996 resultados para Cook County (Ill.). Dept. of Corrections.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This report was financed in part by a grant from the U.S. Environmental Protection Agency under section 314 of the Clean Water Act."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Examines the financial status of the various public employee retirement systems in the Chicago, Cook County Area and the Illinois Municipal Retirement Fund (IMRF).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Prepared for the Auditor General to be presented to the Legislative Audit Commission and members of the General Assembly.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At head of title: State of California, the Resources Agency of California, Dept. of Water Resources.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"December 1989."