988 resultados para Flood damage prevention


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"February, 1986."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"February, 1989."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Volume 2 is Executive summary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"October, 1994."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"October, 1985."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"OWR/SPR/98-001"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"The Illinois Department of Natural Resources/Office of Water Resources (OWR) is cooperating with the Village of Davis Junction to construct a flood control project under the authority of the Flood Control Act of 1945, 615 ILCS 15 (1996 State Bar Edition)."--Leaf 1.