978 resultados para Covered bridges


Relevância:

20.00% 20.00%

Publicador:

Resumo:

An atherosclerotic aneurysm of the right coronary artery complicated by a recent myocardial infarction was successfully treated with coronary artery stenting, using a device consisting of 2 stents with a layer of expandable polytetrafluorethylene (PTFE) placed between them. A follow-up angiograph 5 months after the procedure showed sustained initial results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To analyze the relationship between myocardial bridges and the anterior interventricular branch (anterior descending) of the left coronary artery. METHODS: The study was carried out with postmortem material, and methods of dissection and observation were used. We assessed the perimeter of the anterior interventricular branch of the left coronary artery using a pachymeter, calculated its proximal and distal diameters in relation to the myocardial bridge, and also its diameter under the myocardial bridge in 30 hearts. We also observed the position of the myocardial bridge in relation to the origin of the anterior interventricular branch. RESULTS: The diameters of the anterior interventricular branch were as follows: the mean proximal diameter was 2.76±0.76 mm; the mean diameter under the myocardial bridge was 2.08±0.54 mm; and the mean distal diameter was 1.98±0.59 mm. In 33.33% (10/30) of the cases, the diameter of the anterior interventricular branch under the myocardial bridge was lower than the diameter of the anterior interventricular branch distal to the myocardial bridge. In 3.33% (1/30) of the cases, an atherosclerotic plaque was found in the segment under the myocardial bridge. The myocardial bridge was located in the middle third of the anterior interventricular branch in 86.66% (26/30) of the cases. CONCLUSION: Myocardial bridges are more frequently found in the middle third of the anterior interventricular branch of the left coronary artery. The diameter of the anterior interventricular branch of the left coronary artery under the myocardial bridge may be smaller than after the bridge. Myocardial bridges may not provide protection against the formation of atherosclerotic plaque inside the anterior interventricular branch of the left coronary artery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Third Quarterly County information for Census of Employment & Wages - County

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Third Quarterly County information for Census of Employment & Wage, Statewide

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fourth Quarterly County information for Census of Employment & Wage, County

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fourth Quarterly County information for Census of Employment & Wage, Statewide

