97 resultados para Fencing


Relevância:

10.00% 10.00%

Publicador:

Resumo:

A large-scale, outdoor, pervasive computing system based on the Fleck hardware platform applies sensor network technology to farming. Comprising static and animal-borne mobile nodes, the system measures the state of a complex, dynamic system comprising climate, soil, pasture, and animals. This data supports prediction of the land's future state and improved management outcomes through closed-loop control. This article is part of a special issue, Building a Sensor-Rich World.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Plant growth can be limited by resource acquisition and defence against consumers, leading to contrasting trade-off possibilities. The competition-defence hypothesis posits a trade-off between competitive ability and defence against enemies (e.g. herbivores and pathogens). The growth-defence hypothesis suggests that strong competitors for nutrients are also defended against enemies, at a cost to growth rate. We tested these hypotheses using observations of 706 plant populations of over 500 species before and following identical fertilisation and fencing treatments at 39 grassland sites worldwide. Strong positive covariance in species responses to both treatments provided support for a growth-defence trade-off: populations that increased with the removal of nutrient limitation (poor competitors) also increased following removal of consumers. This result held globally across 4 years within plant life-history groups and within the majority of individual sites. Thus, a growth-defence trade-off appears to be the norm, and mechanisms maintaining grassland biodiversity may operate within this constraint.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This two-year study examined the impacts of feral pig diggings on five ecological indicators: seedling survival, surface litter, subsurface plant biomass, earthworm biomass and soil moisture content. Twelve recovery exclosures were established in two habitats (characterised by wet and dry soil moisture) by fencing off areas of previous pig diggings. A total of 0.59 ha was excluded from further pig diggings and compared with 1.18 ha of unfenced control areas. Overall, seedling numbers increased 7% within the protected exclosures and decreased 37% within the unprotected controls over the two-year study period. A significant temporal interaction was found in the dry habitat, with seedling survival increasing with increasing time of protection from diggings. Feral pig diggings had no significant effect on surface litter biomass, subsurface plant biomass, earthworm biomass or soil moisture content.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wild canids (wild dogs and European red foxes) cause substantial losses to Australian livestock industries and environmental values. Both species are actively managed as pests to livestock production. Contemporaneously, the dingo proportion of the wild dog population, being considered native, is protected in areas designated for wildlife conservation. Wild dogs particularly affect sheep and goat production because of the behavioural responses of domestic sheep and goats to attack, and the flexible hunting tactics of wild dogs. Predation of calves, although less common, is now more economically important because of recent changes in commodity prices. Although sometimes affecting lambing and kidding rates, foxes cause fewer problems to livestock producers but have substantial impacts on environmental values, affecting the survival of small to medium-sized native fauna and affecting plant biodiversity by spreading weeds. Canid management in Australia relies heavily on the use of compound 1080-poisoned baits that can be applied aerially or by ground. Exclusion fencing, trapping, shooting, livestock-guarding animals and predator calling with shooting are also used. The new Invasive Animals Cooperative Research Centre has 40 partners representing private and public land managers, universities, and training, research and development organisations. One of the major objectives of the new IACRC is to apply a strategic approach in order to reduce the impacts of wild canids on agricultural and environmental values in Australia by 10%. In this paper, the impacts, ecology and management of wild canids in Australia are briefly reviewed and the first cooperative projects that will address IACRC objectives for improving wild dog management are outlined.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Australia, the development of rangelands has led to steady gains in pastoral productivity through more intensive and widespread land use (Stokes et al., 2006). Opportunities to benefit from intensification exist on large properties with relatively poor water and fencing infrastructure development, resulting in uneven utilisation of available forage (Ash et al.,2006). The objective of this study is to value expected economic gains from carrying out property improvements on a beef property located in Northern Australia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

