864 resultados para Implementation of ERP-system
Resumo:
The research conducted for this thesis has been carried out over a two year period as part of the Mobile Tools and Technology for customer care (MOTTO) project. The project was funded under the Applied Grant scheme administered by Enterprise Ireland and Nortel Networks Ltd. It was a partnership project between Galway-Mayo Institute of Technology, University of Limerick, National University of Ireland Galway, and a global Internet and communications company, Nortel Networks. The project aimed to investigate the enabling mobile communications technologies in e-Business and mobile communications in the area of Business-to-Business (B2B) customer care. The development of the application discussed in this thesis was developed in conjunction with the Galway-Mayo Institute of Technology, University of Limerick and AMT Ireland. The decision to develop the application in the Electronics Company of AMT in Limerick came about as a result of the contact established by Mark Southern from the University of Limerick. Mark was involved in overseeing the development and assisted in establishing the user requirements.
Resumo:
Quality Management, Integrated Technical Management Systems, ITMS, Technical Elements, Environment, Occupational Health and safety, OH&S, Standards, ISO, General Regulations, Integration, Management Functions, Computer Centre, Suc-cess Concepts, Documentation, PCT, QMS, EMS, OH&S-MS, Portioning, Evaluation, Technical Cycle, Technical Compliance, Framework
Resumo:
The Drug Misuse Research Division of the Health Research Board operates the National Drug Treatment Reporting System (NDTRS). The system is used to provide epidemiological information on treated problem drug misuse in Ireland and informs policy makers, researchers and the general public. The NDTRS collates data from participating treatment centres in all Health Board areas, however a gap in information exists in that drug misusers in treatment units within prisons and those treated by General Practitioners are not included. This study aims to determine the feasibility of including these two groups to increase coverage of the NDTRS and outlines preliminary steps for their inclusion.This resource was contributed by The National Documentation Centre on Drug Use.
Resumo:
Winter maintenance, particularly snow removal and the stress of snow removal materials on public structures, is an enormous budgetary burden on municipalities and nongovernmental maintenance organizations in cold climates. Lately, geospatial technologies such as remote sensing, geographic information systems (GIS), and decision support tools are roviding a valuable tool for planning snow removal operations. A few researchers recently used geospatial technologies to develop winter maintenance tools. However, most of these winter maintenance tools, while having the potential to address some of these information needs, are not typically placed in the hands of planners and other interested stakeholders. Most tools are not constructed with a nontechnical user in mind and lack an easyto-use, easily understood interface. A major goal of this project was to implement a web-based Winter Maintenance Decision Support System (WMDSS) that enhances the capacity of stakeholders (city/county planners, resource managers, transportation personnel, citizens, and policy makers) to evaluate different procedures for managing snow removal assets optimally. This was accomplished by integrating geospatial analytical techniques (GIS and remote sensing), the existing snow removal asset management system, and webbased spatial decision support systems. The web-based system was implemented using the ESRI ArcIMS ActiveX Connector and related web technologies, such as Active Server Pages, JavaScript, HTML, and XML. The expert knowledge on snow removal procedures is gathered and integrated into the system in the form of encoded business rules using Visual Rule Studio. The system developed not only manages the resources but also provides expert advice to assist complex decision making, such as routing, optimal resource allocation, and monitoring live weather information. This system was developed in collaboration with Black Hawk County, IA, the city of Columbia, MO, and the Iowa Department of transportation. This product was also demonstrated for these agencies to improve the usability and applicability of the system.
Resumo:
LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.
Resumo:
Several accidents, some involving fatalities, have occurred on U.S. Highway 30 near the Archer Daniels Midland Company (ADM) Corn Sweeteners plant in Cedar Rapids, Iowa. A contributing factor to many of these accidents has been the large amounts of water (vapor and liquid) emitted from multiple sources at ADM's facility located along the south side of the highway. Weather and road closure data acquired from IDOT have been used to develop a database of meteorological conditions preceding and accompanying closure of Highway 30 in Cedar Rapids. An expert system and a FORTRAN program were developed as aids in decision making with regard to closure of Highway 30 near the plant. The computer programs were used for testing, evaluation, and final deployment. Reports indicate the decision tools have been successfully implemented and were judged to be helpful in forecasting road closures and in reducing costs and personnel time in monitoring the roadway.
Resumo:
The goal of this work was to move structural health monitoring (SHM) one step closer to being ready for mainstream use by the Iowa Department of Transportation (DOT) Office of Bridges and Structures. To meet this goal, the objective of this project was to implement a pilot multi-sensor continuous monitoring system on the Iowa Falls Arch Bridge such that autonomous data analysis, storage, and retrieval can be demonstrated. The challenge with this work was to develop the open channels for communication, coordination, and cooperation of various Iowa DOT offices that could make use of the data. In a way, the end product was to be something akin to a control system that would allow for real-time evaluation of the operational condition of a monitored bridge. Development and finalization of general hardware and software components for a bridge SHM system were investigated and completed. This development and finalization was framed around the demonstration installation on the Iowa Falls Arch Bridge. The hardware system focused on using off-the-shelf sensors that could be read in either “fast” or “slow” modes depending on the desired monitoring metric. As hoped, the installed system operated with very few problems. In terms of communications—in part due to the anticipated installation on the I-74 bridge over the Mississippi River—a hardline digital subscriber line (DSL) internet connection and grid power were used. During operation, this system would transmit data to a central server location where the data would be processed and then archived for future retrieval and use. The pilot monitoring system was developed for general performance evaluation purposes (construction, structural, environmental, etc.) such that it could be easily adapted to the Iowa DOT’s bridges and other monitoring needs. The system was developed allowing easy access to near real-time data in a format usable to Iowa DOT engineers.
