993 resultados para Factory management.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of the survey was to gain a better understanding of the role of factory agents in buying fish and setting prices, and of their place and role in fisheries co-management on Lake Victoria, Uganda.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The concept of sustainable manufacturing is a form of pollution prevention that integrates environmental considerations in the production of goods while focusing on efficient resource use. Taking the industrial ecology perspective, this efficiency comes from improved resource flow management. The assessment of material, energy and waste resource flows, therefore, offers a route to viewing and analysing a manufacturing system as an ecosystem using industrial ecology biological analogy and can, in turn, support the identification of improvement opportunities in the material, energy and waste flows. This application of industrial ecology at factory level is absent from the literature. This article provides a prototype methodology to apply the concepts of industrial ecology using material, energy and waste process flows to address this gap in the literature. Various modelling techniques were reviewed and candidates selected to test the prototype methodology in an industrial case. The application of the prototype methodology showed the possibility of using the material, energy and waste resource flows through the factory to link manufacturing operations and supporting facilities, and to identify potential improvements in resource use. The outcomes of the work provide a basis to build the specifications for a modelling tool that can support those analysing their manufacturing system to improve their environmental performance and move towards sustainable manufacturing. © IMechE 2012.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the intention of introducing unique and value-added products to the market, organizations have become more conscious of how to best create knowledge as reported by Ganesh Bhatt in 2000 in 'Information dynamics, learning and knowledge creation in organizations'. Knowledge creation is recognized as having an important role in generating and sustaining a competitive advantage as well as in meeting organizational goals, as reported by Aleda Roth and her colleagues in 1994 in 'The knowledge factory for accelerated learning practices.' One of the successful ingredients of value management (VM) is its utilization of diverse knowledge resources, drawing upon different organizational functions, professional disciplines, and stakeholders, in a facilitated team process. Multidisciplinary VM study teams are viewed as having high potential to innovate due to their heterogeneous nature. This paper looks at one of the VM workshop's major benefits, namely, knowledge creation. A case study approach was used to explore the nature, processes, and issues associated with fostering a dynamic knowledge creation capability within VM teams. The results indicate that the dynamic knowledge creating process is embedded in and influenced by managing team constellation, creating shared awareness, developing shared understanding, and producing aligned action. The catalysts that can speed up the processes are open dialogue and discussion among participants. This process is enhanced by the use of facilitators, skilled at extracting knowledge.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The South Carolina Department of Natural Resources provides maps to recreational and state shellfish grounds, available to the public for recreational harvesting or to commercial harvest. This map shows the location of Lachicotte Oyster Factory PSG - R355 Recreational Shellfish Ground in Georgetown County.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work project is a business plan for a project regarding corporate social entrepreneurship that will be developed by Siemens Switchboard Factory in Corroios. The main purpose of this project is to understand the viability of a partnership between Siemens AG’s and CERCISA in order to include disabled people into Siemens AG’s Energy Management Division, with the goal of achieving social and economic impact by insources activities while complying with the law1. The produced output, a business plan, aims to study and understand the practical suitability and feasibility of the concepts and propose a sustainable project that can be replicated, starting with a pilot testing and validation period.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pour répondre aux exigences du gouvernement fédéral quant aux temps d’attente pour les chirurgies de remplacement du genou et de la hanche, les établissements canadiens ont adopté des stratégies de gestion des listes d’attentes avec des niveaux de succès variables. Notre question de recherche visait à comprendre Quels facteurs ont permis de maintenir dans le temps un temps d’attente répondant aux exigences du gouvernement fédéral pendant au moins 6-12 mois? Nous avons développé un modèle possédant quatre facteurs, inspiré du modèle de Parsons (1977), afin d’analyser les facteurs comprenant la gouvernance, la culture, les ressources, et les outils. Trois études de cas ont été menées. En somme, le 1er cas a été capable d’obtenir les exigences pendant six mois mais incapable de les maintenir, le 2e cas a été capable de maintenir les exigences > 18 mois et le 3e cas a été incapable d’atteindre les objectifs. Des documents furent recueillis et des entrevues furent réalisées auprès des personnes impliquées dans la stratégie. Les résultats indiquent que l’hôpital qui a été en mesure de maintenir le temps d’attente possède certaines caractéristiques: réalisation exclusive de chirurgie de remplacement de la hanche et du genou, présence d’un personnel motivé, non distrait par d’autres préoccupations et un esprit d’équipe fort. Les deux autres cas ont eu à faire face à une culture médicale moins homogène et moins axés sur l’atteinte des cibles; des ressources dispersées et une politique intra-établissement imprécise. Le modèle d’hôpital factory est intéressant dans le cadre d’une chirurgie surspécialisée. Toutefois, les patients sont sélectionnés pour des chirurgies simples et dont le risque de complication est faible. Il ne peut donc pas être retenu comme le modèle durable par excellence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: – The purpose of this paper is to document the progress made in a specified period and the experience of managers and staff in sustaining the high performance team approach in a plastics factory.

