366 resultados para Interconnection
Resumo:
A network concept is introduced that exploits transparent optical grooming of traffic between an access network and a metro core ring network. This network is enabled by an optical router that allows bufferless aggregation of metro network traffic into higher-capacity data streams for core network transmission. A key functionality of the router is WDM to time-division multiplexing (TDM) transmultiplexing.
Resumo:
Semiconductor chip packaging has evolved from single chip packaging to 3D heterogeneous system integration using multichip stacking in a single module. One of the key challenges in 3D integration is the high density interconnects that need to be formed between the chips with through-silicon-vias (TSVs) and inter-chip interconnects. Anisotropic Conductive Film (ACF) technology is one of the low-temperature, fine-pitch interconnect method, which has been considered as a potential replacement for solder interconnects in line with continuous scaling of the interconnects in the IC industry. However, the conventional ACF materials are facing challenges to accommodate the reduced pad and pitch size due to the micro-size particles and the particle agglomeration issue. A new interconnect material - Nanowire Anisotropic Conductive Film (NW-ACF), composed of high density copper nanowires of ~ 200 nm diameter and 10-30 µm length that are vertically distributed in a polymeric template, is developed in this work to tackle the constrains of the conventional ACFs and serves as an inter-chip interconnect solution for potential three-dimensional (3D) applications.
Resumo:
Le Système Stockage de l’Énergie par Batterie ou Batterie de Stockage d’Énergie (BSE) offre de formidables atouts dans les domaines de la production, du transport, de la distribution et de la consommation d’énergie électrique. Cette technologie est notamment considérée par plusieurs opérateurs à travers le monde entier, comme un nouveau dispositif permettant d’injecter d’importantes quantités d’énergie renouvelable d’une part et d’autre part, en tant que composante essentielle aux grands réseaux électriques. De plus, d’énormes avantages peuvent être associés au déploiement de la technologie du BSE aussi bien dans les réseaux intelligents que pour la réduction de l’émission des gaz à effet de serre, la réduction des pertes marginales, l’alimentation de certains consommateurs en source d’énergie d’urgence, l’amélioration de la gestion de l’énergie, et l’accroissement de l’efficacité énergétique dans les réseaux. Cette présente thèse comprend trois étapes à savoir : l’Étape 1 - est relative à l’utilisation de la BSE en guise de réduction des pertes électriques ; l’Étape 2 - utilise la BSE comme élément de réserve tournante en vue de l’atténuation de la vulnérabilité du réseau ; et l’Étape 3 - introduit une nouvelle méthode d’amélioration des oscillations de fréquence par modulation de la puissance réactive, et l’utilisation de la BSE pour satisfaire la réserve primaire de fréquence. La première Étape, relative à l’utilisation de la BSE en vue de la réduction des pertes, est elle-même subdivisée en deux sous-étapes dont la première est consacrée à l’allocation optimale et le seconde, à l’utilisation optimale. Dans la première sous-étape, l’Algorithme génétique NSGA-II (Non-dominated Sorting Genetic Algorithm II) a été programmé dans CASIR, le Super-Ordinateur de l’IREQ, en tant qu’algorithme évolutionniste multiobjectifs, permettant d’extraire un ensemble de solutions pour un dimensionnement optimal et un emplacement adéquat des multiple unités de BSE, tout en minimisant les pertes de puissance, et en considérant en même temps la capacité totale des puissances des unités de BSE installées comme des fonctions objectives. La première sous-étape donne une réponse satisfaisante à l’allocation et résout aussi la question de la programmation/scheduling dans l’interconnexion du Québec. Dans le but de réaliser l’objectif de la seconde sous-étape, un certain nombre de solutions ont été retenues et développées/implantées durant un intervalle de temps d’une année, tout en tenant compte des paramètres (heure, capacité, rendement/efficacité, facteur de puissance) associés aux cycles de charge et de décharge de la BSE, alors que la réduction des pertes marginales et l’efficacité énergétique constituent les principaux objectifs. Quant à la seconde Étape, un nouvel indice de vulnérabilité a été introduit, formalisé et étudié ; indice qui est bien adapté aux réseaux modernes équipés de BES. L’algorithme génétique NSGA-II est de nouveau exécuté (ré-exécuté) alors que la minimisation de l’indice de vulnérabilité proposé et l’efficacité énergétique représentent les principaux objectifs. Les résultats obtenus prouvent que l’utilisation de la BSE peut, dans certains cas, éviter des pannes majeures du réseau. La troisième Étape expose un nouveau concept d’ajout d’une inertie virtuelle aux réseaux électriques, par le procédé de modulation de la puissance réactive. Il a ensuite été présenté l’utilisation de la BSE en guise de réserve primaire de fréquence. Un modèle générique de BSE, associé à l’interconnexion du Québec, a enfin été proposé dans un environnement MATLAB. Les résultats de simulations confirment la possibilité de l’utilisation des puissances active et réactive du système de la BSE en vue de la régulation de fréquence.