Resumo:
Diplomityössä on tutkittu reaaliaikaisen toimintolaskennan toteuttamista suomalaisen lasersiruja valmistavan PK-yrityksen tietojärjestelmään. Lisäksi on tarkasteltu toimintolaskennan vaikutuksia operatiiviseen toimintaan sekä toimintojen johtamiseen. Työn kirjallisuusosassa on käsitelty kirjallisuuslähteiden perusteella toimintolaskennan teorioita, laskentamenetelmiä sekä teknisessä toteutuksessa käytettyjä teknologioita. Työn toteutusosassa suunniteltiin ja toteutettiin WWW-pohjainen toimintolaskentajärjestelmä case-yrityksen kustannuslaskennan sekä taloushallinnon avuksi. Työkalu integroitiin osaksi yrityksen toiminnanohjaus- sekä valmistuksenohjausjärjestelmää. Perinteisiin toimintolaskentamallien tiedonkeruujärjestelmiin verrattuna case-yrityksessä syötteet toimintolaskentajärjestelmälle tulevat reaaliaikaisesti osana suurempaa tietojärjestelmäintegraatiota.Diplomityö pyrkii luomaan suhteen toimintolaskennan vaatimusten ja tietokantajärjestelmien välille. Toimintolaskentajärjestelmää yritys voi hyödyntää esimerkiksi tuotteiden hinnoittelussa ja kustannuslaskennassa näkemällä tuotteisiin liittyviä kustannuksia eri näkökulmista. Päätelmiä voidaan tehdä tarkkaan kustannusinformaatioon perustuen sekä määrittää järjestelmän tuottaman datan perusteella, onko tietyn projektin, asiakkuuden tai tuotteen kehittäminen taloudellisesti kannattavaa.
Resumo:
Työn tavoitteena oli selvittää, kokevatko matkapuhelinalalla toimivat kanavapartnerit heitä varten suunnitellun asiakassuhdehallintajärjestelmän lisäarvopalveluna vaiko eivät. Työ toteutettiin asiakastyytyväisyystutkimuksen avulla, jossa mitattiin erilaisten partnereiden asennetta palvelua kohtaan. Työn tuloksena ilmeni, että palvelussa olevan informaation määrällä ei ollut suurta vaikutusta asiakkaiden tyytyväisyyteen. Syyt ovat pikemminkin yleisissä asenteissa vastaavia palveluja kohtaan.
Resumo:
In this study the performance measurement, a part of the research and development of the RNC, was improved by implementing counter testing to the Nokia Automation System. The automation of counter testing is a feature the customer ordered, because performing counter testing manually is rather complex. The objective was to implement an automated counter testing system, which once configured correctly, would manage to run the testing and perform the analysis. The requirements for the counter testing were first studied. It was investigated if the auto-mation of the feature was feasible in the meetings with the customer. The basic functionality required for the automation was also drawn. The technologies used in the architecture of the Nokia Automation System were studied. Based on the results of the study, a new technology, wxWidgets, was introduced. The new technology was necessary to facilitate the implementing of the required feature. Finally the implementation of the counter testing was defined and implemented. The result of this study was the automation of the counter testing method developed as a new feature for the Nokia Automation System. The feature meets the specifications and requirements set by the customer. The performing of the counter testing feature is totally automated. Only configuration of the test cases is done by the user. The customer has presented new requests to further develop the feature and there are plans by the Nokia Automation System developers to implement those in the near future. The study describes the implementation of the counter testing feature introduced. The results of the study give guidelines for further developing the feature.
Resumo:
Green IT is a term that covers various tasks and concepts that are related to reducing the environmental impact of IT. At enterprise level, Green IT has significant potential to generate sustainable cost savings: the total amount of devices is growing and electricity prices are rising. The lifecycle of a computer can be made more environmentally sustainable using Green IT, e.g. by using energy efficient components and by implementing device power management. The challenge using power management at enterprise level is how to measure and follow-up the impact of power management policies? During the thesis a power management feature was developed to a configuration management system. The feature can be used to automatically power down and power on PCs using a pre-defined schedule and to estimate the total power usage of devices. Measurements indicate that using the feature the device power consumption can be monitored quite precisely and the power consumption can be reduced, which generates electricity cost savings and reduces the environmental impact of IT.
Resumo:
According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.
Resumo:
With small and medium sized-enterprises (SMEs) taking up the majority of the global businesses, it is important they act in an environmentally responsible manner. Environmental management systems (EMS) help companies evaluate and improve their environmental impact but they often require human, financial, and temporary resources that not all SMEs can provide. This research encompasses interviews with representatives of two small enterprises in Germany to provide insights into their understanding, and knowledge of an EMS and how they perceive their responsibility towards the environment. Furthermore, it presents a toolkit created especially for small and medium-sized enterprises that serves as a simplified version of an EMS based on the ISO 14001 standard and is evaluated by the representatives of the SMEs. Some of the findings are: while being open to the idea of improving their environmental impact, SMEs do not always feel it is their responsibility to do so; they seem to lack the means to fully implement an EMS. The developed toolkit is considered useful and usable and recommendations are drawn for its future enhancement.