Design/methodology/approach: – Single-case analysis was conducted on data collected through semi-structured interviews and site observations made with two managers and one team of six in a multinational plastics manufacturer (Visy) headquartered in Australia.

Findings: – Based on the authors' experiences and literature review a successful high performance team requires clear targets and efficiency standards, communication, rules of behaviour, continual input of facts and feedback, and last but not least – recognition of successes.

Research limitations/implications: – The findings are based on observations and interviews conducted in one part of a multinational organization in Australia. No follow-up interviews could be undertaken to track the progress.

Originality/value: – No other similar study had been undertaken in this organisation documenting the experiences of a quality improvement team and its interactions with managers. The findings have practical implications for industrial and other kinds of organisations engaged in implementing quality improvements through enhanced teamwork.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Often manufacturing enterprises will maintain high levels of Work In Progress (WIP) to maximise production throughput. Using computer simulation, this thesis investigates a manufacturing facility and identifies an optimal level of WIP. At this optimum throughput is maximised, manufacturing lead times are minimised, and the WIP level is significantly reduced.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of the ice cream factory concerned in this study strongly felt the importance of undertaking a waste audit of its biggest waste generator, the ice cream plant. Ice cream wastewater constitutes as much as 74% of the total volume of wastewater discharged by the company to the central treatment plant of the Industrial Estate in which the factory is situated. Generation of ice cream wastes is attributed to the high consumptive use of water in the plant for washing and cleaning operations. As a result of waste auditing, methods were proposed to save water and to segregate the waste, and to modify the existing wastewater treatment system of the ice cream plant for better treatment efficiency.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Issue addressed: Worksites are a promising setting for health promotion initiatives. While there is an accumulated body of evidence indicating favourable health and cost outcomes, there have been difficulties identified in recruiting and influencing blue- collar workers. This descriptive study aimed to identify specific opportunities and barriers which may impact upon physical activity options at work for male blue-collar factory workers.

Methods: Fifteen manager interviews and worksite observations, and eight employee group discussions were conducted in manufacturing industry worksites.

Results: Several key barriers emerged which limit opportunities for blue-collar employees to participate in physical activity at work: time constraints; limited facilities; and lack of interest from management to facilitate physical activity due to limited resources and concerns about safety issues. Potential opportunities included the presence of change rooms, showers, outdoor areas suitable for physical activity, nearby parks and local fitness facilities, and occupational health and safety committees.

Conclusions: Increasing opportunities for workers to be active at work did not emerge as a priority of managers who may need to be convinced that allocating time and resources to physical activity is a wise investment and that workers need an environment that both supports and encourages participation in physical activity. The role of physical activity in relation to injury prevention and potential reductions in Workcover premiums is worthy of further investigation.