Resumo:
The main purpose of this paper is to present architecture of automated system that allows monitoring and tracking in real time (online) the possible occurrence of faults and electromagnetic transients observed in primary power distribution networks. Through the interconnection of this automated system to the utility operation center, it will be possible to provide an efficient tool that will assist in decisionmaking by the Operation Center. In short, the desired purpose aims to have all tools necessary to identify, almost instantaneously, the occurrence of faults and transient disturbances in the primary power distribution system, as well as to determine its respective origin and probable location. The compilations of results from the application of this automated system show that the developed techniques provide accurate results, identifying and locating several occurrences of faults observed in the distribution system.
Resumo:
The BR algorithm is a novel and efficient method to find all eigenvalues of upper Hessenberg matrices and has never been applied to eigenanalysis for power system small signal stability. This paper analyzes differences between the BR and the QR algorithms with performance comparison in terms of CPU time based on stopping criteria and storage requirement. The BR algorithm utilizes accelerating strategies to improve its performance when computing eigenvalues of narrowly banded, nearly tridiagonal upper Hessenberg matrices. These strategies significantly reduce the computation time at a reasonable level of precision. Compared with the QR algorithm, the BR algorithm requires fewer iteration steps and less storage space without depriving of appropriate precision in solving eigenvalue problems of large-scale power systems. Numerical examples demonstrate the efficiency of the BR algorithm in pursuing eigenanalysis tasks of 39-, 68-, 115-, 300-, and 600-bus systems. Experiment results suggest that the BR algorithm is a more efficient algorithm for large-scale power system small signal stability eigenanalysis.
Resumo:
RESUMO: Esta investigação é fundamentalmente um trabalho baseado numa análise documental e arquitectónica de duas escolas primárias construídas em duas épocas diferentes, mas ambas integradas num mesmo período político. Saber se o Projecto do Plano dos Centenários e o Projecto DEEB se adequaram às realidades educativas, no seu percurso temporal, foi o ponto de partida para uma pesquisa geral sobre a situação económica, política e social do país, desde a década de 1940 até finais da década de 1960, possibilitando a caracterização e comparação daqueles Projectos na sua interligação com as concepções educativas e a construção escolar. Fez-se a consulta das obras e dos projectos da época em estudo com o objectivo de analisar e interpretar o processo de criação, mas também de situar historicamente os factos arquitectónicos na sua intersecção com os educativos, com vista à concretização de uma pesquisa no tempo, de dois espaços, ou seja, desde um Projecto-Tipo de uma escola primária, em Cascais, do Plano dos Centenários até ao Projecto-Piloto da escola primária de Mem Martins com base no Projecto DEEB. Por outro lado, as contribuições a nível nacional e internacional trouxeram elementos de mudança e constituíram-se como referências básicas na transformação geral da arquitectura e da pedagogia portuguesa. ABSTRACT: This investigation is mainly a piece based in an architectonic and documental analysis of two elementary schools, both built in different periods, but belonging to the same political regime. Knowing if the Plano dos Centenários (Centenary’s Project) and the Projecto DEEB (DEEB Project) fit the educative realities, in terms of time, was the starting point for a general research about the economical, political, and social situation of the Country from the beginning of the 40s till the end of the 60s, thus allowing to describe and compare those projects in terms of interconnection with the educative ideas and the school building. With the purpose of not only analyzing and explaining how it started, but also to historically locate the architectonic events in their intersection with the educative ones, the building sites and the projects of the period being studied were examined, in order to timeresearch both spaces, i.e. since a Type-Project of and elementary school, in Cascais, from the Plano dos Centenários (Centenary’s Project) till the Test-School of the Mem Martins’ elementary school, based in the Projecto DEEB (DEEB Project). On the other hand, both National and International contributions have introduced changing elements, which became essential references in the general transformation of the Portuguese architecture and Pedagogy.
