability. The establishment of the necessary conditions to prevent deterioration and precise in order to fulfill its social function, seeking to prolong the life of the asset, preserving their physical integrity and its ability to convey the values protected. This obligation implies a substantial financial effort to the holder of the property, either public or private entity, addressing a problem of economic sustainability. Economic exploitation, with the aim of contributing to their well-maintained, is sometimes the best way to get resources. The work will include different lines of research with the following objectives. - Establishment of processes for assessing total costs over the building life cycle (LCC), during the planning stages or maintenance budgets to determine the most advantageous operating system. - Relationship between the value of property and maintenance costs, and establishing a sensitivity analysis.
Resumo:
This paper presents the design and results of the implementation of a model for the evaluation and improvement of maintenance management in industrial SMEs. A thorough review of the state of the art on maintenance management was conducted to determine the model variables; to characterize industrial SMEs, a questionnaire was developed with Likert variables collected in the previous step. Once validated the questionnaire, we applied the same to a group of seventy-five (75) SMEs in the industrial sector, located in Bolivar State, Venezuela. To identify the most relevant variables maintenance management, we used exploratory factor analysis technique applied to the data collected. The score obtained for all the companies evaluated (57% compliance), highlights the weakness of maintenance management in industrial SMEs, particularly in the areas of planning and continuous improvement; most SMEs are evaluated in corrective maintenance stage, and its performance standard only response to the occurrence of faults.