973 resultados para Dies (Metal-working) - Design and construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design and construction of the otter board is a subject of great importance for economy in trawling. This review incorporates a historical resume tracing the change and development• of otter boards. The size of the otter board and its relationship with the horse power of the engine and size of the net and the methods of rigging are dealt with. The factors influencing the horizontal spread are discussed. The effect of the angles of attack, heel and tilt and the ground reaction on the force coefficients have been reviewed and discussed with particular reference to flat rectangular otter boards used for bottom trawling. A short account of other designs of otter boards used for improved efficiency is given. Suggestion for improving the efficacy of otter boards based on the work hitherto done has been made. The contributions relating to the various aspects of design and performance of trawl boards carried out till 1969 have been considered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fishing boats and canoes varied very little in Uganda from the middle of the 19th century umil 1949. types in use being the Dug Out Canoe. up to 40 ft. in length with 4 ft. beam hollowed from trees, and "Sesse" canoes which were used on Lake Victoria; these had an obvious Arab influence. The length of the "Sesse" in recent years as from about 1912 is 28 ft., and it is used as an open fishing craft.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A very efficient learning algorithm for model subset selection is introduced based on a new composite cost function that simultaneously optimizes the model approximation ability and model robustness and adequacy. The derived model parameters are estimated via forward orthogonal least squares, but the model subset selection cost function includes a D-optimality design criterion that maximizes the determinant of the design matrix of the subset to ensure the model robustness, adequacy, and parsimony of the final model. The proposed approach is based on the forward orthogonal least square (OLS) algorithm, such that new D-optimality-based cost function is constructed based on the orthogonalization process to gain computational advantages and hence to maintain the inherent advantage of computational efficiency associated with the conventional forward OLS approach. Illustrative examples are included to demonstrate the effectiveness of the new approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is focused on developing a highly detailed understanding of current organisational interactions and information flows leading to a definition of the process model for the environment into which information and communication technology (ICT) applications will be placed. The authors of this paper propose a theoretical process model and the associated detailed information structure which reflects the complexity of information, stakeholder interaction and intellectual property concerns which are currently seen in the construction industry. This is being developed and tested against a field study renovation project. The field study project identifies information flows and interactions between stakeholders such as designers, project managers, clients, contractors, subcontractors and suppliers. The process model which is being established shows very high levels of complexity in dependencies and interdependencies between implicit and explicit information within the project design and construction teams. Without an understanding of these detailed and complex process interactions, proposals for the application of ICT to the construction industry will not reflect the requirements of those for whom they are being developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents design, construction, and evaluation of a micropump for drug delivery applications. The proposed micropump consists of three components: fluidics, electronics, and software. The fluidics component includes a silicone elastic diaphragm, a microservo, housing and two check valves. The diaphragm is modeled and simulated to establish its geometrical specifications. The housing is built using a rapid prototype machine. The electronics component consists of a microcontroller, a microswitch array, a simple display and a power unit. The software component is written in C and receives inputs from user, controls the microservo speed and displays the programmed speed. A number of experiments are conducted to evaluate the performance and capabilities of the micropump. The experiments focus on measurement of flow rate, dosage and duration of operation. A discussion of the performance and capabilities of the developed micropump is also given.