256 resultados para Corridors
Resumo:
Cover title.
Resumo:
Title from cover.
Resumo:
"Project: 91/087."
Resumo:
Highways are generally designed to serve a mixed traffic flow that consists of passenger cars, trucks, buses, recreational vehicles, etc. The fact that the impacts of these different vehicle types are not uniform creates problems in highway operations and safety. A common approach to reducing the impacts of truck traffic on freeways has been to restrict trucks to certain lane(s) to minimize the interaction between trucks and other vehicles and to compensate for their differences in operational characteristics. ^ The performance of different truck lane restriction alternatives differs under different traffic and geometric conditions. Thus, a good estimate of the operational performance of different truck lane restriction alternatives under prevailing conditions is needed to help make informed decisions on truck lane restriction alternatives. This study develops operational performance models that can be applied to help identify the most operationally efficient truck lane restriction alternative on a freeway under prevailing conditions. The operational performance measures examined in this study include average speed, throughput, speed difference, and lane changes. Prevailing conditions include number of lanes, interchange density, free-flow speeds, volumes, truck percentages, and ramp volumes. ^ Recognizing the difficulty of collecting sufficient data for an empirical modeling procedure that involves a high number of variables, the simulation approach was used to estimate the performance values for various truck lane restriction alternatives under various scenarios. Both the CORSIM and VISSIM simulation models were examined for their ability to model truck lane restrictions. Due to a major problem found in the CORSIM model for truck lane modeling, the VISSIM model was adopted as the simulator for this study. ^ The VISSIM model was calibrated mainly to replicate the capacity given in the 2000 Highway Capacity Manual (HCM) for various free-flow speeds under the ideal basic freeway section conditions. Non-linear regression models for average speed, throughput, average number of lane changes, and speed difference between the lane groups were developed. Based on the performance models developed, a simple decision procedure was recommended to select the desired truck lane restriction alternative for prevailing conditions. ^
Resumo:
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
Resumo:
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
Resumo:
The section of CN railway between Vancouver and Kamloops runs along the base of many hazardous slopes, including the White Canyon, which is located just outside the town of Lytton, BC. The slope has a history of frequent rockfall activity, which presents a hazard to the railway below. Rockfall inventories can be used to understand the frequency-magnitude relationship of events on hazardous slopes, however it can be difficult to consistently and accurately identify rockfall source zones and volumes on large slopes with frequent activity, leaving many inventories incomplete. We have studied this slope as a part of the Canadian Railway Ground Hazard Research Program and have collected remote sensing data, including terrestrial laser scanning (TLS), photographs, and photogrammetry data since 2012, and used change detection to identify rockfalls on the slope. The objective of this thesis is to use a subset of this data to understand how rockfalls identified from TLS data could be used to understand the frequency-magnitude relationship of rockfalls on the slope. This includes incorporating both new and existing methods to develop a semi-automated workflow to extract rockfall events from the TLS data. We show that these methods can be used to identify events as small as 0.01 m3 and that the duration between scans can have an effect on the frequency-magnitude relationship of the rockfalls. We also show that by incorporating photogrammetry data into our analysis, we can create a 3D geological model of the slope and use this to classify rockfalls by lithology, to further understand the rockfall failure patterns. When relating the rockfall activity to triggering factors, we found that the amount of precipitation occurring over the winter has an effect on the overall rockfall frequency for the remainder of the year. These results can provide the railways with a more complete inventory of events compared to records created through track inspection, or rockfall monitoring systems that are installed on the slope. In addition, we can use the database to understand the spatial and temporal distribution of events. The results can also be used as an input to rockfall modelling programs.
