896 resultados para Fault compensation
Resumo:
The wavelet packet transform decomposes a signal into a set of bases for time–frequency analysis. This decomposition creates an opportunity for implementing distributed data mining where features are extracted from different wavelet packet bases and served as feature vectors for applications. This paper presents a novel approach for integrated machine fault diagnosis based on localised wavelet packet bases of vibration signals. The best basis is firstly determined according to its classification capability. Data mining is then applied to extract features and local decisions are drawn using Bayesian inference. A final conclusion is reached using a weighted average method in data fusion. A case study on rolling element bearing diagnosis shows that this approach can greatly improve the accuracy ofdiagno sis.
Resumo:
Approaches with Vertical Guidance (APV) can provide greater safety and cost savings to general aviation through accurate GPS horizontal and vertical navigation. However, GPS needs augmentation to achieve APV fault detection requirements. Aircraft Based Augmentation Systems (ABAS) fuse GPS with additional sensors at the aircraft. Typical ABAS designs assume high-quality inertial sensors with Kalman filters but these are too expensive for general aviation. Instead of using high-quality (and expensive) sensors, the purpose of this paper is to investigate augmenting GPS with a low-quality MEMS IMU and Aircraft Dynamic Model (ADM). The IMU and ADM are fused together using a multiple model fusion strategy in a bank of Extended Kalman Filters (EKF) with the Normalized Solution Separation (NSS) fault detection scheme. A tightly-coupled configuration with GPS is used and frequent GPS updates are applied to the IMU and ADM to compensate for their errors. Based upon a simulated APV approach, the performance of this architecture in detecting a GPS ramp fault is investigated showing a performance improvement over a GPS-only “snapshot” implementation of the NSS method. The effect of fusing the IMU with the ADM is evaluated by comparing a GPS-IMU-ADM EKF with a GPS-IMU EKF where a small improvement in protection levels is shown.
Resumo:
The objective of this investigation was to compare the acute effects of exercise and diet manipulations on energy intake, between dietary restrained and unrestrained females. Comparisons of two studies using an identical 2 x 2 repeated-measures design (level of activity (rest or exercise) and lunch type (high-fat or low-fat)) including thirteen dietary unrestrained and twelve restrained females were performed. Energy expenditure during the rest session was estimated and the energy cost of exercise was measured by indirect calorimetry. Relative energy intake was calculated by subtracting the energy expenditure of the exercise session from the energy intake of the test meal. Post-meal hedonic ratings were completed after lunch. Energy intake and relative energy intake increased during high-fat conditions compared with the low-fat, independently of exercise (P < 0.001). There was a positive relationship between dietary restraint scores and energy intake or relative energy intake in the rest conditions only (r 0.54, P < 0.01). The decrease of relative energy intake between the rest and exercise conditions was higher in restrained than in unrestrained eaters (P < 0.01). These results confirm that a high-fat diet reversed the energy deficit due to exercise. There was no energy compensation in response to an acute bout of exercise during the following meal. In restrained eaters, exercise was more effective in creating an energy deficit than in unrestrained eaters. Exercise may help restrained eaters to maintain control over appetite.
Resumo:
Various load compensation schemes proposed in literature assume that voltage source at point of common coupling (PCC) is stiff. In practice, however, the load is remote from a distribution substation and is supplied by a feeder. In the presence of feeder impedance, the PWM inverter switchings distort both the PCC voltage and the source currents. In this paper load compensation with such a non-stiff source is considered. A switching control of the voltage source inverter (VSI) based on state feedback is used for load compensation with non-stiff source. The design of the state feedback controller requires careful considerations in choosing a gain matrix and in the generation of reference quantities. These aspects are considered in this paper. Detailed simulation and experimental results are given to support the control design.
Resumo:
High reliability of railway power systems is one of the essential criteria to ensure quality and cost-effectiveness of railway services. Evaluation of reliability at system level is essential for not only scheduling maintenance activities, but also identifying reliability-critical components. Various methods to compute reliability on individual components or regularly structured systems have been developed and proven to be effective. However, they are not adequate for evaluating complicated systems with numerous interconnected components, such as railway power systems, and locating the reliability critical components. Fault tree analysis (FTA) integrates the reliability of individual components into the overall system reliability through quantitative evaluation and identifies the critical components by minimum cut sets and sensitivity analysis. The paper presents the reliability evaluation of railway power systems by FTA and investigates the impact of maintenance activities on overall reliability. The applicability of the proposed methods is illustrated by case studies in AC railways.
Resumo:
Fault tree analysis (FTA) is presented to model the reliability of a railway traction power system in this paper. First, the construction of fault tree is introduced to integrate components in traction power systems into a fault tree; then the binary decision diagram (BDD) method is used to evaluate fault trees qualitatively and quantitatively. The components contributing to the reliability of overall system are identified with their relative importance through sensitivity analysis. Finally, an AC traction power system is evaluated by the proposed methods.
Resumo:
Many of the power utilities around the world experienced spurious tripping of directional earth fault relays in their mesh distribution networks due to induced circulating currents. This circulating current is zero sequence and induced in the healthy circuit due to the zero sequence current flow resulting from a ground fault of a parallel circuit. This paper quantitatively discusses the effects of mutual coupling on earth fault protection of distribution systems. An actual spurious tripping event is analyzed to support the theory and to present options for improved resilience to spurious tripping.
Resumo:
The Acquisition of Land Act 1967 (Qld) (‘the Act’) deals with the acquisition of land by the State for public purposes and provides for compensation. The issue that arose for determination in Sorrento Medical Service Pty Ltd v Chief Executive, Dept of Main Roads [2007] QCA 73 was whether the appellant was entitled to claim compensation under the Act in respect of land resumed by the Main Roads Department over which the appellant had an exclusive contractual licence for car parking spaces for use in association with a medical centre leased by the appellant. At first instance, it was held by the Land Court that the appellant was not entitled to compensation for the resumption of the car parking spaces. The basis for this decision by the Land Court was that a right to compensation only exists where resumption has taken some proprietary interest of the claimant in the land. Following an appeal to the Land Appeal Court being dismissed, the appellant instituted the present appeal to the Queensland Court of Appeal (McMurdo P, Holmes JA and Chesterman J).
Resumo:
This was the question that confronted Wilson J in Jarema Pty Ltd v Michihiko Kato [2004] QSC 451. Facts The plaintiff was the buyer of a commercial property at Bundall. The property comprised a 6 storey office building with a basement car park with 54 car parking spaces. The property was sold for $5 million with the contract being the standard REIQ/QLS form for Commercial Land and Buildings (2nd ed GST reprint). The contract provided for a “due diligence” period. During this period, the buyer’s solicitors discovered that there was no direct access from a public road to the car park entrance. Access to the car park was over a lot of which the Gold Coast City Council was the registered owner under a nomination of trustees, the Council holding the property on trust for car parking and town planning purposes. Due to the absence of a registered easement over the Council’s land, the buyer’s solicitors sought a reduction in the purchase price. The seller would not agree to this. Finally the sale was completed with the buyer reserving its rights to seek compensation.