Resumo:
O crescimento da utilização de accionamentos electromecânicos de velocidade variável entre outros dispositivos que necessitam de tensões elevadas, na ordem dos kV e com elevados níveis de qualidade, despertou o interesse pelos conversores multinível. Este tipo de conversor consegue alcançar elevadas tensões de funcionamento e simultaneamente melhorar a qualidade das formas de onda de tensão e corrente nas respectivas fases. Esta dissertação de mestrado tem por objectivo apresentar um estudo sobre o conversor multinível com díodos de ligação ao neutro (NPC – neutral point clamped), de cinco níveis utilizado como ondulador de tensão ligado à rede. O trabalho começa por desenvolver o modelo matemático do conversor multinível com díodos de ligação ao neutro de cinco níveis e a respectiva interligação com a rede eléctrica. Com base no modelo do conversor são realizadas simulações numéricas desenvolvidas em Matlab-Simulink. Para controlo do trânsito de energia no conversor é utilizando controlo por modo de deslizamento aplicado às correntes nas fases. As simulações efectuadas são comparadas com resultados de simulação obtidos para um ondulador clássico de dois níveis. Resultados de simulação do conversor multinível são posteriormente comparados com resultados experimentais para diferentes valores de potências activa e reactiva. Foi desenvolvido um protótipo experimental de um conversor multinível com díodos de ligação ao neutro de cinco níveis e a respectiva electrónica associada para comando e disparo dos semicondutores de potência.
Resumo:
Projeto de intervênção apresentado à Escola Superior de Educação para a obtenção do grau de mestre em Didática da Língua Portuguesa em 1º e 2º Ciclos do Ensino Básico
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo Automação e Electrónica Industrial
Resumo:
Conceitos como Globalização, Internacionalização, Localização e Tradução surgem, na realidade da indústria da língua, com uma grande interligação, mas com perspectivas nem sempre concordantes. O nosso trabalho analisa, por isso, as diferentes definições propostas dedicando especial atenção ao conceito de localização, uma vez que o nosso projecto analisa o processo de localização de uma página Web desenvolvido num contexto empresarial real. O nosso enfoque recai mais específicamente sobre a localização de páginas Web, objecto do nosso projecto, identificando não só as suas particularidades, como também os intervenientes e o tipo de competências necessárias para o desenvolvimento de um trabalho nesta área da tradução e as ferramentas disponíveis para o profissional da tradução/ localização, de que se destacam as freeware. O processo de localização impõe metas de qualidade exigentes, pelo que, partindo da definição do conceito de qualidade, analisamos o tipo de requisitos necessários a uma correcta definição de tarefas e objectivos no contexto da localização. Esta definição de conceitos e a análise do processo de localização suportaram, em seguida, o desenvolvimento do objecto do nosso projecto - o processo de localização da página Web da empresa Pinto & Cruz, ao mesmo tempo que permitiram uma prévia identificação de todos os passos a desenvolver e do tipo de dificuldades e problemas a enfrentar. Assim, e em função das condicionantes impostas pelo modelo de gestão da página, definimos um fluxo de trabalho, em que identificamos as diferentes fases e intervenientes, mediante a utilização de uma plataforma de trabalho disponibilizada pelo webmaster do sítio em questão. O processo seguido para a localização da página é descrito, as suas especificidades documentadas e as dúvidas e dificuldades identificadas. Pretendeu-se, com o desenvolvimento deste projecto e com a descrição feita sistematizar uma abordagem ao processo e alertar para o tipo de dificuldades inerentes à sua prossecução, sobretudo para quem se dispõem a fazê-lo pela primeira vez.
