913 resultados para GUARANTEED COST CONTROL


Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

本文研究了一类时变非线性系统在输入有位置约束条件下的跟踪保性能控制问题.首先对非线性对象选择合适的特征运行状况,采用瞬时线性化技术得到多个线性化控制模型,将之看作是一个线性不确定系统,提出应用基于线性矩阵不等式的跟踪保性能控制设计控制器,然后经过推导得到了满足控制约束的充分条件,以定理的形式给出了约束条件下跟踪保性能控制器存在的充分条件.最后给出了仿真算例,仿真结果表明了所提方法的有效性和可行性.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

提出了一种新的模型直升机航向控制算法。针对具有模型不确定性的直升机航向线性模型,提出了一种具有自适应机制的最优保性能控制器。该控制策略通过引入自适应机制降低固定增益控制器所固有的保守性,并且控制器的反馈增益应用线性矩阵不等式(LMIs)方法解得。理论分析和数字仿真表明所设计的控制器具有良好的鲁棒稳定性能。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Statistical Process Control (SPC) technique are well established across a wide range of industries. In particular, the plotting of key steady state variables with their statistical limit against time (Shewart charting) is a common approach for monitoring the normality of production. This paper aims with extending Shewart charting techniques to the quality monitoring of variables driven by uncertain dynamic processes, which has particular application in the process industries where it is desirable to monitor process variables on-line as well as final product. The robust approach to dynamic SPC is based on previous work on guaranteed cost filtering for linear systems and is intended to provide a basis for both a wide application of SPC monitoring and also motivate unstructured fault detection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Organisations are constantly seeking efficiency improvements for their business processes in terms of time and cost. Management accounting enables reporting of detailed cost of operations for decision making purpose, although significant effort is required to gather accurate operational data. Business process management is concerned with systematically documenting, managing, automating, and optimising processes. Process mining gives valuable insight into processes through analysis of events recorded by an IT system in the form of an event log with the focus on efficient utilisation of time and resources, although its primary focus is not on cost implications. In this paper, we propose a framework to support management accounting decisions on cost control by automatically incorporating cost data with historical data from event logs for monitoring, predicting and reporting process-related costs. We also illustrate how accurate, relevant and timely management accounting style cost reports can be produced on demand by extending open-source process mining framework ProM.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Organisations are constantly seeking efficiency gains for their business processes in terms of time and cost. Management accounting enables detailed cost reporting of business operations for decision making purposes, although significant effort is required to gather accurate operational data. Process mining, on the other hand, may provide valuable insight into processes through analysis of events recorded in logs by IT systems, but its primary focus is not on cost implications. In this paper, a framework is proposed which aims to exploit the strengths of both fields in order to better support management decisions on cost control. This is achieved by automatically merging cost data with historical data from event logs for the purposes of monitoring, predicting, and reporting process-related costs. The on-demand generation of accurate, relevant and timely cost reports, in a style akin to reports in the area of management accounting, will also be illustrated. This is achieved through extending the open-source process mining framework ProM.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objective. To assess the cost-effectiveness of bone density screening programmes for osteoporosis. Study design. Using published and locally available data regarding fracture rates and treatment costs, the overall costs per fracture prevented, cost per quality of life year (QALY) saved and cost per year of life gained were estimated for different bone density screening and osteoporosis treatment programmes. Main outcome measures. Cost per fracture prevented, cost per QALY saved, and cost per year of life gained. Results. In women over the age of 50 years, the costs per fracture prevented of treating all women with hormone replacement therapy, or treating only if osteoporosis is demonstrated on bone density screening were £32,594 or £23,867 respectively. For alendronate therapy for the same groups, the costs were £171,067 and £14,067 respectively. Once the background rate of treatment with alendronate reaches 18%, bone density screening becomes cost-saving. Costs estimates per QALY saved ranged from £1,514 to £39,076 for osteoporosis treatment with alendronate following bone density screening. Conclusions. For relatively expensive medications such as alendronate, treatment programmes with prior bone density screening are far more cost effective than those without, and in some circumstances become cost-saving. Costs per QALY of life saved and per year of life gained for osteoporosis treatment with prior bone density screening compare favourably with treatment of hypertension and hypercholesterolemia.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The ergodic or long-run average cost control problem for a partially observed finite-state Markov chain is studied via the associated fully observed separated control problem for the nonlinear filter. Dynamic programming equations for the latter are derived, leading to existence and characterization of optimal stationary policies.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This work is a survey of the average cost control problem for discrete-time Markov processes. The authors have attempted to put together a comprehensive account of the considerable research on this problem over the past three decades. The exposition ranges from finite to Borel state and action spaces and includes a variety of methodologies to find and characterize optimal policies. The authors have included a brief historical perspective of the research efforts in this area and have compiled a substantial yet not exhaustive bibliography. The authors have also identified several important questions that are still open to investigation.