Resumo:
Retaining walls are important assets in the transportation infrastructure and assessing their condition is important to prolong their performance and ultimately their design life. Retaining walls are often overlooked and only a few transportation asset management programs consider them in their inventory. Because these programs are few, the techniques used to assess their condition focus on a qualitative assessment as opposed to a quantitative approach. The work presented in this thesis focuses on using photogrammetry to quantitatively assess the condition of retaining walls. Multitemporal photogrammetry is used to develop 3D models of the retaining walls, from which offset displacements are measured to assess their condition. This study presents a case study from a site along M-10 highway in Detroit, MI were several sections of retaining walls have experienced horizontal displacement towards the highway. The results are validated by comparing with field observations and measurements. The limitations of photogrammetry were also studied by using a small scale model in the laboratory. The analysis found that the accuracy of the offset displacement measurements is dependent on the distance between the retaining wall and the sensor, location of the reference points in 3D space, and the focal length of the lenses used by the camera. These parameters were not ideal for the case study at the M-10 highway site, but the results provided consistent trends in the movement of the retaining wall that couldn’t be validated from offset measurements. The findings of this study confirm that photogrammetry shows promise in generating 3D models to provide a quantitative condition assessment for retaining walls within its limitations.
Resumo:
Poor air quality has a huge detrimental effect, both economic and on the quality of life, in Australia. Transit oriented design (TOD), which aims to minimise urban sprawl and lower dependency on vehicles, leads to an increasing number of buildings close to transport corridors. This project aims at providing guidelines that are appropriate to include within City Plan to inform future planning along road corridors, and provide recommendations on when mitigation measures should be utilised.
Resumo:
The concept of a substantive integrator is introduced as a method for integrated resource and environmental management as a means to assimilate different resource values at the operational or field level. A substantive integrator is a strategic management tool for integrating multiple uses into coprorate management regimes that traditionally manage for single values. Wildlife habitat management is presented as a substantive integrator for managing vegetation on electric utility power line corridors. A case study from northern British Columbia provides an example of wildlife habitat management as a means to integrate other resource values such as aesthetics, access and subsistence along British Columbia Hydro and Power Authority's transmission rights-of-way.
Resumo:
Medeleven was a practice-based research work that challenged conventional notions of how audiences ‘experience’ contemporary dance. It resulted in a 40 minute ‘experiential’ performance that inverted the traditional ‘passive’ presentation paradigm by situating the audience centrally within the creative process. The ‘traditional presentation paradigm’ was inverted in numerous ways including: asking the audience onstage with the performers, placing swings onstage for the audience to play on during the performance and guiding the audience through backstage corridors before entering onstage – all of which added elements of physicality, agency and liminality to the performance not usually available to audience members of contemporary dance. Five dancers moved throughout the space allowing the audience to choose where and how they engaged with this work and the swings were utilised both as a performance space and for audience seating. In addition to these spatial variations, the quadraphonic soundscore created distinct ‘environments’ throughout the stage space that varied individual experience possibilities. By positing performance as an experiential phenomenon, the pivotal objective of this work was to create a live-art experience that extended its performativity to include audience members as active meaning-makers, challenging both their role within this paradigm and their expectations of contemporary dance. The work produced strong responses from the audience with surveys indicating the presentation format, as well as the construction of the work, changed audience experience and ability to connect with the dance work. The research suggested that, in addition to existing research on dance audiences, barriers to engagement with contemporary dance may include how the art is constructed and where the audience is positioned within that creative framework. The research builds upon artistic practices being undertaken throughout the world that challenge the notion of existing ‘passive’ performance paradigms via creative ‘engagement’ with audience.
