963 resultados para Hospital Design and Construction
Resumo:
The article focuses on the following: Cattle Perception, How to prevent Balking, Solid Fences, Flight Zone, Curved Race more Efficient, Curved Race and Crowd Pen Dimensions, Loading Ramps, Working Corral for a Large Ranch, Squeeze Chutes and Headgates, Calf Tables, Artificial Insemination Chute, New Restraint Ideas, Dipping Vats, Bruise and Injury Prevention, Washable Facilities.
Resumo:
The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.
Resumo:
A very efficient learning algorithm for model subset selection is introduced based on a new composite cost function that simultaneously optimizes the model approximation ability and model robustness and adequacy. The derived model parameters are estimated via forward orthogonal least squares, but the model subset selection cost function includes a D-optimality design criterion that maximizes the determinant of the design matrix of the subset to ensure the model robustness, adequacy, and parsimony of the final model. The proposed approach is based on the forward orthogonal least square (OLS) algorithm, such that new D-optimality-based cost function is constructed based on the orthogonalization process to gain computational advantages and hence to maintain the inherent advantage of computational efficiency associated with the conventional forward OLS approach. Illustrative examples are included to demonstrate the effectiveness of the new approach.
Design and construction of a new Drosophila species, D.synthetica, by synthetic regulatory evolution
Resumo:
Here, I merge the principles of synthetic biology1,2 and regulatory evolution3-11 to create a new species12-15 with a minimal set of known elements. Using preexisting transgenes and recessive mutations of Drosophila melanogaster, a transgenic population arises with small eyes and a different venation pattern that fulfills the criteria of a new species according to Mayr's "Biological Species Concept"7,10. The genetic circuit entails the loss of a non-essential transcription factor and the introduction of cryptic enhancers. Subsequent activation of those enhancers causes hybrid lethality. The transition from "transgenic organisms" towards "synthetic species", such as Drosophila synthetica, constitutes a safety mechanism to avoid hybridization with wild type populations and preserve natural biodiversity16-18. Drosophila synthetica is the first transgenic organism that cannot hybridize with the original wild type population but remains fertile when crossed with other transgenic animals.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.
Resumo:
The Barriga Dam (Burgos, Spain) is a unique case study because its trapezoid spillway is located on the dam body and is composed of wedge-shaped concrete blocks (WSB) that include certain relevant improvements. This note summarizes the main features of the studies, the key aspects of the final design of the WSB and their placement on the dam, and important details of the spillway design. The design team concluded the study by showing the suitability of this enhanced technology for application to small dams and ponds in the short term, even with unit flows above 5 m2/s.