So what? While worksite physical activity promotion is a national health objective, there are numerous actual and perceived barriers to initiatives directed at factory workers. Rather than offering specific programs, it may be more productive to address work practices and environmental and regulatory barriers through established occupational health and safety channels. Information and education strategies to change the attitudes and beliefs of management and workers about these issues, as well as about the health benefits of physical activity, may also be helpful.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper details a system dynamics model developed to simulate proposed changes to water governance through the integration of supply, demand and asset management processes. To effectively accomplish this, interconnected feedback loops in tariff structures, demand levels and financing capacity are included in the model design, representing the first comprehensive life-cycle modelling of potable water systems. A number of scenarios were applied to Australia's populated South-east Queensland region, demonstrating that introducing temporary drought pricing (i.e. progressive water prices set inverse with availability), in conjunction with supply augmentation through rain-independent sources, is capable of efficiently providing water security in the future. Modelling demonstrated that this alternative tariff structure reduced demand in scarcity periods thereby preserving supply, whilst revenues are maintained to build new water supply infrastructure. In addition to exploring alternative tariffs, the potential benefits of using adaptive pressure-retarded osmosis desalination plants for both potable water and power generation was explored. This operation of these plants for power production, when they would otherwise be idle, shows promise in reducing their net energy and carbon footprints. Stakeholders in industry, government and academia were engaged in model development and validation. The constructed model displays how water resource systems can be reorganised to cope with systemic change and uncertainty.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O trabalho tem como objetivo avaliar e descrever analiticamente a implementação de práticas de manufatura enxuta pela Pirelli Pneus no seu complexo industrial da América Latina. Além de uma descrição estruturada e ampla dos princípios de produção de Toyota e fundamentos teóricos do Lean thinking, uma ênfase especial será dedicada ao projeto EGR (Especialistas em Gestão da Rotina), como uma ferramenta estratégica para ser usada pela empresa multinacional italiana no futuro próximo, de modo a alcançar um resultado mais eficaz e eficiente na gestão da rotina diária. Este projeto, que representa um componente significativo do Pirelli Manufacturing System (PMS) e, principalmente, voltado para supervisores e gestores de plantas, consiste principalmente em ajudar a empresa a desenvolver a capacidade empresarial para avaliar corretamente o gap potencial existente entre os resultados atuais e os esperados, para tanto entender os desvios, bem como as causas subjacentes, e melhorar continuamente o desempenho da empresa por meio da padronização de processos e redução de desperdicios. Esses objetivos podem ser perseguidos, atuando em dois meios essenciais: habilidades técnicas e comportamentais de liderança para apoiar cada equipe de projeto; uma maior eficácia na gestão de indicadores de desempenho nas diferentes unidades de fábrica, de acordo com KPIs estabelecidos no nível central pelo Head Quarter. Além disso, a investigação será focada na experiência peculiar da planta de Santo André, onde o EGR começou como piloto, com o objetivo de captar as alterações relevantes (no lado organizacional e econômico) que este projeto trouxe para a empresa, através da realização de pesquisa de campo e entrevistas, que são orientados a recolher provas, considerações e opiniões de todos os principais atores envolvidos.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The mutagenic activity of waste material originating from an aluminum products factory was determined by the Salmonella/microsome assay, using the bacterial strains TA100, TA98 and YG1024. The material was obtained by sweeping the factory floor at the end of the work shift. Organic compounds were extracted by ultrasound for 30 min in dichloromethane or 70% ethanol. After evaporation of solvent, these extracts were dissolved in dimethylsulfoxide, and tested for the mutagenic activity at varying concentrations. All the extracts from the factory had mutagenic activity, especially in the YG1024 strain, suggesting the presence of aromatic amines, later confirmed by chemical analysis. The TA98 strain also showed mutagenic activity, though it did not exhibit the highest mutagenicity index observed with the YG1024 strain. In TA100, mutagenic activity was not observed. This study should serve as an alert to management and those who are occupationally exposed, and as a warning that this type of waste should not be discarded in the environment without any control. (C) 2004 Elsevier Ltd. All rights reserved.