Resumo:
Bologne came to globalize education in higher education, creating a unified architecture that potentiates higher education and enhances the continued interconnection of the spaces of education policy in higher education in the world, in particular in Europe. The aim of this work consists in the presentation of an identification model and skills’ classification and learning outcomes, based on the official documents of the course units (syllabus and assessment components) of a course of Higher Education. We are aware that the adoption of this model by different institutions, will contribute to interoperability learning outcomes, thus enhancing the mobility of teachers and students in the EHEA (European Higher Education Area) and third countries.
Resumo:
Este trabalho é baseado no simulador de redes PST2200 do Laboratório de Sistemas de Energia (LSE) pois está avariado com vários problemas conhecidos, designadamente: - Defeito de isolamento (disparo de diferencial), - Desregulação da velocidade da máquina primária (motor DC), - Circuito de excitação da máquina síncrona inoperacional, - Inexistência de esquemas elétricos dos circuitos do simulador, - Medidas desreguladas e com canais de medida com circuito impresso queimado. O trabalho executado foi: - O levantamento e desenho de raiz (não existe qualquer manual) dos esquemas dos 10 módulos do simulador, designadamente naqueles com avaria ou com desempenho problemático a fim de que se possa ter uma visão mais pormenorizada dos circuitos e seus problemas, por forma a intervir para os minimizar e resolver, - Foi realizado o diagnóstico de avaria do simulador e foram propostas soluções para os mesmos, - Realizaram-se as intervenções propostas e aprovadas. Nas intervenções realizadas, os princípios orientadores foram: - Aumentar a robustez do equipamento por forma a garantir a sua integridade a utilizações menos apropriados e manobras 'exóticas' próprias de alunos, que pela sua condição, estão em fase de aprendizagem, - Atualizar o equipamento, colocando-o em sintonia com o 'estado da arte', - Como fator de valorização suplementar, foi concebida e aplicada a supervisão remota do funcionamento do simulador através da rede informática. Foram detetados inúmeros erros: - Má ligação do motor de corrente continua ao variador, resultando a falta de controlo da frequência da rede do sistema, - Ligações entre painéis trocadas resultando em avarias diversas das fontes de alimentação, - Cartas eletrónicas de medidas avariadas e que além de se reparar, foram também calibradas. Devido ao mecenato da empresa Schnitt + Sohn participando monetariamente, fez-se o projeto de alteração e respetiva execução de grande parte do simulador aumentando a fiabilidade do mesmo, diminuindo assim a frequência das avarias naturais mais as que acontecem involuntariamente devido a este ser um instrumento didático. Além do trabalho elétrico, foi feito muito trabalho de chaparia para alteração de estrutura e suporte do material com diferenças de posicionamento. Neste trabalho dá-se também alguns exemplos de cálculo e simulação das redes de transporte que se pode efetuar no simulador como estudo e simulação de avarias num sistema produtivo real. Realizou-se a monitorização de dois aparelhos indicadores de parâmetros de energia (Janitza UMG96S) através duma rede com dois protocolos ethernet e profibus utilizando o plc (Omron CJ2M) como valorização do trabalho.
Resumo:
In previous works we have proposed a hybrid wired/wireless PROFIBUS solution where the interconnection between the heterogeneous media was accomplished through bridge-like devices with wireless stations being able to move between different wireless cells. Additionally, we had also proposed a worst-case timing analysis assuming that stations were stationary. In this paper we advance these previous works by proposing a worst-case timing analysis for the system’s message streams considering the effect of inter-cell mobility.
Resumo:
Fieldbus networks aim at the interconnection of field devices such as sensors, actuators and small controllers. Therefore, they are an effective technology upon which Distributed Computer Controlled Systems (DCCS) can be built. DCCS impose strict timeliness requirements to the communication network. In essence, by timeliness requirements we mean that traffic must be sent and received within a bounded interval, otherwise a timing fault is said to occur. P-NET is a multi-master fieldbus standard based on a virtual token passing scheme. In P-NET each master is allowed to transmit only one message per token visit, which means that in the worst-case the communication response time could be derived considering that the token is fully utilised by all stations. However, such analysis can be proved to be quite pessimistic. In this paper we propose a more sophisticated P-NET timing analysis model, which considers the actual token utilisation by different masters. The major contribution of this model is to provide a less pessimistic, and thus more accurate, analysis for the evaluation of the worst-case communication response time in P-NET fieldbus networks.