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the years, bridge engineers have been concerned about the response of prestressed concrete (PC) girder bridges that had been hit by over-height vehicles or vehicle loads. When a bridge is struck by an over-height vehicle or vehicle load, usually the outside and in some instances one of the interior girders are damaged in a bridge. The effect of intermediate diaphragms in providing damage protection to the PC girders of a bridge is not clearly defined. This analytical study focused on the role of intermediate diaphragms in reducing the occurrence of damage in the girders of a PC-girder bridge that has been struck by an over-height vehicle or vehicle load. The study also investigated whether a steel, intermediate diaphragm would essentially provide the same degree of impact protection for PC girders as that provided by a reinforced-concrete diaphragm. This investigation includes the following: a literature search and a survey questionnaire to determine the state-of-the-art in the use and design of intermediate diaphragms in PC-girder bridges. Comparisons were made between the strain and displacement results that were experimentally measured for a large-scale, laboratory, model bridge during previously documented work and those results that were obtained from analyses of the finite-element models that were developed during this research for that bridge. These comparisons were conducted to calibrate the finite element models used in the analyses for this research on intermediate diaphragms. Finite-element models were developed for non-skewed and skewed PC-girder bridges. Each model was analyzed with either a reinforced concrete or two types of steel, intermediate diaphragms that were located at mid-span of an interior span for a PC-girder bridge. The bridge models were analyzed for lateral-impact loads that were applied to the bottom flange of the exterior girders at the diaphragms location and away from the diaphragms location. A comparison was conducted between the strains and displacements induced in the girders for each intermediate-diaphragm type. These results showed that intermediate diaphragms have an effect in reducing impact damage to the PC girders. When the lateral impact-load was applied at the diaphragm location, the reinforced-concrete diaphragms provided more protection for the girders than that provided by the two types of steel diaphragms. The three types of diaphragms provided essentially the same degree of protection to the impacted, PC girder when the lateral-impact load was applied away from the diaphragm location.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During spermatogenesis, different genes are expressed in a strictly coordinated fashion providing an excellent model to study cell differentiation. Recent identification of testis specific genes and the development of green fluorescence protein (GFP) transgene technology and an in vivo system for studying the differentiation of transplanted male germ cells in infertile testis has opened new possibilities for studying the male germ cell differentiation at molecular level. We have employed these techniques in combination with transillumination based stage recognition (Parvinen and Vanha-Perttula, 1972) and squash preparation techniques (Parvinen and Hecht, 1981) to study the regulation of male germ cell differentiation. By using transgenic mice expressing enhanced-(E)GFP as a marker we have studied the expression and hormonal regulation of beta-actin and acrosin proteins in the developmentally different living male germ cells. Beta-actin was demonstrated in all male germ cells, whereas acrosin was expressed only in late meiotic and in postmeiotic cells. Follicle stimulating hormone stimulated b-actin-EGFP expression at stages I-VI and enhanced the formation of microtubules in spermatids and this way reduced the size of the acrosomic system. When EGFP expressing spermatogonial stem cells were transplanted into infertile mouse testis differentiation and the synchronized development of male germ cells could be observed during six months observation time. Each colony developed independently and maintained typical stage-dependent cell associations. Furthermore, if more than two colonies were fused, each of them was adjusted to one stage and synchronized. By studying living spermatids we were able to demonstrate novel functions for Golgi complex and chromatoid body in material sharing between neighbor spermatids. Immunosytochemical analyses revealed a transport of haploid cell specific proteins in spermatids (TRA54 and Shippo1) and through the intercellular bridges (TRA54). Cytoskeleton inhibitor (nocodazole) demonstrated the importance of microtubules in material sharing between spermatids and in preserving the integrity of the chromatoid body. Golgi complex inhibitor, brefeldin A, revealed the great importance of Golgi complex i) in acrosomic system formation ii) TRA54 translation and in iii) granule trafficking between spermatids.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The overarching goal of the proposed research was to evaluate the hydraulic performance of twenty two (22) fish-passage structures located in close proximity to bridges in western Iowa and within the HCA (Hungry Canyon Alliance) territory. Such structures include riprap weirs, fish ladders and grouted ripraps. The hydraulic performance of the aforementioned structures was evaluated via detailed field tests for a range of flow conditions relevant to fish migration through bridge waterways in different streams in western Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of cages of different material and shapes for cervical discectomy with fusion (ACDF) has increased during the last few years. The use of additional osteogenic material is controversial. We prospectively evaluated an empty, Plasmapore-covered titanium cage (PCTC) in 45 patients undergoing 58 ACDFs. Patients were evaluated using standard clinical and radiological criteria. Good to excellent outcome was achieved in 93%, 78% and 75% after 3, 12 and 48 months, respectively. Sixty-five percent of patients could resume their prior work after 48 months. Disc space height and lordosis could be preserved in all cases. Two percent of the treated levels showed subsidence and 2% increased segmental motion. There were no procedure-related complications. Implantation of an empty PCTC after microsurgical anterior cervical discectomy is a safe procedure with good results and low incidence of complications. Disc height and lordosis can be preserved with low incidence of subsidence and good fusion rates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Twelve regularly scheduled lettings and seven emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $492,299,871 were approved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Method for bridge deck overlays has been very successful in Iowa since its adoption in the 1970s. This method involves removal of deteriorated portions of a bridge deck followed by placement of a layer of den (Type O) Portland Cement Concrete (PCC). The challenge encountered with this type of bridge deck overlay is that the PCC must be mixed on-site, brought to the placement area and placed with specialized equipment. This adds considerably to the cost and limits contractor selection. A previous study (TR-427) showed that a dense PCC with high-range water reducers could successfully be used for bridge deck overlays using conventional equipment and methods. This current study evaluated the use of high performance PCC in place of a dense PCC for work on county bridges. High performance PCC uses fly ash and slag to replace some of the cement in the mix. This results in a workable PCC mix that cures to form a very low permeability overlay.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Headcuts (known also as primary knickpoints) and knickpoints (known also as secondary knickpoints) have been found to contribute to the accelerated riverbed degradation problem in the midwestern United States. Step-changes that occur at the head of channel networks are referred to as headcuts, and those that occur within the confines of channel banks are referred to as knickpoints. The formation of headcuts and knickpoints and their upstream migration have been linked to the over-steepening of stream reaches when the flow plunges to the bed and creates a plunge pool. Secondary flow currents and seepage are believed to be some other parameters contributing to the formation and evolution of headcuts and knickpoints. Ongoing research suggests that headcuts and knickpoints, where they form and migrate, may account for 60% (or more) of the bed erosion in the streams. Based on preliminary observations, there is a strong indication that headcuts and knickpoints can also have a greater influence on flow thalweg alignment (line of deepest flow) for small rivers. A shift in thalweg toward a riverbank or embankment is usually a prime factor contributing to riverbank erosion and scour.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Changes in agriculture operations over the past 35 years are having a dramatic impact on Iowa’s roads and bridges. The average size of an Iowa farm has increased to 352 acres in 2003, compared to 237 acres in 1970. Modern agricultural practices have also produced higher yields per acre, which means more grain to haul to market. In order to increase efficiency, farmers are beginning to use larger capacity wagons hauling more bushels per trip to the elevator, and using much heavier equipment in their farming operations. This trend is stressing Iowa bridges beyond the current capabilities to maintain them.