985 resultados para Machine-shop practice.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Title Varies: V.1, Home Study; V.2-3, Home Study Magazine; V.4,No.10-V.8,No.4, Science and Industry

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper considers the problem of minimizing the schedule length of a two-machine shop in which not only can a job be assigned any of the two possible routes, but also the processing times depend on the chosen route. This problem is known to be NP-hard. We describe a simple approximation algorithm that guarantees a worst-case performance ratio of 2. We also present some modifications to this algorithm that improve its performance and guarantee a worst-case performance ratio of 3=2.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

[ES]Este proyecto investigador tiene como objetivo el ayudar con la calibración del mecanismo de cinco pares de rotación montado en el taller de Ingeniería Mecánica de la ETSI de Bilbao. En primer lugar se estudiarán los algoritmos de optimización prestando especial atención a la comparativa entre Levenberg-Marquart y Gauss-Newton. Se realizarán estudios en Matlab para concluir cuál de los dos es más eficaz tanto en rapidez como en precisión. El que sea más adecuado se implementará en un programa para la calibración del mecanismo 5R. En segundo lugar se estudiarán los índices de observabilidad. Los estudios que se han realizado sobre ellos hasta ahora son poco concluyentes asique se intentará aclarar su utilidad y determinar cuál es el que conviene utilizar en este caso. Para ello se deberá programar la resolución del problema cinemático inverso. Por último se presentarán los resultados y las conclusiones correspondientes. Se propondrá también un plan de desarrollo de una línea de investigación futura que partirá con este trabajo como base.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Keeping a record of operator experience remains a challenge to operation management and a major source of inefficiency in information management. The objective is to develop a framework that enables an explicit presentation of experience based on information use. A purposive sampling method is used to select four small and medium-sized enterprises as case studies. The unit of analysis is the production process in the machine shop. Data collection is by structured interview, observation and documentation. A comparative case analysis is applied. The findings suggest experience is an accumulation of tacit information feedback, which can be made explicit in information use interoperatability matrix. The matrix is conditioned upon information use typology, which is strategic in waste reduction. The limitations include difficulty of participant anonymity where the organisation nominates a participant. Areas for further research include application of the concepts to knowledge management and shop floor resource management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Survey map of the Second Welland Canal created by the Welland Canal Company showing the Town of St. Catharines. Identified structures associated with the Canal include Lock 3 and its Lock House, Lock 4 and its Lock House, Hydraulic Race, and a floating tow path. The surveyors' measurements and notes can be seen in red and black ink and pencil. Local area landmarks are also identified and include streets and roads (ex. Geneva Street, Ontario Street, St. Paul Street, and Merritville Road), Lincoln Mills and its Store House, T. M. Merritt's Store House, Cooper Shop, L. Shickluna's Dry Dock, Peter McGill's Grist Mill, J. Flint's Saw Factory, T. Hosteter's Gristing Mill, J. Dougan Builder's shop or office, Norris and Nelson Mill, G. N. Oil Foundry and its Machine Shop and Boiler, a barrel shed, woolen factory, Estate of P. Nihen (or T. Nihan), Norris and Nelson's Wharf, the W. C. Office, and structures (possibly houses) or small properties belonging to T. Adams, and A. K. Boomer. Properties and property owners of note are: Concession 6 Lots 16, 17, and 18, Concession 7 Lots 16, 17, and 18, Alva Dittrick, James R. Benson, W. B. Robinson, and C. Phelps.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Survey map of the Second Welland Canal created by the Welland Canal Company showing south Merritton along the boundary between the Grantham and Thorold Townships. Identified structures associated with the Canal include Locks 19, 20, 21, and 22, Lock Tenders House, and the towing path. The surveyors' measurements and notes can be seen in red and black ink and pencil. Local area landmarks are also identified and include streets and roads (ex. Pine Street and Macadamized Road), J. Brown Cement Mill, W. B. Hendershot Saw Mill, W. Parnall Spoke and Sash Factory, W. Beatty Saw Mill, W. Beatty Tannery, a number of structures (possibly houses) belonging to: Mrs. Aikins, J. Battle, and E. Keefer, and a foundry, smithy, and machine shop (all of which possible belonged to J. Dobbie). Properties and property owners of note are: Concession 10 Lots 9 and 10, W. C. Loan Company, P.H. Ball, and J. Keefer. Two small properties belonging to W. B. Hendershot and W. Beatty exist and are outlined in red. A half acre property reserved for a lock lot exists and is outlined in blue. An additional property reserved for a quarry is also identified, but not outlined.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Auction Sale notice concerning a brick and stone carpenter shop; a frame wheel-house building and a stone machine shop building all located on Cascade Street in Niagara Falls, Ontario. The Superintendent of the State Reservation at Niagara is listed as Thomas W. Welch. The names Thomas Dolphin – Suspension Bridge; W.A. Frazer – Suspension Bridge; Alice L. [illegible] – Niagara Falls and James C. [illegible] are written on the notice in blue pencil. There is a tear at the top of the notice and wear along the sides. Text is not affected. The item is slightly discoloured and mounted on cardboard, 28 cm x 20 cm, January 27, 1886.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis work has been carried out at Clarkson University in Potsdam NY, USA and involved the design of a low elongation wing, consisting of parts made by polylactide (PLA) using the fused deposition model (FDM) technology of Rapid Prototyping, then assembled together in a thin aluminum spar. The aim of the research is to evaluate the feasibility of collecting electrical energy by converting mechanical energy from the vibration of the wing flutter. With this aim piezoelectric stripes were glued in the inner part of the wing, as well as on the aluminum spar, as monomorphic configuration. During the phases of the project, particular attention was given to the geometry and the materials used, in order to trigger the flutter for low flow velocity. The CAD software SolidWorks® was used for the design of the wing and then the drawings were sent to the Clarkson machine shop in order to to produce the parts required by the wing assembly. FEM simulations were performed, using software MSC NASTRAN/PATRAN®, to evaluate the stiffness of the whole wing as well as the natural vibration modes of the structure. These data, in a first approximation, were used to predict the flutter speed. Finally, experimental tests in the Clarkson wind tunnel facility were carried out in order to validate the results obtained from FEM analysis. The power collected by the piezoelectrics under flutter condition was addressed by tuning the resistors downstream the electronic circuit of the piezoelectrics.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