1. The successful introduction of the red fox Vulpes vulpes into Australia in the 1870s has had dramatic and deleterious impacts on both native fauna and agricultural production. Historical accounts detail how the arrival of foxes in many areas coincided with the local demise of native fauna. Recent analyses suggest that native fauna can be successfully reintroduced to their former ranges only if foxes have been controlled, and several replicated removal experiments have confirmed that foxes are the major agents of extirpation of native fauna. Predation is the primary cause of losses, but competition and transmission of disease may be important for some species. 2. In agricultural landscapes, fox predation on lambs can cause losses of 1–30%; variation is due to flock size, health and management, as well as differences in the timing and duration of lambing and the density of foxes. 3. Fox control measures include trapping, shooting, den fumigation and exclusion fencing; baiting using the toxin 1080 is the most commonly employed method. Depending on the baiting strategy, habitat and area covered, baiting can reduce fox activity by 50–97%. We review patterns of baiting in a large sheep-grazing region in central New South Wales, and propose guidelines to increase landholder awareness of baiting strategies, to concentrate and coordinate bait use, and to maximize the cost-effectiveness of baiting programs. 4. The variable reduction in fox density within the baited area, together with the ability of the fox to recolonize rapidly, suggest that current baiting practices in eastern Australia are often ineffective, and that reforms are required. These might include increasing landholder awareness and involvement in group control programs, and the use of more efficient broadscale techniques, such as aerial baiting.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Beef cattle grazing is the dominant land use in the extensive tropical and sub-tropical rangelands of northern Australia. Despite the considerable knowledge on land and herd management gained from both research and practical experience, the adoption of improved management is limited by an inability to predict how changes in practices and combinations of practices will affect cattle production, economic returns and resource condition. To address these issues, past Australian and international research relating to four management factors that affect productivity and resource condition was reviewed in order to identify key management principles. The four management factors considered were stocking rates, pasture resting, prescribed fire, and fencing and water point development for managing grazing distribution. Four management principles for sound grazing management in northern Australia were formulated as follows: (1) manage stocking rates to meet goals for livestock production and land condition; (2) rest pastures to maintain them in good condition or to restore them from poor condition to increase pasture productivity; (3) devise and apply fire regimes that enhance the condition of grazing land and livestock productivity while minimising undesirable impacts; and (4) use fencing and water points to manipulate grazing distribution. Each principle is supported by several more specific guidelines. These principles and guidelines, and the supporting research on which they are based, are presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Rainfall variability is a major challenge to sustainable grazing management in northern Australia, with management often complicated further by large, spatially-heterogeneous paddocks. This paper presents the latest grazing research and associated bio-economic modelling from northern Australia and assesses the extent to which current recommendations to manage for these issues are supported. Overall, stocking around the safe long-term carrying capacity will maintain land condition and maximise long-term profitability. However, stocking rates should be varied in a risk-averse manner as pasture availability varies between years. Periodic wet-season spelling is also essential to maintain pasture condition and allow recovery of overgrazed areas. Uneven grazing distributions can be partially managed through fencing, providing additional water-points and in some cases patch-burning, although the economics of infrastructure development are extremely context-dependent. Overall, complex multi-paddock grazing systems do not appear justified in northern Australia. Provided the key management principles outlined above are applied in an active, adaptive manner, acceptable economic and environmental outcomes will be achieved irrespective of the grazing system applied.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

