917 resultados para Environmental Management Plan
Resumo:
"Prepared in accordance with Section 102(2)(C) of P.L.91-190 ; USDA-FS-FES(ADM)-74-50."
Resumo:
"USDA-FS-FES (Adm) R4-75-18."
Resumo:
Mode of access: Internet.
Resumo:
"A federal/state partnership for the protection of humpback whales and their habitat."
Resumo:
"Prepared for the Illinois Institute of Natural Resources and the Illinois Environmental Protection Agency"--Cover
Resumo:
"October 2003."
Resumo:
"BLM-WY-ES-84-017-4332"--Vol. [1], p. [3] of cover.
Resumo:
"For use in conjunction with the proposed RMP"--P. [2] of cover, v. 1.
Resumo:
Eight maps on folded sheets in 2 pockets.
Resumo:
"NPS D-10B"--P. [3] of cover.
Resumo:
"NPS D-18A"--P. [3] of cover.
Resumo:
"NPS D-8"--P. [3] of cover.
Resumo:
Mode of access: Internet.
Resumo:
Construction and demolition waste management is becoming increasingly important on construction sites as landfill space in Ireland is rapidly depleting and waste management costs are rising. Due to these factors waste management plans are seen as a good response to minimising waste on site and this thesis aims to investigate how to implement such a plan on a practical case study as well as investigating the legislation regarding construction and demolition waste along with market availability for the reuse of the waste. Main contractor surveys were also carried out in order to gain a better understanding of current attitudes within the industry and these surveys are analysed in chapter five. A survey was also carried out among sub-contractors but this survey has not been used for this thesis as the study is on-going. The primary aim of this thesis is to examine the waste hierarchy opportunities that are available for construction and demolition waste in Ireland and to examine the effects of management strategies on construction and demolition waste reduction at the project level. A partnership was developed with Carey Developments Ltd in Co. Galway and an analysis of their waste management practices was undertaken. The primary case study will be the ‘Taylors Hill’ project in Co. Galway where work commenced in March, 2012. The secondary aim of the thesis is to develop specific waste minimisation strategies for the company and to develop a training tool kit for use on site.
Resumo:
This plan was developed to assist Alburnett with the management, budgeting and future planning of their urban forest. Across the state, forestry budgets continue to decrease with more and more of that money spent on tree removal. With the anticipated arrival of Emerald Ash Borer (EAB), an invasive pest that kills native ash trees, it is time to prepare for the increased costs of tree removal and replacement planting. With proper planning and management of the current canopy in Alburnett, these costs can be extended over years and public safety issues from dead and dying ash trees mitigated. Trees are an important component of Alburnett’s infrastructure and one of the greatest assets to the community. The benefits of trees are immense. Trees provide the community with improved air quality, stormwater runoff interception, energy conservation, lower traffic speeds, increased property values, reduced crime, improved mental health and create a desirable place to live, to name just a few benefits. It is essential that these benefits be maintained for the people of Alburnett and future generations through good urban forestry management. Good urban forestry management involves setting goals and developing management strategies to achieve these goals. An essential part of developing management strategies is a comprehensive public tree inventory. The inventory supplies information that will be used for maintenance, removal schedules, tree planting and budgeting. Basing actions on this information will help meet Alburnett’s urban forestry goals.