984 resultados para Facility Design and Construction.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The article focuses on the following: Cattle Perception, How to prevent Balking, Solid Fences, Flight Zone, Curved Race more Efficient, Curved Race and Crowd Pen Dimensions, Loading Ramps, Working Corral for a Large Ranch, Squeeze Chutes and Headgates, Calf Tables, Artificial Insemination Chute, New Restraint Ideas, Dipping Vats, Bruise and Injury Prevention, Washable Facilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A very efficient learning algorithm for model subset selection is introduced based on a new composite cost function that simultaneously optimizes the model approximation ability and model robustness and adequacy. The derived model parameters are estimated via forward orthogonal least squares, but the model subset selection cost function includes a D-optimality design criterion that maximizes the determinant of the design matrix of the subset to ensure the model robustness, adequacy, and parsimony of the final model. The proposed approach is based on the forward orthogonal least square (OLS) algorithm, such that new D-optimality-based cost function is constructed based on the orthogonalization process to gain computational advantages and hence to maintain the inherent advantage of computational efficiency associated with the conventional forward OLS approach. Illustrative examples are included to demonstrate the effectiveness of the new approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is focused on developing a highly detailed understanding of current organisational interactions and information flows leading to a definition of the process model for the environment into which information and communication technology (ICT) applications will be placed. The authors of this paper propose a theoretical process model and the associated detailed information structure which reflects the complexity of information, stakeholder interaction and intellectual property concerns which are currently seen in the construction industry. This is being developed and tested against a field study renovation project. The field study project identifies information flows and interactions between stakeholders such as designers, project managers, clients, contractors, subcontractors and suppliers. The process model which is being established shows very high levels of complexity in dependencies and interdependencies between implicit and explicit information within the project design and construction teams. Without an understanding of these detailed and complex process interactions, proposals for the application of ICT to the construction industry will not reflect the requirements of those for whom they are being developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents design, construction, and evaluation of a micropump for drug delivery applications. The proposed micropump consists of three components: fluidics, electronics, and software. The fluidics component includes a silicone elastic diaphragm, a microservo, housing and two check valves. The diaphragm is modeled and simulated to establish its geometrical specifications. The housing is built using a rapid prototype machine. The electronics component consists of a microcontroller, a microswitch array, a simple display and a power unit. The software component is written in C and receives inputs from user, controls the microservo speed and displays the programmed speed. A number of experiments are conducted to evaluate the performance and capabilities of the micropump. The experiments focus on measurement of flow rate, dosage and duration of operation. A discussion of the performance and capabilities of the developed micropump is also given.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Here, I merge the principles of synthetic biology1,2 and regulatory evolution3-11 to create a new species12-15 with a minimal set of known elements. Using preexisting transgenes and recessive mutations of Drosophila melanogaster, a transgenic population arises with small eyes and a different venation pattern that fulfills the criteria of a new species according to Mayr's "Biological Species Concept"7,10. The genetic circuit entails the loss of a non-essential transcription factor and the introduction of cryptic enhancers. Subsequent activation of those enhancers causes hybrid lethality. The transition from "transgenic organisms" towards "synthetic species", such as Drosophila synthetica, constitutes a safety mechanism to avoid hybridization with wild type populations and preserve natural biodiversity16-18. Drosophila synthetica is the first transgenic organism that cannot hybridize with the original wild type population but remains fertile when crossed with other transgenic animals.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.