[v. 1] The locomotive -- [v. 1 portfolio] Locomotive portfolio -- [v. 2] Engineers' and firemen's handbook -- [v. 3] Locomotive appliances -- [v. 3 suppl.] Supplement to volume Locomotive appliances -- [v. 4] Electricity applied to railways -- [v. 5] Cars, their construction and handling -- [v. 5 suppl. 2] Cars, their construction and handling : supplement --[v. 5 portfolio 1] Supplement to Kirkman's Science of railways : cars, their construction and handling -- [v. 5 portfolio 2] Portfolio of cars -- [v. 6-7] The air brake -- [v. 6-7 portfolio 1] Air brake portfolio : Westinghouse diagrammatic & sectional views air brake & air signal instruction charts -- [v. 6-7 portfolio 2] Air brake portfolio : New York diagrammatic and sectional views air brake instruction charts -- [v. 7 suppl. 1] Westinghouse universal common standard U.C. two-cylinder brake equipment with U-12 universal valve -- [v. 7 suppl. 2] Auxiliary devices governor -- [v. 8] Operating trains -- [v. 9-10] Shops and shop practice.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis deals with the problems associated with the planning and control of production, with particular reference to a small aluminium die casting company. The main problem areas were identified as: (a) A need to be able to forecast the customers demands upon the company's facilities. (b) A need to produce a manufacturing programme in which the output of the foundry (or die casting section) was balanced with the available capacity in the machine shop. (c) The need to ensure that the resultant system enabled the company's operating budget to have a reasonable chance of being achieved. At the commencement of the research work the major customers were members of the automobile industry and had their own system of forecasting, from which they issued manufacturing schedules to their component suppliers, The errors in the forecast were analysed and the distributions noted. Using these distributions the customer's forecast was capable of being modified to enable his final demand to be met with a known degree of confidence. Before a manufacturing programme could be developed the actual manufacturing system had to be reviewed and it was found that as with many small companies there was a remarkable lack of formal control and written data. Relevant data with regards to the component and the manufacturing process had therefore to be collected and analysed. The foundry process was fixed but the secondary machining operations were analysed by a technique similar to Component Flow Analysis and as a result the machines were arranged in a series of flow lines. A system of manual production control was proposed and for comparison, a local computer bureau was approached and a system proposed incorporating the production of additional management information. These systems are compared and the relative merits discussed and a proposal made for implementation.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

In practice, parallel-machine job-shop scheduling (PMJSS) is very useful in the development of standard modelling approaches and generic solution techniques for many real-world scheduling problems. In this paper, based on the analysis of structural properties in an extended disjunctive graph model, a hybrid shifting bottleneck procedure (HSBP) algorithm combined with Tabu Search metaheuristic algorithm is developed to deal with the PMJSS problem. The original-version SBP algorithm for the job-shop scheduling (JSS) has been significantly improved to solve the PMJSS problem with four novelties: i) a topological-sequence algorithm is proposed to decompose the PMJSS problem into a set of single-machine scheduling (SMS) and/or parallel-machine scheduling (PMS) subproblems; ii) a modified Carlier algorithm based on the proposed lemmas and the proofs is developed to solve the SMS subproblem; iii) the Jackson rule is extended to solve the PMS subproblem; iv) a Tabu Search metaheuristic algorithm is embedded under the framework of SBP to optimise the JSS and PMJSS cases. The computational experiments show that the proposed HSBP is very efficient in solving the JSS and PMJSS problems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, the train scheduling problem is modelled as a blocking parallel-machine job shop scheduling (BPMJSS) problem. In the model, trains, single-track sections and multiple-track sections, respectively, are synonymous with jobs, single machines and parallel machines, and an operation is regarded as the movement/traversal of a train across a section. Due to the lack of buffer space, the real-life case should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold the train until next section on the routing becomes available. Based on literature review and our analysis, it is very hard to find a feasible complete schedule directly for BPMJSS problems. Firstly, a parallel-machine job-shop-scheduling (PMJSS) problem is solved by an improved shifting bottleneck procedure (SBP) algorithm without considering blocking conditions. Inspired by the proposed SBP algorithm, feasibility satisfaction procedure (FSP) algorithm is developed to solve and analyse the BPMJSS problem, by an alternative graph model that is an extension of the classical disjunctive graph models. The proposed algorithms have been implemented and validated using real-world data from Queensland Rail. Sensitivity analysis has been applied by considering train length, upgrading track sections, increasing train speed and changing bottleneck sections. The outcomes show that the proposed methodology would be a very useful tool for the real-life train scheduling problems