HIGHLIGHTS FOR FY 2008 1. Completed the first of a two-year Gulf sturgeon population study on the Choctawhatchee River, Florida. The sub adult and adult Gulf sturgeon population was estimated at 2,800 fish. 2. Gulf sturgeon eggs were collected at three hard bottom sites in the Apalachicola River, Florida; two sites were previously confirmed spawning areas and one was a newly confirmed spawning area. 3. Documented 55 potential environmental threats to Gulf sturgeon spawning habitat in the Pea River, Florida and Alabama. 4. Assigned the Eglin AFB Road-Stream Crossing Working Group to guide the closure, repair and maintenance of roads and road stream crossings that impact threatened and endangered species. 5. Conducted 81 assessments of fish and stream invertebrates on and in watersheds surrounding Eglin AFB. 6. Provided technical support for the 5-year status review and reclassification proposed rule for the Okaloosa darter. 7. Initiated an intensive population genetic analysis of the Okaloosa darter throughout its range. Tissues from over 200 Okaloosa darters were collected and analyzed. 8. Established a GIS database to serve as a host for data from any sites sampled for mussels in Northeast Gulf of Mexico drainages. 9. Conducted habitat surveys at 115 locations in the Apalachicola River to assess the effects of drought-related mussel mortality and strandings, evaluate habitat conditions, and assess population demography. 10. A land use/aerial imagery threats assessment data analysis was completed for the Chipola River. A total of 266 impoundments/borrow pits and 471 unpaved road crossings were identified among the threats. 11. Okaloosa darters marked with elastomeric dyes were monitored in Mill Creek, Eglin AFB, to determine movement and habitat use following completion of a fish passage project. 3 12. Partners for Fish and Wildlife funded a streambank and riparian restoration project on Econfina Creek consisting of 3,900 feet of streambank fencing to exclude cattle access. One acre of riparian floodplain was planted with native trees. 13. We provided design and on-the-ground assistance for restoring surface hydrology at St. Vincent NWR. The project restored approximately 1.5 miles of tidal stream and 100 acres of wetlands. 14. A study was completed on 11 coastal streams to document large wood debris relationships with fluvial geomorphic characteristics. 15. We developed a Population Viability Analysis model for the fat threeridge mussel to determine current and future risk of extinction. 17. A Gulf Sturgeon Friends Group, “Gulf Sturgeon Preservation Society” was organized in FY 08. 18. Multiple outreach projects were completed to detail aquatic resource conservation needs and opportunities, including National Fishing Week, Earth Day, several festivals and school outreach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To estimate the relative importance of the most common predators of Clarias gariepinus fry, increasing levels of protection were afforded to exclude amphibians, aquatic arthropods and birds. At a stocking density of 10 larvae/sq.m. in nursing ponds, fencing off amphibians resulted in a 28 per cent decrease in mortality. Holding fry in hapas to protect them from both amphibians and aquatic arthropods decreased mortality by an insignificant 5.7 per cent. Installation of bird-netting over the hapas reduced mortality by 21.7 per cent. The remaining 4.9 per cent of total mortality, which could not be explained, was attributed to opportunistic cannibalism, disease and/or handling stress. Increasing stocking density to 40/sq. m. and, thus, reducing the food available per fry increased mortality by 28.3 per cent.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this monitoring project was to determine the baseline condition for a 960-m long stream reach and its associated streamside zone, which terminates at the confluence with the Deschutes River. This stream reach had been damaged heavily in the February 1996 flood and had also received many years of overuse by livestock grazing. The monitoring project was conducted in July 1997 just after installation of riparian exclosure fencing. Future resurvey of the study area will allow determination of progress made in ecological recovery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fishing using electricity is a new technique and is still in the experimental stages in many of the advanced countries. While no published records are available in India, considerable work has been done in Germany, United States, Canada, and United Kingdom. These papers mainly deal with the behavior of the fish in the electrical field, the physiological effects of electrical current on fishes, methods of electrofishing, electric fencing etc. The following experiments on electrical fishing were conducted with a view to studying the distribution of electrical field when an alternating current is passed through two fixed electrodes in fresh water and to study the reaction of different fresh water fishes to the field.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The otter belongs to the family Muslelidae of the super family Canoidea. It is a mammal related to the stoat, skunk, marten and wolverine. Its habitat is the water, and it is carnivorous in diet, feeding on fish and other water animals. In Uganda, the otter is widely distributed throughout the western region, and most other parts of the country. To protect fish farmers from the otter, the Fisheries Department recommends fencing the ponds to keep out the otters or trapping to kill them.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

采用样方法研究了首曲湿地功能区"黑土滩"退化草甸改良后3 a的群落特征变化,分析了围栏封育和补播"高寒1号"生态组合草种对退化草甸的恢复改良效果.结果显示:仅封育3 a后,"黑土滩"退化草甸群落的盖度、高度、地上生物量和可食牧草比例均显著提高,丰富度指数由0.55增加到0.75,多样性指数由0.07增加到了0.25;封育后补播"高寒1号"生态草种相对于封育前,使得退化草甸的盖度增加了56.00%,高度增加了11.74 cm,地上生物量增加了222.24 g/m~2,可食牧草比例增加了55.98%,物种数由5种/m~2增加到了15种/m~2,丰富度指数由0.55增加到了3.29,多样性指数由0.07增加到了1.85,均匀度指数由0.06增加到了0.27.相对围栏封育而言,封育后补播是一种更有效的"黑土滩"退化草甸改良恢复措施.围栏封育和补播配套实施可以显著改善"黑土滩"退化草地的群落貌相、草地生产力和组分结构状况.