Resumo:
President’s Report Hello fellow AITPM members, A few weeks ago we saw another example of all levels of Government pulling together in real time to try to deal with a major transport incident, this time it was container loads of ammonium nitrate falling off the Pacific Adventurer during Cyclone Hamish and the associated major oil spill due to piercing of its hull off Moreton Bay in southern Queensland. The oil spill was extensive, affecting beaches and estuaries from Moreton Island north to the Sunshine Coast; a coastal stretch of at least 60km. We saw the Queensland Government, Brisbane, Moreton Bay and Sunshine Coast Regional Council crews deployed quickly once the gravity of the situation was realised to clean up toxic oil on beaches and prevent extensive upstream contamination. Environmental agencies public and private were quick to respond to help affected wildlife. The Navy’s HMAS Yarra and another minesweeper were deployed to search for the containers in the coastal area in an effort to have them salvaged before all ammonium nitrate could leach into and harm marine habitat, which would have a substantial impact not only on that environment but also the fishing industry. all of this during the final fortnight before a State election.) While this could be branded as a maritime problem, the road transport and logistics system was crucial to the cleanup. The private vehicular ferries were enlisted to transport plant and equipment from Brisbane to Moreton Island. The plant themselves, such as graders, were drawn from road building and maintenance inventory. Hundreds of Councils’ staff were released from other activities to undertake the cleanup. While it will take some time for us to know the long term impacts of this incident, it seems difficult to fault “grassroots” government crews and their private counterparts, such as Island tourism staff, in the initial cleanup effort. From a traffic planning and management perspective, we should also remember that this sort of incident has happened on road and rail corridors in the past, albeit on lesser scales. It underlines that we do need to continue to protect communities, commercial interests, and the environment through rigorous heavy vehicle management, planning and management of dangerous goods routesincluding rail corridors through urban areas), and carefully considered incident and disaster recovery plans and protocols. I’d like to close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. SA Branch President Paul Morris informs me that we have had over 50 paper submissions to date, from which a very balanced and informative programme of sessions has been prepared. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker
Resumo:
President’s Report Hello fellow AITPM members, It is interesting to follow the news at present, where transport costs are getting a significant airing. Treasury Secretary Dr Ken Henry has enunciated something Australians may have considered extremely radical just a few years back, but in the present time appears to quite a few to be a realistic alternative. That being a rethink of the way we are charged for using our vehicles. It appears that serious consideration is being given to congestion charging, perhaps in place at least to some extent, of fuel excise. As a transport professional I am pleased that the debate has elevated to the national level, and would look forward that AITPM might contribute appropriately to it. As a motorist though, I naturally have my concerns about being hit in the hip pocket. Not that I actually drive during congested periods very much. I am fortunate to live five minutes either side of two well serviced bus corridors, one of which will eventually become a busway, and work in the central business district, which is hub from all spokes in Brisbane. As such, bus and foot are my preferred commute modes. Ah but I should not gloat, as my smart card fare is about to increase by 20 percent in the New Year! And if the newspapers are to be believed, further substantial increments are proposed over the coming few years. This is reported to recoup some more of the costs of actually providing the quality public transport system that we enjoy in our region. So I expect it will be very interesting to see how transport economics will play out in reality in the coming few years, and how governments cater to Australians who either cannot afford substantial increases in transport costs or have no viable alternatives to those facilities whose costs will increase. The 2010 AITPM National Conference, “What’s New?”, still has the opportunity for authors to submit an abstract for consideration so please consider how you might contribute to the event. Best regards to all, Jon Bunker
Resumo:
LUPTAI is a decision-aiding tool to enable local and state governments to optimise land use and transport integration. In contrast to mobility between land uses (typically via road), accessibility represents opportunity and choice to reach common land use destinations by public transport and/or walking. LUPTAI uses a GIS-based methodology to quantify and map accessibility to common land use destinations by walking and/or public transport. The tool can be applied to small or large study areas. It can be applied to the current situation in a study area or to future scenarios (such as scenarios involving changes to public transport services, public transport corridors or stations, population density or land use). The tool has been piloted on the Gold Coast and the results are encouraging. This paper outlines the GIS-based methodology and the findings related to this pilot study. The paper demonstrates benefits and possible application of LUPTAI to other urbanised local government areas in Queensland. It also discusses how this accessibility indexing approach could be developed into a decision-support tool to assist local and state government agencies in a range of transport and land-use planning activities.