991 resultados para Installment schedule


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A generic, parameterisable key scheduling core is presented, which can be utilised in pipelinable private-key encryption algorithms. The data encryption standard (DES) algorithm, which lends itself readily to pipelining, is utilised to exemplify this novel key scheduling method and the broader applicability of the method to other encryption algorithms is illustrated. The DES design is implemented on Xilinx Virtex FPGA technology. Utilising the novel method, a 16-stage pipelined DES design is achieved, which can run at an encryption rate of 3.87 Gbit/s. This result is among the fastest hardware implementations and is a factor 28 times faster than software implementations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Differential Reinforcement of Alternative behaviour (DRA) (Athens & Vollmer, 2010; Cooper, Heron, & Heward, 2007) is a procedure that consists in withholding reinforcement for the targeted inappropriate behaviour while reinforcing behaviours, i.e., that have the same function, but socially more acceptable topographies. DRA has repeatedly proven to be effective in reducing problem behaviours in individuals with autism (Campbell, 2003). On the other hand, a number of single-subject research studies have provided evidence for the use of activity schedules as a means to decrease aggressive behaviour (Dooley et al., 2001; Flannery & Hemer, 1994; Lalli, Casey, Goh, & Merlinoet al., 1994). The purpose of the present study was to evaluate the effectiveness of DRA in combination with the use of an activity schedule. We compared the impact of the visual activities schedule used in combination with a DRA procedure versus the impact of the DRA procedure used alone on problem behaviour of a boy diagnosed with an Autism Spectrum Disorder. An alternating treatments design was used to compare the rate of behaviour problems in each of the two treatment conditions. DRA was delivered as treatment A, while the combination of the activities schedule and DRA was treatment B.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Self-controlled KR practice has revealed that providing participants the opportunity to control their KR is superior for motor learning compared to participants replicating the KR schedule of a self-control participant, without the choice (e.g., yoked). The purpose of the present experiment was two-fold. First, to examine the utility of a self-controlled KR schedule for learning a spatial motor task in younger and older adults and second, to determine whether a self-controlled KR schedule facilitates an increased ability to estimate one’s performance in retention and transfer. Twenty younger adults and 20 older adults practiced in either the self-control or yoked condition and were required to push and release a slide along a confined pathway using their non-dominant hand to a target distance. The retention data revealed that as a function of age, a self-controlled KR schedule facilitated superior retention performance and performance estimations in younger adults compared to their yoked counterparts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Denver and Rio Grande Railway schedule, 1881.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“Frisco Line” St. Louis and San Francisco Railway the direct line through St. Louis schedule, Jan. 9, 1882.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Union Pacific Railway from Kansas City , Omaha, St. Joseph to Denver, San Francisco, Portland, Helena, Butte, Boise, Leadville, Durango, Deadwood and all cities and mining camps in the west schedule, Jan. 15, 1882.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wabash St. Louis and Pacific Railway schedule, 1882.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iron Mountain Route Railway schedule: the great through line St. Louis, Arkansas and Texas to the Hot Springs of Arkansas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Union Pacific Railway: the Kansas and Nebraska route schedule, 1882.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is very badly burned, it includes: a schedule of construction, May 28, 1855 and value of work used for constructing the bridge crossing at Chippawa Creek, Oct. 1857. It is signed by S.D. Woodruff (3 pages, handwritten). Almost all text is illegible, 1857